All Island TSO Facilitation of Renewable Studies- Ireland II Ravi Sundaria Jay Panchal.

Slides:



Advertisements
Similar presentations
RES-E Impact on Transmission Grid and Power System Reserves
Advertisements

Study Committee Representatives Annual Report December, 2012
Aidan Tuohy Sr. Project Engineer NWPCC Flexibility Metric Roundtable April 2013 Metrics and Methods to Assess Power System Flexibility.
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
ERCOT VRT Study, Phase I ERCOT ROS Meeting December 10, 2009.
Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
Challenge of Large Scale Wind Power Integration - Introduction to the Workshop Pradeep Perera Principal Energy Specialist Asian Development Bank.
Secure System Scheduling with High Wind Penetrations J. Kennedy March 2009.
Wind farms with HVDC delivery in Load Frequency Control Lingling Fan April 22, 2010.
Study of Wind Energy Penetration in the Iberian Peninsula RED ELÉCTRICA DE ESPAÑA 1 WIND POWER GENERATION Study of Wind Energy Penetration in the Iberian.
The Integration of Renewable Energy onto the Existing Grid Dr Norman MacLeod Technical Director, HVDC.
Frankfurt (Germany), 6-9 June 2011 Coordination between TSOs and DSOs – a necessity for system planning and operation Dr. Ralph Pfeiffer Amprion GmbH 1.
System Strength Discussion
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
Technical Advisory Committee December 6, 2010 Summary of the CREZ Reactive Study Warren Lasher Manager, Long-Term Planning and Policy.
Aidan Tuohy Technical Leader/Project Manager, EPRI ERCOT Emerging Technology Working Group (ETWG) 09/24/2014 Transmission System Considerations for Integrating.
Power Systems Consulting and Software 4 March 2004 BWEA Conference: UK Offshore Wind 2004 Integration of Offshore Wind Farms into the Local Distribution.
Analysis of wind energy with pumped storage systems in autonomous islands George Caralis Mechanical Engineer NTUA National Technical University of Athens.
2001 South First Street Champaign, Illinois (217) Davis Power Consultants Strategic Location of Renewable Generation Based on Grid Reliability.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
Grid Compliance and Wind turbines in weak and Island grids –
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
 UK Power Networks. All rights reserved Demonstrating the benefits of energy storage on an 11 kV Distribution Network Matthieu Michel – Technology.
1 Cheng-Ting Hsu Chao-Shun Chen Islanding Operations for the Distribution Systems with Dispersed Generation Systems Department of Electrical Engineering.
Voltage Collapse M. H. Sadeghi Winter 2007 KNTU. Power System Stability IEEE: Power system stability is defined as the capability of a system to maintain.
Barcelona– May 2003 CIRED’2003 Beta session 4a: Distributed Generation Controllability of DG helps managing Distribution Grids J. A. Peças Lopes
WECC Load Model Sensitivity Study “ An Analysis of the Sensitivity of WECC Grid Planning Models to Assumptions Regarding the Composition of Loads ” Task.
Prospects of Wind and Pumped Storage systems’ integration in Greek islands George Caralis Mechanical Engineer NTUA Wind Energy Laboratory.
AFREPREN/FWD Cogen Centre Training Workshop on Cogeneration in Africa
Conclusions Innovative application of induction and synchronous generators in autonomous small hydropower plant Prof. M.T.E. Kahn NeuroMorphoGenics/NMG.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
Voltage grid support of DFIG wind turbines during grid faults
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
1 Mid-Continent Area Power Pool Wind Integration Studies Edward P. Weber August 16, 2007.
SLIDE 1 ISSUES AND PRACTICAL EXPERIENCES WITH CONNECTION OF WIND FARMS TO WEAK AC NETWORKS June 2013 PRESENTED BY BABAK BADRZADEH.
K E M A T & D C O N S U L T I N G Power System Conference, Clemson, South Carolina, March 8-11, 2005 Principles and Issues Relating to the Interconnection.
Power Management of Wind Turbines presented by: Barry Rawn MASc Candidate University of Toronto Wind Power Generation Symposium- February 20th, 2004 SF1105.
DS2 – Grid Integration Dynamic Modelling of Wind Generation in Ireland
Daudi Mushamalirwa Luanda June, 2014 Technical issues of the stability of small size electric systems composed of wind generators and conventional generating.
Managing a Power System with 40% Wind Dr Alan Rogers EirGrid.
Steady State Analysis Of A Microgrid Connected To A Power System
Integrating Wind Energy Capabilities of Wind Power Plants Mark Ahlstrom Wind Energy: A Good Citizen of the Electric Grid Four Corners Wind Resource Center.
Delivering for 2020 TSO Facilitation of Renewables Studies EirGrid Customer Conference Jonathan O’Sullivan October 2009.
Synchronous Inertial Response
Recent TSO report on changes because of larger amounts of renewable enery IEA Task 25, January 14, 2016 Edf – Clamart – Paris – France Lennart Söder Professor.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
RFPEG2013 PRE-BID MEETING RFPEG2013 – Pre-Bid meeting January 9, 2014 Presentation by Derek Davis – Public Utilities Commission.
Full Converter Wind Turbine Operating under Weak Grid Conditions Daniel Mueller, Walter Kuehn Frankfurt University of Applied Sciences Germany 1.
TECHNICAL PAPER ON SIMULTANEOUS AC-DC POWER TRANSMISSION
SEMINAR ON ISLANDING BY PAWAN. What is islanding? Normally all Power generators are interconnected to form a network called ‘GRID’. Some times it so happens.
INSTITUTE OF POWER ENGINEERING GDAŃSK DIVISION Some Results of the Study „ Integration Possibilities of Wind Energy with the Polish.
Agenda TSOG 8th November
Power Electronics and Control in Wind Energy Conversion Systems
A Project Review On POWER QUALITY IMPROVEMENT IN GRID USING STATECOM
DS3 and Qualifier Trials Update
IG BASED WINDFARMS USING STATCOM
Control Schemes for Distribution Grids with Mass Distributed Generation AUTHOR: UMAIR SHAHZAD.
Columbia Grid Wind Integration Study Team Dynamic Transfer Capability Studies Update 9/10/09.
Challenges of integrating Variable Renewable Energy Sources (V-RES)
Experiences with Wind Plants and Stability Studies in Isolated Systems
POWER SYSTEM ANALYSIS INTRODUCTION.
EU-IPA12/CS02 Development of the Renewable Energy Sector
Mid-Continent Area Power Pool
UNIT V STABILITY ANALYSIS 9
Ilkka Jokinen Taavi Heikkinen
Palo Verde-COI RAS Retirement
Palo Verde-COI RAS Retirement
National Institute of Wind Energy(NIWE)
Ciara O’Dwyer Damian Flynn ESRI/UCD conference 17/09/2019
Presentation transcript:

