WELCOME TSG-S Hosted 3GPP2 Femto Cell Workshop 15-16 OCTOBER 2007 Hyatt Harborside Boston 101 Harborside Drive, Boston, Massachusetts, USA 02128 Sponsored.

Slides:



Advertisements
Similar presentations
Introduction to the Online System for Reflections National PTA Reflections Winner Conrad Channell.
Advertisements

Fostering worldwide interoperabilityGeneva, July 2009 Use of cdma2000 ® Femto Cells for Home Network Applications Home Networking Global Standards.
Page 1 Norikazu - Nick Yamasaki KDDI Corporation Chair, TSG-S Upcoming Services and Systems Aspects for 3GPP2: 3GPP2 Future Directions and IMT-Advanced.
SMEtoLEAD Training of SMEs to Become Successful Coordinators of Framework Programme Projects Proposal Preparation & Submission FP6 Research & Innovation.
WELCOME TSG-S Hosted 3GPP2 Femto Cell Workshop OCTOBER 2007 Hyatt Harborside Boston 101 Harborside Drive, Boston, Massachusetts, USA Sponsored.
PWCS WINOCULAR WORKSPACE
All Rights Reserved © Alcatel-Lucent 2007 SOURCE:Dennis Ong, Alcatel-Lucent John Burgess Alcatel-Lucent CONTACT:
15-16 October 2007, 3GPP2 TSG-S Femto Cell Workshop Femto Cell Service Requirements and Issues Norikazu ( Nick ) Yamasaki Ryuhei Munakata KDDI Corporation.
1 Technology Readiness Maryland /2015 Admin Schedule 2 AssessmentOnline/CBT Testing Dates PARCC - PBAMarch 2 – May 8 MSA ScienceApril 13.
UConn ECE is your opportunity to take UConn courses while still in high school. The UConn ECE courses you will take are equivalent to the same course at.
Effective Date: March 16, 2012 Representatives must submit the following electronically: Request for appeal forms i561 and i501 The Disability Report-Appeal.
Introduction to PDE Webinars July Prepare for Your First Webinar Note: You may need help from technical support and/or your network guru. 1. Connect.
SOURCE:Chair, Editor CONTACT: Alex Gogic – TSG-S WG1 Mike Dolan – ABSTRACT: This contribution.
SUMMARY TSG-S Hosted 3GPP2 Femto Cell Workshop OCTOBER 2007 Hyatt Harborside Boston 101 Harborside Drive, Boston, Massachusetts, USA Sponsored.
April 1, Welcome! The 2015 B-13 Data Collection webinar will begin in a few moments. –Event number: –Event password: 2015B13 To hear.
Possible 3PP2 Changes Ed Tiedemann Chair, 3GPP2 TSG-C 6 August 2012.
1 Nick Yamasaki Chair, TSG-S 04 December 2008 Review of TSG-S Activities in 2008.
3GPP2 Femto Cell Workshop
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Broadband Wireless Access, RLANs, and Ad-Hoc Networking Jane Brownley Chair TR-45 Document No: GSC16-GRSC9-12.
Fostering worldwide interoperabilityGeneva, July 2009 cdma2000 ® Femto Activities Wireless access including RLANs and ad-hoc Networking Global Standards.
SUMMARY TSG-S Hosted 3GPP2 Femto Cell Workshop OCTOBER 2007 Hyatt Harborside Boston 101 Harborside Drive, Boston, Massachusetts, USA Sponsored.
3GPP2 IP Network Architecture Joint ETSI/3GPP/Parlay API Group April 8-12, 2002 Betsy Kidwell Chair, 3GPP2 TSG-N Ph: Fax:
1 Summary of TSG-S Femto Related Activities Nick Yamasaki (KDDI) - Chair New Orleans, LA, USA March 31, 2009.
Hosted by: Institute for Software Integrated Systems (ISIS) Vanderbilt University Software Reliability for FCS May 18-19, 2004 ARO Workshop.
*********** Enter your Enter your password Click here to Sign In.
3GPP2 Vision: System Release 6 & 7 Jane Brownley Chair, Vision Ad Hoc 1.
All Rights Reserved © Alcatel-Lucent 2007 SOURCE:Dennis Ong, Alcatel-Lucent John Burgess Alcatel-Lucent CONTACT:
1 17 February 2009 Subject:Draft Presentation for Femto Conference, March 2009 Date: 17 February 2009 Source: Airvana Contact: Doug Knisely
3GPP2 Organization Structure and Roles in Femtocell-Related Work
Cdma2000 Femto Standardization Activities in 3GPP2 Presenter: Douglas Knisely Airvana, Inc. Femtocell World Congress June 2009 Heathrow, UK.
5 November Overview of Proposed Femtocell Architecture Alternatives presented at the 3GPP2 Femto Workshop Airvana 5 November 2007 cdma2000® is the.
