The Soft-IOC Based Alarm Handler – an Operations View Pam Gurd October 31, 2007.

Slides:



Advertisements
Similar presentations
JQuery MessageBoard. Lets use jQuery and AJAX in combination with a database to update and retrieve information without refreshing the page. Here we will.
Advertisements

Using the AiM® Customer Request Module Follow the red arrows as we go through the presentation. Your screen will look similar to this one when you first.
Make This work with EPICS! 2006
SNS Integrated Control System SNS RDB Requirements, wish list, status A little history l Oracle RDB used exclusively by accelerator physics group l JERI.
My Task List Pam Gurd October 31, O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Title_date Overview HPRF IOCs Cryo IOCs Soft IOCs.
Introduction to Alarm Handlers Randy Flood Karen Schroeder AOD/OPS.
EPICS Channel Access Overview 2006
Soft-IOC Based Alarm Handler Pam Gurd July 14, 2006.
LCLS Control System Overview Mike Zelazny SLAC ICD Software Department Accelerator Directorate.
© 2011 PetroSkills, LLC. All rights reserved Launch your PetroSkills company web browser. 2. Enter your User ID and Password. 3. Click the Login.
Best Ever Alarm System Toolkit Kay Kasemir, Xihui Chen, Katia Danilova SNS/ORNL April, 2013.
Raymond R. Balise Health Research and Policy
Downloading and Installing AutoCAD Architecture 2015 This is a 4 step process 1.Register with the Autodesk Student Community 2.Downloading the software.
Managed by UT-Battelle for the Department of Energy Kay Kasemir ORNL/SNS Jan Control System Studio Training - Alarm System Use.
Ch 9 Managing Active Directory User Accounts. Objectives Create Organizational Unit Creating User Accounts in Active Directory Disabling, Enabling, and.
Managed by UT-Battelle for the Department of Energy Kay Kasemir ORNL/SNS April 2013 Control System Studio Training - Alarm System Use.
DB Audit Expert v1.1 for Oracle Copyright © SoftTree Technologies, Inc. This presentation is for DB Audit Expert for Oracle version 1.1 which.
DEMONSTRATION FOR SIGMA DATA ACQUISITION MODULES Tempatron Ltd Data Measurements Division Darwin Close Reading RG2 0TB UK T : +44 (0) F :
Welcome To. Improving Remote File Transfer Speeds By The Solution For: %
Ch 8-3 Working with domains and Active Directory.
Ch 11 Managing System Reliability and Availability 1.
Dirk Zimoch, KSTAR Meeting 2009 Auto Save and Restore.
Linux Operations and Administration
MagicInfo Pro Server Software All control, content, and scheduling is performed within the MagicInfo Pro Server software previously installed. Before.
Channel Archiver Stats & Problems Kay Kasemir, Greg Lawson, Jeff Patton Presented by Xiaosong Geng (ORNL/SNS) March 2008.
Channel Archiver Introduction 2006
SNS Integrated Control System EPICS IOCs – Relational DB Connectivity Bridge A. Liyu, A. Zhukov.
EPICS and EDM Overview 03 October 2008 Matt Boyes EPICS and EDM Overview Lecture 1 Matt Boyes.
0Gold 11 0Gold 11 LapLink Gold 11 Firewall Service How Connections are Created A Detailed Overview for the IT Manager.
CANADA’S NATIONAL LABORATORY FOR PARTICLE AND NUCLEAR PHYSICS Owned and operated as a joint venture by a consortium of Canadian universities via a contribution.
© 2003 Everett Public Schools Information Systems and Technology Department Getting Started with FirstClass October 10, 2015.
VistA Imaging Capture via Scanning. October VistA Imaging Capture via Scanning The information in this documentation includes only new and updated.
Faculty Webpage Design Minimum Requirements. Go to: then High Schoolhttp://gcsc.groupfusion.net/
Patrick Bailey, MS IDIS110 Dreamweaver Setup. IDIS110 - RIT After you start Dreamweaver On the first time, if you are asked, select “Design Mode” Otherwise,
Linux Operations and Administration
Soft-IOC Based Alarm Handler Pam Gurd May 25, 2006.
