1 Practical use of six-sigma for the IATA Fuel Program Tom Fodor Assistant Director E&M.

Slides:



Advertisements
Similar presentations
Options appraisal, the business case & procurement
Advertisements

A BPM Framework for KPI-Driven Performance Management
Lean Six Sigma - a new approach to airport consultation and management Tony Gollin and Thomas Hyde.
Program Management Office (PMO) Design
Global Congress Global Leadership Vision for Project Management.
AACO 5 th Technical Forum – Cairo November 2008 Connected Planning on the Ground Delivering Fuel Burn Reductions of 2% Gerard Berry Sales & Marketing.
Efficient Fuel Management in Aviation – Stockholm, September 18/19 th 2008 Connected Planning on the Ground Delivering Fuel Burn Reductions of 2% Kevin.
Agenda Overview of Rolling Forecast Cultural considerations Quarterly update process Quarterly update process timing Structure setup and configuration.
Project Change Management
Return On Investment Integrated Monitoring and Evaluation Framework.
By Saurabh Sardesai October 2014.
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
Overview of Lean Six Sigma
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
What is Business Analysis Planning & Monitoring?
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
1 SIX SIGMA "Delivering Tomorrow's Performance Today" AIR CDRE ABDUL WAHAB.
Transportation leadership you can trust. presented to NCHRP Project Panel presented by Cambridge Systematics, Inc. with PB Consult Inc. Texas Transportation.
Managing a Training Program Why train? Who will attend the training? What are the learning objectives? Strategies? Coverage? How will the training program.
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
McLean & Company1 Improving Business Satisfaction Moving from Measurement to Action.
Using Service and Product Providers to Leverage Your Energy Efforts Prenova/Owens Corning Energy Process Optimization Thomas Pagliuco – Prenova Fred Dannhauser.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
Team Chartering Six Sigma Foundations Continuous Improvement Training Six Sigma Foundations Continuous Improvement Training free six sigma site.
Copyright 2010, The World Bank Group. All Rights Reserved. Planning a Statistical Project Section A 1.
Lean Six Sigma in MIDAS 1. Lean Six Sigma (LSS) Defined Lean Six Sigma is a recognized industry best practice for business improvement which focuses on.
MAINSTREAMING MONITORING AND EVALUATION IN EDUCATION Can education be effectively managed without an M & E system in place?
Business Process’s Blue Print Pertemuan 3 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
1 Reduction to our parliamentary appropriations Our challenge doesn’t end there.
National Centers for Coastal Ocean Science Environmental Management System Implementation August 2005.
Containing Aviation Emissions in the Short-term
UNMIL ORM IMPLEMENTATION In compliance with United Nations Department of Peacekeeping Operations and Department of Field Support, DPKO and DFS Policy Directive.
© OECD/IEA INTERNATIONAL ENERGY AGENCY Worldwide Trends in Energy Use and Efficiency Key Insights from IEA Indicator Analysis ENERGY INDICATORS.
Pilot Projects on Strengthening Inventory Development and Risk Management-Decision Making for Mercury: A Contribution to the Global Mercury Partnership.
Finance Vic Rainsford Vice President Planning & Analysis Jim Palmer Sr. Mgr. Planning & Analysis.
The Value Driven Approach
Integrated Energy Efficiency Management
Federal Aviation Administration NextGen Environmental Management System (EMS)
INTEGRATED ASSESSMENT AND PLANNING FOR SUSTAINABLE DEVELOPMENT 1 Click to edit Master title style 1 Evaluation and Review of Experience from UNEP Projects.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
BIMCO Shipping KPI System and Standard. Here's Why KPIs Are Linked To Your Success 29th October 2015NAMEPA Annual Conference2 Mike Harden, CEO of Clarity.
R 0 G125 B 177 R 78 G 47 B 145 R 185 G 50 B 147 R 245 G132 B 107 R 255 G234 B 83 R 123 G193 B 67 R149 G169 B Goal Setting Overview.
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
PROPRIETARY  2003 Data Research Analysis & Consultancy Solutions All Rights Reserved. This is achieved by: Improving availability / reducing stock outs.
Managing the National Communications Process UNFCCC Workshop on Exchange of Experiences and Good Practices among NAI Countries in Preparing NCs September.
Info-Tech Research Group1 Manage the IT Portfolio World Class Operations - Impact Workshop.
Info-Tech Research Group1 Manage IT Budgets & Cost World Class Operations - Impact Workshop.
National Center for Coastal Ocean Science Environmental Management System Implementation August 2005.
Cynthia Cherry Welcome to MT 140 Unit 6 - Control.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
Info-Tech Research Group1 Info-Tech Research Group, Inc. Is a global leader in providing IT research and advice. Info-Tech’s products and services combine.
Proposal and Company Information Document CONTENT About Indagatio Research Our Research Offerings Why Indagatio Research Our Work Process Project Snapshot.
New Task on DSM and Climate Change Dr David Crossley Managing Director Energy Futures Australia Pty Ltd IEA DSM Executive Committee Meeting Brugge, Belgium.
TANGUY BERTOLUS Technical Director.
Flight Operations.
Program Management Office (PMO) Design
Program Management Office (PMO) Design
Seminar On Energy Audit Submitted To: Submitted By:
Lean Six Sigma DMAIC Improvement Story
Project life span.
Program Management Office (PMO)
Lean Six Sigma DMAIC Improvement Story
OPS/571 Operations Management
Lean Six Sigma DMAIC Improvement Story
Quality Management Six Sigma
Program Management Office (PMO)
Program Management Office (PMO)
Define Your IT Strategy
Overview Headlines RSP – Progress Overview General progress report
Driving Successful Projects
Presentation transcript:

1 Practical use of six-sigma for the IATA Fuel Program Tom Fodor Assistant Director E&M

April 2010 Ops Conference 2  230 airlines  Representing 93% of scheduled international air transport IATA is an association of:

April 2010 Ops Conference 3 IATA’s Mission:  To represent, lead and serve the airline industry  Represent airlines’ interests to governments & international organizations  Assist the airlines in developing solutions to the issues affecting efficient operations

4 Fuel Price Evolution Forecast average fuel price for 2012 $129.2 / barrel Platts, September 28, 2012 $138.7 / b Nov. 5, 2012 LFI Conference 2012

5  IATA’s Four-Pillar Strategy  Invest in new technology  Operate more efficiently  Build & use efficient infrastructure  Use effective economic measures Aviation & Climate Change Aviation is facing the challenge Nov. 5, 2012 LFI Conference 2012

6 IATA Green Team Achievements Americas: 17 Europe: 40 Africa/MENA: 27 ASIA/ASPAC: 27  111 visits  41.3 M tons of CO 2  US $9.8 B Nov. 5, 2012 LFI Conference 2012

7 IATA Green Team Identified Savings Potential  Average identified saving is 5% of the airline fuel budget  Savings range from 2% to more than 14% (higher values for airlines that did not have a structured fuel efficiency program in place)  Based on the actual fuel efficiency assessments, the major savings come from Flight Dispatch and Flight Operations Nov. 5, 2012 LFI Conference 2012

IATA Methodology for Fuel Program Define Measure Analyze Improve Control Lean Six Sigma Methodology  Combines the Lean and Six Sigma methodologies  Lean: reduce waste and add value  Six Sigma: reduce variation in product output, data driven, uses statistical tools IATA uses the DMAIC process for the fuel program DMAIC Process 8Nov. 5, 2012 LFI Conference 2012

9 Define Baseline Phase 1 Phase 3Phase 2Phase 4 Implementation Execution Implementation Plan IATA Fuel Efficiency Program – Phase 1 Nov. 5, 2012 LFI Conference 2012 Fuel Program Setup Define Baseline  Engage Executive Management Support  Define Corporate Fuel Process  Define Organization  Establish Fuel Team  Select Program Methodology