1 3GPP2 TSG-X All IP Multimedia Domain Bjorn Hjelm Alltel IMS MMD 2007 Dallas, TX Nov. 6-7, 2007.
TSG-S Project Coordination Recommendations Nick Yamasaki TSG-S Chair ABSTRACT: This document presents TSG-S recommendations for improved coordination of.
Cdma2000 Femto Standardization Activities in 3GPP2 … Femtocell World Summit June 21 st -23 rd, 2011 London, UK.
3GPP2 Femto Cell Workshop: System Selection, Interference Management, Handoffs and Mobility Ed Tiedemann 15 October 2007.
eHRPD (evolved High Rate Packet Data)
Cdma2000 Femto Standardization Activities in 3GPP2 Presenter: Peerapol Tinnakornsrisuphap Qualcomm Femtocell Americas November 16 th -17 th, 2009 San Diego,
Introduction to 3GPP2 cdma2000 Technology Workshop Ms. Jane Brownley Chair, 3GPP2 Steering Committee
Doc.: IEEE /044r6 Submission January 2004 Al Petrick, IceFyre, Tim Godfrey, Intersil, Doug Hock Slide 1 Electronic Attendance and Server Update.
Welcome Ms. Cheryl Blum Chair, 3GPP2 Steering Committee
3GPP2 IP Multimedia Domain 3GPP CN Plenary June 5, 2002 Betsy Kidwell Chair, 3GPP2 TSG-N Ph: Fax: Ph: Fax:
Future Meetings for TSG-S TSG-S Chair Nick Yamasaki (KDDI) 21 July
In addition to our other quality services, we now offer a Web Accessible Database to view, print, or download your Calibration and Gas Analysis reports.
3GPP2 Specification Development David Crowe cdma2000 Technology Workshop June 14, 2012 – Guangzhou, China Draft Version 0.1.
Machine-to-Machine(M2M) Communication for cdma2000 Systems Orlett W. Pearson, 3GPP2 LS to TR-50 April 2011.
Machine-to-Machine(M2M) Communication for cdma2000 Systems Orlett W. Pearson, 3GPP2 Liaison Report to TR-50 August 2012.
MASSACHUSETTS UNDERGROUND STORAGE TANK (UST) DATA MANAGEMENT SYSTEM COMPLETING THE COMPLIANCE CERTIFICATION MassDEP, Bureau of Air and Waste.
Adviser Panel. Go to All DD Track Advisers: Click “Advisor Login”
The 3GPP2 Vision Jane Brownley ALU Nick Yamasaki KDDI
Metrology SG Closing Report – Session #79 Clif Barber (KDDI)
Subject:Proposed Liaison from TSG-X to BBF Date: 21 August 2009 Source: Chair, FMOAHG Airvana Contact: Doug Knisely cdma2000® is the.
Submission doc.: IEEE /1214r0 November 2015 Jon Rosdahl, CSR-QualcommSlide 1 1st Vice Chair Report November Dallas Date: Authors:
3GPP2 Restructuring Source: TSG-A Chairman; Xiaowu Zhao TSG-C Chairman; Ed Tiedemann TSG-S Chairman; Nick Yamasaki TSG-X Chairman; Marvin Bienn Copyright.
C Title: Next Steps for Femtocells Date: 03 December 2007 Source: Airvana, Alcatel-Lucent, Nortel Abstract:The contribution addresses.
3GPP2 TSG-SX Structure & Working Procedure Source: TSG-SX Chairman: Xiaowu(Frankle) Zhao TSG-SX Vice-Chair: Yuezhen Wang/Mike Dolan, Copyright Notice 3GPP2.
Managerial Accounting for Business Professionals ACC 330 UNIT 1 Dr. Doug Letsch I am online waiting for the live session to begin. If you have a general.
TestNav: Pearson’s Online Testing Engine Training and Practice Item Review Colorado Summative Science and Social Studies Field Test Spring 2013 Call in:
How to Complete B-13 Checklists in CIMS How to Complete B-13 Checklists in CIMS A Presentation for Transition Coordinators (TCs) and Transition Coordinator.
Ajay Rajkumar, Chair WG Joint Opening Plenary IEEE Session #10 M edia Independent Handover Services Garden Grove, CA Ajay Rajkumar
3GPP2 Special Workshop on 3GPP2 Future Directions and IMT-Advanced Initial Workshop Report Ed Tiedemann (Qualcomm)Chair Clif Barber (KDDI)Secretary
1 Notice Contributors grant a free, irrevocable license to 3GPP2 and its Organization Partners to incorporate text or other copyrightable material contained.
Overview of TSG-X Femto Standardization Activities
Wireless Access including RLANS & ad-hoc Networking
ELC Blackboard Orientation
How to plan deliverables
Iso Leso - Visionstryt Online CPD Platform – Help File
Wireless Access including RLANs and Ad-Hoc Networking
1st Vice Chair Report November Dallas
Presentation transcript:

WELCOME TSG-S Hosted 3GPP2 Femto Cell Workshop OCTOBER 2007 Hyatt Harborside Boston 101 Harborside Drive, Boston, Massachusetts, USA Sponsored by Airvana Wireless SID: FEMTOCELL

15 October 2007 DRAFT 1 Online Access to Registration and Contributions Workshop website: Click “Meeting Electronic Sign In”

15 October 2007 DRAFT 2 Online Registration (1) Enter username/Password: femto/femto

15 October 2007 DRAFT 3 Online Registration (2) Enter address Click “Submit Form”

15 October 2007 DRAFT 4 Online Registration (3) Enter registration data and answer hotel questions Click “Update/Accept”

15 October 2007 DRAFT 5 Online Registration (4) Click “Back to FEMTO Home Page”

15 October 2007 DRAFT 6 Download Contributions (1) Click “Meeting Contributions”

15 October 2007 DRAFT 7 Download Contributions (2)

15 October 2007 DRAFT 8 Introductions Workshop Planning Team TSG-S Chair – Nick Yamasaki TSG-S WG1 Chair – Alex Gogic Airvana Coordinator – Doug Knisely Workshop Coordinator – Clif Barber (KDDI) Additional Planning Support –TSG-A ChairWasuke Sato (KDDI) –TSG-C ChairDennis Gentzler (Alltel) –TSG-X ChairBetsy Covell (Alcatel-Lucent)

15 October 2007 DRAFT 9 Agenda Overview S00-FEMTO GPP2 Femto Cell Workshop Agenda

15 October 2007 DRAFT 10 Note to Presenters In order to get through on time on Tuesday, time limitations will be strictly enforced. –For presentations longer than xx minutes, I will provide a 10 minute warning. –For all presentations, I will provide a 5 minutes warning. Please be prepared to start your presentation ON TIME. The clock starts running as soon as the previous presentation is complete.