All Island TSO Facilitation of Renewable Studies- Ireland II Ravi Sundaria Jay Panchal

Contents 1.Background of study 2.Methodology and key assumption 3. Key results 4.Impacts of operational strategies. 5.Recommendation to Future work 6.Conclusion 7.Summary 8.Observations

Background Future system Government in Ireland has set a binding electricity target of 40% from renewable resources by 2020 Base study- implications for the real time operation of the power system studied in All Island Grid Study [DCENR (2008)] Objective -technical and operational implications associated with high shares of wind power

Methodology and Assumptions  EIRgrid and SONI (2009 ) provide requirement for voltage frequency stability  Wind Input data Years (15 min interval)  63 dispatch cases are considered  Peak wind generation 7550 MWs 90 % of installed capacity

2020 generation portfolio from AIGS Installed – 2210 new OCGT for high flexibility however committed is used for technical studies Base Renewable – biomass and tidal Other Renewable- run of river hydro power plants Storage- pumped hydro power plants

Modeling for Stability studies  Tools 1.Siemens power system simulation package- fault and stability analysis 2. System frequency model frequency response and regulation  Rate of change of frequency relay (ROCOFs)  Different wind turbine models Doubly Fed Induction generators Full converter wind turbine generators

Key Results Classification of issues

Operational metrics

1. Issues that imposes fundamental operational limit Loss of largest infeed  Issue- Frequency instability Change in active power Less load- high f, more load – low f Load shedding -0.7 hz Curtailment of wind power hz Kinetic energy in rotating mass= inertia inertia opposes the frequency change

Result 1 Cont.