Using Flashcard machine. Go to and log in. Click on Create a new flashcard set as before and fill in.
General Time Update David Thompson Epics Collaboration Meeting June 14, 2006.
Diagnostic Pathfinder for Instructors. Diagnostic Pathfinder Local File vs. Database Normal operations Expert operations Admin operations.
Managed by UT-Battelle for the Department of Energy Kay Kasemir ORNL/SNS Oct EPICS Meeting, PAL, Korea Control System Studio Training.
SNS Alarm System Status Curtis Dunn Control System Suite/Eclipse Frameworks Workshop EPICS Collaboration Meeting June 12-16, 2006.
Inventory Skills Entering the Counts What this tutorial covers—and doesn’t Inventory tasks 1. Record transfers 2. Report losses 3. Get organized 4. Print.
ICS – Software Engineering Group 1 IOC Operations at SNS Carl Lionberger.
Managed by UT-Battelle for the Department of Energy Kay Kasemir ORNL/SNS 2011, October at CEA Saclay, France Control System Studio.
At the SNS Kay Kasemir, Xiaosong Geng, Dave Purcell ORNL/SNS March 2008.
ITGS Network Architecture. ITGS Network architecture –The way computers are logically organized on a network, and the role each takes. Client/server network.
Channel Access Client Coding 2006
ROCS Web Based Reporting Tool Using SNS Relational Database By Katia Danilova, Ernest L. Williams Jr. Control Systems group, ASD, SNS.
HINS Sharon Lackey July 10, What is Autosave?  Autosave is an EPICS extension that: Automatically saves settings in an ioc when they.
Applications Kay Kasemir ORNL/SNS Using Information and pictures from Matthias Clausen, Jan Hatje, and Helge Rickens (DESY) October 2007.
Stanford Linear Accelerator Center Michael Zelazny EPICS Collaboration Meeting Dec 3&4, Channel Watcher Bumpless Reboot Replacement Related Web Page:
Controls Zheqiao Geng Oct. 12, Autosave Additions/Upgrades and Experiences at SLAC Zheqiao Geng Controls Department SLAC National Accelerator Laboratory.
How a Soldier can print their own Profiles on AKO My Medical Readiness
Advanced Task Engine Doing Cool Stuff with Cool stuff!
XAL based PV Browser Jeff Patton, Chris Fowlkes EPICS Collaboration Meeting – RDB SIG June 12, 2006.
SNS Integrated Control System EPICS IOCs – Relational DB Connectivity Bridge A. Liyu, A. Zhukov.
Channel Access Security 2006 O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 2 Channel Access Security  The IOC Application.
Virtual Machines Module 2. Objectives Define virtual machine Define common terminology Identify advantages and disadvantages Determine what software is.
© ExplorNet’s Centers for Quality Teaching and Learning 1 Describe applications and services. Objective Course Weight 5%
TELEPORT PRO Website to Hard Drive Completely download a website, enabling you to “Browse Offline” at much greater speeds than if you were to browse the.
Managed by UT-Battelle for the Department of Energy Quest for the Best Ever Alarm System Tool Kay Kasemir Oct
Best Ever Alarm System Toolkit Kay Kasemir, Xihui Chen, Katia Danilova, SNS/ORNL ICALEPCS 2009, Kobe, Japan, Oct 2009.
Monitoring Dynamic IOC Installations Using the alive Record Dohn Arms Beamline Controls & Data Acquisition Group Advanced Photon Source.
Using the AFRESH software Ruaraidh Dobson University of Aberdeen V1.0 27/04/2016.
Millennium Create Lists in Action
The things you need to know to get your gradebook going again!!
Multi-host Internet Access Portal (MIAP) Enhancement Guide
EPICS IOCs – Relational DB
Banafsheh Hajinasab Based on presentation by K. Strnisa, Cosylab
Commissioning the European XFEL cryogenic system and best practice
Presentation transcript:

The Soft-IOC Based Alarm Handler – an Operations View Pam Gurd October 31, 2007

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Title_date Why?  Wanted to be able to incorporate alarm summaries in edm screens  And to call edm screens from alarm screens.