15 October 2007 DRAFT 11 Agenda 1: Overview/Tutorial on Femto Cell Technology and High Level Architecture Monday 8:15 AM-12:30 PM Moderator: Clif Barber 009Overview of Femto CellsSAMSUNG15 8:15-8:30 016Tutorial on Femto Cell Technology and SIP/IMS-based Femto Network Architectures AIRVANA90 8:30-10:00 BREAK30 10: Huawei’s view on FemtoHUAWEI20 10:30-10:50 023Network Architecture - Alternatives and Tradeoffs for 3GPP2 Femto Cells QUALCOMM30 10:50-11:20 002SIP Based Architecture for Integration of 1xRTT Femto CellsTATARA SYSTEMS 30 11:20-11:50 005Standard Interfaces for FemtocellALCATEL- LUCENT 15 11:50-12:05 DISCUSSION25 12:05-12:30

15 October 2007 DRAFT 12 Agenda 2: High Level Requirements Monday 1:30-3:10 PM Moderator: Alex Gogic 003Status of 3GPP2 Femto Cell Requirements Work 3GPP2 TSG-S20 1:30-1:50 004Femto Cell Service Requirements and Issues KDDI20 1:50-2:10 DISCUSSION30 2:10-2:40 BREAK30 2:40-3:10

15 October 2007 DRAFT 13 Agenda 3: Radio Interface Issues with Femto Cells Monday 3:10-6:50 PM, Tuesday 8:00-9:30 AM Moderator: Ed Tiedemann SYSTEM SELECTION 008CDMA System Selection for Mobiles to Find/Use FemtocellsALCATEL- LUCENT 20 mins: 3:10-3:30 019Femto Access Control Provisioning and Enhanced System SelectionAIRVANA30 mins: 3:30-4:00 024Femto Cells –Search and System SelectionQUALCOMM30 mins: 4:00-4:30 INTERFERENCE MANAGEMENT 021Femto Air Interface Deployment Modeling, Simulation, and PerformanceAIRVANA20 mins: 4:30-4:50 025Interference Management in Femto-Cell DeploymentQUALCOMM60 mins: 4:50-5:50 007Femto Cell Active Hand-offs with Macro CellALCATEL- LUCENT 60 mins: 5:5-6:50 HANDOFFS AND MOBILITY 015Mobility for FemtoHUAWEI20 mins: 8:00-8:20 020Femto Air Interface Enhancements for Future Mobile DevicesAIRVANA45 mins: 8:20-9:05 DISCUSSION25 mins: 9:05-9:30

15 October 2007 DRAFT 14 Agenda 4: Architecture Decision Points Tuesday 9:30 AM-12:05, 1:15-2:00 PM Moderator: Betsy Covell 017 Femto Network Gateway Architecture and Stage 2 Description AIRVANA60 9:30-10:30 BREAK30 10:30-11: Femto Network Architecture ConsiderationsNORTEL20 11:00-11: Femto SIP/IMS and Convergence Server (CSRV) Architecture and Stage 2 Description AIRVANA45 11:20-12:05 LUNCH75 12:05-1: IMS Services for Femto CellALCATEL- LUCENT 20 1:15-1:35 DISCUSSION25 1:35-2:00

15 October 2007 DRAFT 15 Agenda 5: Femto Cell Standardization Work Plan Tuesday 2:00-3:15 PM Moderator: Eileen McGrath 003Status of 3GPP2 Femto Cell Requirements Work (slide 2) 3GPP2 TSG-S 022Femto Standards Schedule, Work Plan, & Way Forward AIRVANA15 2:00-2:15 DISCUSSION30 2:15-2:45 BREAK30 2:45-3:15

15 October 2007 DRAFT 16 Agenda 6: Summary of Workshop Outputs Tuesday 3:15-5:00 PM Moderator: Clif Barber Review of Workshop Summary DISCUSSION ADJOURNMENT

15 October 2007 DRAFT 17 Download Workshop Participants List (1) Workshop website: Click “Meeting Electronic Sign In”

15 October 2007 DRAFT 18 Download Workshop Participants List (2) Enter username/Password: femto/femto

15 October 2007 DRAFT 19 Download Workshop Participants List (3) Select “Click here to view attendance for a meeting”

15 October 2007 DRAFT 20 Download Workshop Participants List (4) Select “Detailed Version”

15 October 2007 DRAFT 21 Download Workshop Participants List (5) Save as html file or print as an Adobe file

15 October 2007 DRAFT 22 Thank You! For more information, please visit