 Technical mitigation measures Synchronous compensator mode Emulated inertia from wind turbines Result 1 Cont.

2. Issues may impose operational limits but need further analysis  Issue- Frequency excursion due to network faults Wind turbine generators need more time to restore active power than conventional generators Grid code – 90% of active power within 1 sec of voltage recovery

Result 2 Cont.

On ROCOF 0.6 hz /s operational metric 1> % may be unstable  Technical mitigation measures greater curtailment of wind Frequency protection trip setting  Further study required in Inertial response of wing turbine generators Modern wind turbine can recover active power faster than grid code Result 2 Cont.

3. Issues that impose operational limits but can be mitigated  Issue- Voltage stability Due to change in load & supply (wind power supply) Due to reactive power injection ( a local phenomena)

Result 3 Cont.

Technical mitigation Transmission connected windfarm should comply gridcodes Placement of reactive power sources Must run conventional units and there location Result 3 Cont.

Transient Stability Issues: ‘Ability of grid to maintain synchronism when subjected to a severe transient disturbance’ 40KV Generator Subjected to fault for two different duration: -100ms (Clearing time) -150ms Result 3 Cont.

Issues: Cont… Issues dealing with Dynamic & transient stability analysis - loss of generation, loss of load - transmission system faults - Calculation of critical clearance times (CCTs) Results indicate: - high levels of wind lead to smaller CCT (i.e. less transiently stable) - Provision of reactive power during faults improves transient stability - recovery of active power post-fault impacts on transient stability Result 3 Cont.

Disturbances with critical clearance times as indicated in the legend as a function of “operational metric 1”. Result :The results suggest that the transient stability of the 2020 All Island Power System decreases significantly if the value of “operational metric 1” exceeds 70%...80%. Issues: Cont… Result 3 Cont.

Technical Measures : Technical Mitigation Measure was done by evaluating transient analysis of system for one dispatch. Mitigation measures on the number of faults that requiring a certain critical clearance time. Result 3 Cont.

Issues -Behaviour of the load is regular and well understood. -Generation follows this pattern balancing the load in all time domains. -But wind pattern is not correlated with the load and not as cyclic. Power balance fluctuations and frequency regulation Result 3 Cont.

Load changes and wind ramps during the week. On Monday the load increase in the morning coincides with a decrease of wind generation Issues: Cont… Result 3 Cont.

Results: -The statistical analysis derived distributions and confidence intervals for the change of 2020 wind generation and net load for various time frames. (2 years of data was used for analysing wind generation and net load variation for Upper and lower control requirement : Result 3 Cont.

Technical mitigation measures : In case of extreme positive ramps of generation, balancing of the system can be supported by curtailing wind farms. To a certain extent demand response may help to reduce power gradients Result 3 Cont.

Network Loading Analysis Network loading analysis -Investigated various wind patterns in five regions. Results show: ->110kV transmission system not overloaded -110kV transmission system may overload - 110kV “bottlenecks” occur in same areas -‘optimal use’ of power system (with lowest network loadings) were seen for 25% wind Issues: -Network congestions in rural area -Wind generation implemented at remote locations changes power flows Result 3 Cont.

W 0% W 25% W 50%W 100% Loading of transmission network for the base case (35% of wind farms connected to the transmission system) at winter maximum load and 0%, 25%, 50% and 100% instantaneous wind power. Network at voltage level 110kV Results : Cont…

The results suggest that even at high wind levels the network above 110kV is only lightly loaded. Networks at voltages levels >110kV Results : Cont…

Technical mitigation measures : -Reinforcement of the 110kV network -Development of dedicated 220kV transmission -Temporary curtailment of wind farms connected to the 110 kV network during high wind periods. Result 3 Cont.