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Title_date What?  Set of scripts to create soft IOCs from alarm configuration files.  A soft IOC is an EPICS IOC that runs on a Linux server, usually with other soft IOCs.  The soft IOC alarm servers:  cryo-ics-softioc2 – cryo alarms  ics-srv-softioc3 – everything else

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Title_date Configuration Files  Alarms may be configured using old-style.alhConfig files or new.xml files.  (but the.alhConfig file needs an.xml wrapper)  (controls) Who is supposed to help operators who want to change alarm configurations?  (operations) Will somebody be in charge of configuration control?

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Title_date edm Screens – Top Alarm Screen

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Title_date edm screens – Legend

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Title_date edm Screens – Top-Level Summary Click in here for details (Alarm details or edm screen from system) Click to change disable status This icon includes current status, latch status, disable status and unmasked status. You can copy it to your own screen.

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Title_date Summary Screen Note that this doesn’t include everything. In particular, it doesn’t include HPRF.

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Title_date A Bit of Philosophy  3 kinds of status:  Latch  Operating status (as masked)  Current Status  2 levels of masking  1-click “Ack” – until the alarm goes away  2-click “Disable” – until you click again  (plus machine mode masking, which is configured only in a few places)  Alarms may be masked at any level.

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Title_date A bit about how things work vxWorks IOCs Alarm soft IOCs ics-srv-softioc3cryo-ics-softioc2 Soft IOC servers PVs in these processorsAre watching PVs in these processors Which are connected to reality

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Title_date A bit about how things work  Alarms come from PVs in the IOCs (usually vxWorks systems)  Limit and severity settings are in the IOC  Fields like HIHI, HIGH, LOW, LOLO, HHSV, OSV must be saved in the IOC save/restore (or not changed) or they’ll be lost on IOC reboot.  Also, you need access to the IOC to change them.  Masks are part of the alarm handler  The alarm soft IOC save file includes them automatically.

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Title_date edm Screens – Mid-Level Summary Click for details (edm screen from system, if configured) Click to change disable status Here’s another icon you could copy to your own screen. Click for alarm configuration details

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Title_date Top-Level Menu  (When you click on one of the system square icons)

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Title_date Alarm Logs These are only for a specific system.

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Title_date Alarm Logs from Oracle Get there from the Controls Web page, then “ROCS”, then “Alarm Logs”. Ask Katia for help with the query.

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Title_date edm Screens – Alarm Configuration  Different screens for different record types Parameters in this area live in the alarm soft IOC. Parameters in this area live in the vxWorks IOC. You only have access if you have access to PVs in the vxWorks IOC. They’re only saved and restored if they’re in the vxWorks IOC save request file.

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Title_date Configuration Details  Each summary or PV can have an associated edm display, edm menu or web page.  But not very many are configured.  Each summary or PV can have a description.  Each summary can be automatically disabled based on machine mode.

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Title_date Compact Screen Each little square represents an alarm PV. You can “Ack” an alarm by a single click, “Dis”able by a double click, identify it by a mouse-over, or get to a detail screen by a right click. Similarly, you can control or display the summaries.

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Title_date New Alarms The only “new” system is FE. I haven’t included that because it seems to have too many alarms to be useful.

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Title_date Future Developments (Only one left, but it’s a biggie.)  Provide a way for Ops to do configuration and boot soft IOCs. (Actually, there were also those requests about tree displays.)

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Title_date Before I forget everything  You can try calling me at (That’s NØ IS DavePG.)  But I might be busy…