Slow Control Activities in FZ Jülich H. Kleines, F. Suxdorf,, K. Zwoll Zentrallabor für Elektronik (ZEL), Forschungszentrum Jülich –What is ZEL? –Industrial.

Slides:



Advertisements
Similar presentations
Automation and Drives.
Advertisements

1 A&D CD PD /March 2001/ Profibus_en Internet: Intranet: Power Distribution.
H. Kleines 1, J. Sarkadi 1, K. Zwoll 1, F. Rathmann 2, H. Seyfarth 2, R.Engels 2, M. Mikirtytchiants 2, M. Nekipelov 2, A. Vassiliev 3, P. Kravtsov 3 1.
ALICE DCS Workshop Day 10th September The Cooling and Ventilation Control System D. Blanc, Process Control Team and Project Leader CERN ST/CV-Design.
“LHC Controls for Sector Test” Planning SPS Extraction Kicker and Septa LHC Injection Kicker and other equipment (beam stoppers, dumps,...) Etienne CARLIER.
Automation and Drives WinAC – the SIMATIC S7 in your PC News Q1/2004.
Automation and Drives Applications with IE/PB Link  Verticale integration using engineering tools like SIMATIC PDM or Drive ES  Remote diagnostic / remote.
SmartFactory: The Challenges of Open and Low Cost ICT in the Small Manufacturing Industry. Presented at CSIR Research and Innovation Conference 2006 Materials.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
Sensor/Actuator Manager Candidates CPAC/NeSSI Workshop May 5, 2005, Seattle,WA by Softing North America Ken Hoover.
LabVIEW Basic I with RADE introduction A. Raimondo (EN/ICE)
Date: File:MC-SMO-SYS_10.1 SIMOTION Siemens AG All rights reserved. SITRAIN Training for Automation and Drives Connecting HMI Systems.
PROFIBUS "Ready for anything!".
Notes: For the installation of a PB network, you can use shielded twisted pair copper cable, glass or plastic FO and infrared components. And you can mix.
Automation and Drives Peer to peer communication between control platforms PROFINET.
ELI: Electronic Timing System (ETS) at Facility Level E L I – B L – – P R E – B.
© PROFIBUS International 2001PROFInetnet... More than justEthernet... More than just Ethernet.
DCS LEB Workshop ‘98, Rome, Detector Control System, H.J.Burckhart,1 Detector Control System H.J Burckhart, CERN u Motivation and Scope u Detector and.
SIMATIC S7 Software Redundancy
14 Nov. 2000EPICS Workshop - Oak Ridge1 DESY SCADA Experience Matthias Clausen DESY/ MKS-2.
Agenda Adaptation of existing open-source control systems from compact accelerators to large scale facilities.
Automation and Drives PC- based Control All about SIMATIC WinAC.
Elder Matias Canadian Light Source University of Saskatchewan CLS – Control System Overview.
Marco Lonza, “The Control System of the ELETTRA Booster Injector” ICALEPCS2005, Geneva October 2005 The Control System of the ELETTRA Booster Injector.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
Using PVSS for the control of the LHCb TELL1 detector emulator (OPG) P. Petrova, M. Laverne, M. Muecke, G. Haefeli, J. Christiansen CERN European Organization.
F Antiproton Source Embedded Systems and Hardware Support Presented to Controls Working Group November 19, 2003 by Dave Peterson Pbar Engineering Group.
1. The Experiment CMS 2. Architecture, what is DCS in CMS? 3. Joint controls project 4. SCADA system (supervisory controls and data acquisition) 5. Framework.
Windows Control Center
SCADA. 3-Oct-15 Contents.. Introduction Hardware Architecture Software Architecture Functionality Conclusion References.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
9th September 2001R. BARILLERE - IT-CO1 Industrial and Custom Front-End solutions for Process Controls.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
SIMATIC Overview Automation and Drives SIMATIC Industrial Automation System.
CLS Machine Protection and PLC Hardware Presentation to Beamlines Group Elder Matias Canadian Light Source University of Saskatchewan October 20, 2001.
FAIR Accelerator Controls Strategy
Communication via MPI Contents Page Networking via MPI ………………
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
NICA control system, beam diagnostics V.Andreev, E.Gorbachev, A.Kirichenko, D. Monakhov, S. Romanov, G.Sedykh, T. Rukoyatkina, V.Volkov VBLHEP, JINR, Dubna.
NCSX CD-4/MIE block diagrams April 18, 2007 P. Sichta rev 0.
7th IMAC Meeting 7th MACHINE ADVISORY COMMITTEE MEETING OF TARLA CONTROL SYSTEMS Ayhan AYDIN ANKARA UNIVERSITY ON BEHALF OF TARLA TEAM.
ICALEPCS 2007 The Evolution of the Elettra Control System The evolution of the Elettra Control Sytem C. Scafuri, L. Pivetta.
Connecting LabVIEW to EPICS network
UNICOS Roadmap 2015 Enrique Blanco On behalf of the UNICOS team EN-ICE 1 March 2015 CERN March 27, 2015 GSI - CERN Collaboration.
Industrial Control Engineering ADE Rapid Application Development Environment based on LabVIEW 1.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
ISOLDE Vacuum Controls (CERN-GSI WS), S. Blanchard TE-VSC-ICM UNICOS implementation in ISOLDE Sebastien Blanchard TE/VSC Interlocks, Controls.
ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart1 Embedded Local Monitor Board ELMB  Context  Aim  Requirements  Add-ons  Our aims of PRR.
BE – RF CLEX TBM Cooling System Software Perspective (DAQ and analysis) A. Zelios, BE - RF1 A. Zelios A. Vamvakas.
Industrial Control Engineering ADE Rapid Application Development Environment.
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
OPC UA Server of the DummyCamera of the Zeuthen MST prototype Geneva, September 5 th, 2012 B. Khélifi, S. Chollet, Y. De Oliveira, F. Magniette (LLR) T.
Automation and Drives A&D AS SM6, Page 1 SIMATIC S7-300 Workshop to promote the S7-300 automation platform.
ORNL is managed by UT-Battelle for the US Department of Energy Status Report: Data Acquisition and Instrument Controls for the Spallation Neutron Source.
JLab Accelerator Controls Matt Bickley MaRIE discussion April 26, 2016.
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
22. Juni 2016 Mitglied der Helmholtz-Gemeinschaft Central Institute for Electronics (ZEL) ! Facts, Figures, Tasks & Topics.
Fermilab Control System Jim Patrick - AD/Controls MaRIE Meeting March 9, 2016.
Vacuum Controls framework for the LHC and its injectors Sebastien Blanchard CERN TE-VSC Integration of controllers in SCADA using OPC Server Goal: Improve.
Using DeviceNet Tuesday, August 25 10:15-11:15 and 11: :30 Cedar (8C) Rodney Cummings Engineering Group Manager Chris LeBlanc Industrial Comm Product.
Slovak University of Technology in Bratislava Institute of information engineering, automation, and mathematics Creation of demo application for SCADA.
Brief Introduction to ELBE
We enable Digitalization Thomas Hahn CERN Openlab, March 2016
Laboratorio per dottorandi 2017 Particle Accelerators Control System
PLC-based control systems at SOLEIL - ICALEPCS 2017
at Forschungszentrum Jülich
by Prasad Mane (05IT6012) School of Information Technology
PLCs integration into the ICS
Project Migration / Management
Presentation transcript:

Slow Control Activities in FZ Jülich H. Kleines, F. Suxdorf,, K. Zwoll Zentrallabor für Elektronik (ZEL), Forschungszentrum Jülich –What is ZEL? –Industrial Automation in Experiment Control –Example 1: Neutron Scattering –Example 2: Target Control –Future Activities / Cooperation with GSI

Who are we? Zentrallabor für Elektronik (ZEL): Central electronics facility of FZ Jülich ~80 Employees Work Areas: –Experiment Control Systems –Data Acquisition Systems –Detector Systems –New Field: Medical Systems ZEL is a systems house for FZ Jülich: –System design –Software development –Hardware development –Integration

Slow Control Extreme heterogenity –Experiment size –Application area –Technologies pre-selected by experimentator Technologies –Labview, SCADA, Scripting (python), Java, C++ (Qt) –TACO, OPC, Corba –Ethernet, PROFIBUS, CANopen, AS-Interface, GPIB “Professional” systems: Industrial Automation Equipment in Front End –PLCs –Fieldbusses –Decentral Periphery

PLCs in Experiment Control Systems PLCs are well established in infrastructure systems -low prices induced by mass market -robustness -long term availability and support from manufacturer Increasingly being used in experiment control systems -Powerful development tools -Strong communication capabilities: decentral peripherie (ET200S,..), dedicated CPUs for subtasks -Real time features IEC1131: Just a standardisation framework World market leader: Siemens => ZEL uses almost exclusively Siemens equipment

Simatic S7 PLC Family high end: S7-400 Ethernet, MPI, PROFIBUS mini: S7-200 mini: IM151/CPU OP + S7-300: C7SoftPLC: WinAC Decentral Pheriphery: ET200L, ET200S, PROFIBUS + AS-Interface AS-Interface mid range: S7-300 Homogenous powerful programming environment: Step7 (IL,LD,FBD,ST,...) High modularity, scalability, extendability Advanced communication capabilities => distributed systems

Example1: Neutron Scattering SANS Experiments at FRJII Juelich-Munich Standard: –Middleware: TACO (Linux) –Application: Scripting + GUI Front-End: totally PLC-controlled –Ca. 25 mechanical axes –Vaccuum system –Interlocks (beam shutter,….)

Control System Architecture of KWS1

Control System Architecture of KWS3

ZEL’s PROFIBUS HW + SW DP masters DP slaves PCI, cPCI, VME Linux SW –device driver –dialog system –configurator

Example 2: Atomic Beam Source Protons DISSOCIATOR COOLPAK MAGNETS RF Units MAGNETS H 2, D 2 internal gas target for ANKE (COSY) polarized atomic beam(H oder D) dissociation by plasma discharge polarisation by inhomogenous fields integrated diagnostics (polarimeter,..) ~ 700 I/O points Architecture PC-based process control system SCADA: WinCC PLC-based front-end: Communication: PROFIBUS DP

Control System Architecture

Future Activities PROFInet –Ethernet based access to industrial equipment –DCOM-based + real time stack –Complete engineering model EPICS: for experiments at the SNS, Oak Ridge Cooperation with GSI: –Key Know How in Industrial Automation + Integration –Restrictions: “Programmorientierte Förderung in der HGF” –~12 ZEL people in POF program “Hadronen-Physik” under responsibility of institute IKP –Discussion with IKP: Major contribution of ZEL to GSI project (DAQ and slow control)