4. Issues that imposed no problem to the model Issues: -Fault Levels -Small Signal Stability

Small-Signal Stability Issues: Ability of the All Island Power System to maintain synchronism when subjected to small disturbances Potential instability phenomena as a steady increase in generator rotor angle due to lack of synchronizing torque have not been considered. Lead to increase system losses and may lead to tripping of units. Dynamic system behaviour may change Result 4 Cont…

Results: - Qualitative conclusions only - Increase in wind improves the system damping  Model results do not suggest any problem with small signal stability with increasing wind power in the All Island Power System.  Because addition of wind doesn’t add to system impedance (As its power flow is controlled by power electronics hence, analysis of mitigation measures was obsolete. Result 4 Cont…

Fault Levels Fault levels quantify the maximum currents equipment may be exposed to in case of a short circuit. Effects on system: -Equipment Rating -Changes in network parameter. -Protection Schemes -Wind power may affect short circuit levels Issues : Result 4 Cont…

Results: Short-circuit calculations were carried out according to UK Engineering Recommendation G74 [National Grid(2008)] Assumed break times were about 50-80ms depending on voltage level. Result 4 Cont…

For three-phase or single-phase-to-earth faults, the planned maximum short circuit fault levels shall not be greater than the values indicated in Table Planned maximum short circuit fault levels [ESB National Grid (1998)] Observed minimum short circuit fault levels (Exception) Results: Cont… Result 4 Cont…

- For high wind penetration, short circuit levels can decrease down to 50%. - Short circuit levels are unlikely to drop below the minimum levels that are experienced without wind power (During Summers). - The short circuit level of some buses close to large wind farms but remote from conventional generation increases with wind generation. Observation from Modelled results : Results: Cont… Result 4 Cont…

Results from short circuit studies for three-phase faults at selected bus bars for the base case: Results: Cont… Result 4 Cont…

Results from short circuit studies for single-phase faults at selected busbars for the base case Result 4 Cont…

Technical mitigation measures: Measures Targeting problem of critically low short circuit levels: -Define “must run units”. They shall be kept running at there low active power limit. -Presence of Static Var compensator (SVC) and Flexible AC Transmission Device (FACTs). This study already envisaged their presence in network. -Upgrading line between low short level regions and high short circuit level regions. -Increasing short circuit capabilities of Wind turbine, can enhance system SC level but it is not feasible over other alternative, As it involve lot of money. Result 4 Cont…

5. Impact of the operational strategy In an unconstraint situation, the current scenario facilitates a renewable energy share of nearly 50% in the annual load. ˃ 40% target set by IRISH government in 2008 Proposed limiting operational metric 1 for instantaneous inertia less generation 60…80%. Above this value, wind generation units need curtailment.

Estimated total wind energy share in annual load coverage due to curtailment for different maximum allowable instantaneous wind penetrations

Estimated lost wind yield due to curtailment for different maximum allowable instantaneous wind penetrations

6.Recommendations for Future Work  System Planning and Operation: Improved system & equipment modelling by evolving Dynamic system operational metrics, possibly more sophisticated than “operational metric 1. Allowing more quantitative & refined results and reduced uncertainties.  Further Extension to Knowledge base: Cost effective methods to verify and monitor grid code compliance to completely deploy the operational range of the with particular focus on voltage & reactive power issues  Anticipating future Developments: Monitoring of actual system performance & feedback to modelling

7. Conclusion  Increasing wind power penetration results in: Dominating issues: -Frequency response to disturbances -Transient stability *Significantly worse system frequency response & stability. Less transiently stable system, reduced CCT’s Potential 110kV overloads Issues with voltage control & reactive power provision Mainly adequate system reserves & flexibility Improved small-signal stability/damping Reduced short-circuit levels “But main issues can be mitigated by optimised operational metrics-1values”

8. Summary 2020 policy targets aiming at 40% electricity from renewables is achievable (6,000MW peak wind generation) Two dominating issues  frequency stability after loss of generation  frequency as well as transient stability after severe network faults Maximum limit of wind generation and import is 60-80% for fundamental issues that need further analysis  Additional adaptation needed (ROCOF relay, reactive power sources) 50% if ROCOF relays at distribution connected wind farms and other generators were not disabled

9. Observations -Different wind turbine models are considered -Study helps the future policy formation for renewables -Grid codes are not followed in case of rocofs where allowed 0.5 hz whereas 0.6 Hz has considered -Other renewable sources are not considered -FACTS / SVC devices inclusion