WELCOME TSG-S Hosted 3GPP2 Femto Cell Workshop OCTOBER 2007 Hyatt Harborside Boston 101 Harborside Drive, Boston, Massachusetts, USA Sponsored by Airvana Wireless SID: FEMTOCELL
15 October 2007 DRAFT 1 Online Access to Registration and Contributions Workshop website: Click “Meeting Electronic Sign In”
15 October 2007 DRAFT 2 Online Registration (1) Enter username/Password: femto/femto
15 October 2007 DRAFT 3 Online Registration (2) Enter address Click “Submit Form”
15 October 2007 DRAFT 4 Online Registration (3) Enter registration data and answer hotel questions Click “Update/Accept”
15 October 2007 DRAFT 5 Online Registration (4) Click “Back to FEMTO Home Page”
15 October 2007 DRAFT 6 Download Contributions (1) Click “Meeting Contributions”
15 October 2007 DRAFT 7 Download Contributions (2)
15 October 2007 DRAFT 8 Introductions Workshop Planning Team TSG-S Chair – Nick Yamasaki TSG-S WG1 Chair – Alex Gogic Airvana Coordinator – Doug Knisely Workshop Coordinator – Clif Barber (KDDI) Additional Planning Support –TSG-A ChairWasuke Sato (KDDI) –TSG-C ChairDennis Gentzler (Alltel) –TSG-X ChairBetsy Covell (Alcatel-Lucent)
15 October 2007 DRAFT 9 Agenda Overview S00-FEMTO GPP2 Femto Cell Workshop Agenda
15 October 2007 DRAFT 10 Note to Presenters In order to get through on time on Tuesday, time limitations will be strictly enforced. –For presentations longer than xx minutes, I will provide a 10 minute warning. –For all presentations, I will provide a 5 minutes warning. Please be prepared to start your presentation ON TIME. The clock starts running as soon as the previous presentation is complete.
15 October 2007 DRAFT 11 Agenda 1: Overview/Tutorial on Femto Cell Technology and High Level Architecture Monday 8:15 AM-12:30 PM Moderator: Clif Barber 009Overview of Femto CellsSAMSUNG15 8:15-8:30 016Tutorial on Femto Cell Technology and SIP/IMS-based Femto Network Architectures AIRVANA90 8:30-10:00 BREAK30 10: Huawei’s view on FemtoHUAWEI20 10:30-10:50 023Network Architecture - Alternatives and Tradeoffs for 3GPP2 Femto Cells QUALCOMM30 10:50-11:20 002SIP Based Architecture for Integration of 1xRTT Femto CellsTATARA SYSTEMS 30 11:20-11:50 005Standard Interfaces for FemtocellALCATEL- LUCENT 15 11:50-12:05 DISCUSSION25 12:05-12:30
15 October 2007 DRAFT 12 Agenda 2: High Level Requirements Monday 1:30-3:10 PM Moderator: Alex Gogic 003Status of 3GPP2 Femto Cell Requirements Work 3GPP2 TSG-S20 1:30-1:50 004Femto Cell Service Requirements and Issues KDDI20 1:50-2:10 DISCUSSION30 2:10-2:40 BREAK30 2:40-3:10
15 October 2007 DRAFT 13 Agenda 3: Radio Interface Issues with Femto Cells Monday 3:10-6:50 PM, Tuesday 8:00-9:30 AM Moderator: Ed Tiedemann SYSTEM SELECTION 008CDMA System Selection for Mobiles to Find/Use FemtocellsALCATEL- LUCENT 20 mins: 3:10-3:30 019Femto Access Control Provisioning and Enhanced System SelectionAIRVANA30 mins: 3:30-4:00 024Femto Cells –Search and System SelectionQUALCOMM30 mins: 4:00-4:30 INTERFERENCE MANAGEMENT 021Femto Air Interface Deployment Modeling, Simulation, and PerformanceAIRVANA20 mins: 4:30-4:50 025Interference Management in Femto-Cell DeploymentQUALCOMM60 mins: 4:50-5:50 007Femto Cell Active Hand-offs with Macro CellALCATEL- LUCENT 60 mins: 5:5-6:50 HANDOFFS AND MOBILITY 015Mobility for FemtoHUAWEI20 mins: 8:00-8:20 020Femto Air Interface Enhancements for Future Mobile DevicesAIRVANA45 mins: 8:20-9:05 DISCUSSION25 mins: 9:05-9:30
15 October 2007 DRAFT 14 Agenda 4: Architecture Decision Points Tuesday 9:30 AM-12:05, 1:15-2:00 PM Moderator: Betsy Covell 017 Femto Network Gateway Architecture and Stage 2 Description AIRVANA60 9:30-10:30 BREAK30 10:30-11: Femto Network Architecture ConsiderationsNORTEL20 11:00-11: Femto SIP/IMS and Convergence Server (CSRV) Architecture and Stage 2 Description AIRVANA45 11:20-12:05 LUNCH75 12:05-1: IMS Services for Femto CellALCATEL- LUCENT 20 1:15-1:35 DISCUSSION25 1:35-2:00
15 October 2007 DRAFT 15 Agenda 5: Femto Cell Standardization Work Plan Tuesday 2:00-3:15 PM Moderator: Eileen McGrath 003Status of 3GPP2 Femto Cell Requirements Work (slide 2) 3GPP2 TSG-S 022Femto Standards Schedule, Work Plan, & Way Forward AIRVANA15 2:00-2:15 DISCUSSION30 2:15-2:45 BREAK30 2:45-3:15
15 October 2007 DRAFT 16 Agenda 6: Summary of Workshop Outputs Tuesday 3:15-5:00 PM Moderator: Clif Barber Review of Workshop Summary DISCUSSION ADJOURNMENT
15 October 2007 DRAFT 17 Download Workshop Participants List (1) Workshop website: Click “Meeting Electronic Sign In”
15 October 2007 DRAFT 18 Download Workshop Participants List (2) Enter username/Password: femto/femto
15 October 2007 DRAFT 19 Download Workshop Participants List (3) Select “Click here to view attendance for a meeting”
15 October 2007 DRAFT 20 Download Workshop Participants List (4) Select “Detailed Version”
15 October 2007 DRAFT 21 Download Workshop Participants List (5) Save as html file or print as an Adobe file
15 October 2007 DRAFT 22 Thank You! For more information, please visit