10 Executive Sponsor, Fuel Manager, Fuel Team The Fuel Implementation Organization Nov. 5, 2012 LFI Conference 2012

11 The Fuel Efficiency Implementation Team Nov. 5, 2012 LFI Conference 2012

12 Responsibilities and Accountabilities Nov. 5, 2012 LFI Conference 2012

13 Phase 1 Phase 3Phase 2Phase 4 Implementation Execution Implementation Plan IATA Fuel Efficiency Program – Phase 2 Fuel Program Setup Define Baseline Nov. 5, 2012 LFI Conference 2012  Perform Gap Analysis  Review all five operational areas – Flight Operations, Flight Dispatch, M&E, Ground Operations, Cabin  Identify initiatives  Establish preliminary savings targets

14 IATA Fuel Efficiency Gap Analysis Nov. 5, 2012 LFI Conference 2012 Areas covered:  Flight Dispatch – 8 areas reviewed  Flight Operations – 14 areas reviewed  Engineering and Maintenance – 8 areas reviewed  Ground Operations – 3 areas reviewed  Cabin – 4 areas reviewed Objectives:  Reduce weight  Reduce drag  Reduce engine specific fuel consumption

15 Basic Data – Fuel Budget Nov. 5, 2012 LFI Conference 2012 Calculated for the previous 12 month period

16 B Fuel Penalty for Extra Weight B744 weight factors 4Hours 3.9% 7Hours 4.1% 8Hours 4.1% 12Hours 4.7% Nov. 5, 2012 LFI Conference 2012

17 Basic Data – Fuel Penalty 17 Nov. 5, 2012 LFI Conference 2012 Fuel burn (penalty) in kilograms to carry 1 kg additional weight on the entire fleet for 1 year

18 Initial Assessment of Potential Savings Nov. 5, 2012 LFI Conference 2012 Example: Potable water quantity reduction Fuel savings calculated based on water consumption of 0.3 l / pax / hr using average flight length

19 IATA Fuel Efficiency Program – Phase 3 Phase 1 Phase 3Phase 2Phase 4 Implementation Execution Fuel Program Setup Define Baseline Implementation Plan Nov. 5, 2012 LFI Conference 2012  Perform Benefit / Effort Analysis  Prioritize Initiatives  Risk Analysis / Mitigation  Managing the Change  Build a Business Case  Define KPIs and OPMs  Identify Data Requirements / Source  Develop Implementation Plan

20 Implementation Management “Formalize” in the Planning Process:  Documented and detailed implementation plans  Detailed timelines with well-defined milestones  Accurate measurements and tracking results to plan  Quantification of periodic and cumulative benefit to the airline Nov. 5, 2012 LFI Conference 2012

21 Rating the Project Effort Benefit Nov. 5, 2012 LFI Conference 2012

22 Setting Priorities Start Here Nov. 5, 2012 LFI Conference 2012

23 Mitigate / Eliminate the Risk of Safety and Uncertainty Safety Risk Management Nov. 5, 2012 LFI Conference 2012

24 LFI Conference 2012 Nov. 5, 2012 Project Work Plan  Project timeline and the milestones depend on:  Required resources, carry out survey  Development of new servicing procedures based on the survey results

Communication / Change Management  Internal communication to include:  Ground Operations management and personnel  Flight Attendants and Pilots  Supply Chain / Contract Management  Internal stakeholders  External communication:  Ground Service Providers 25 LFI Conference 2012 Nov. 5, 2012

26 Selecting KPIs KPIs Should be SMART  Specific – Clearly defined performance requirement  Measurable – Defined in a quantifiable way  Achievable – Realistic, manageable  Relevant – Directly related to the desired goal  Time-constrained – Set to a defined time span Nov. 5, 2012 LFI Conference 2012

27 KPIs are supported by trend graphs & performance measures to show progress against the specific targets in each initiative of the program Example of an Executive Level Dashboard Using Business Information (KPIs) Nov. 5, 2012 LFI Conference 2012

28 LFI Conference 2012 Nov. 5, 2012 Key Performance Indicator (KPI) & Operational Performance Measures (OPMs)  The company’s KPI and supporting OPMs for the project are:  Part of the overall weight reduction initiative (KPI)  Reduction of water servicing quantity in consideration of passenger load and flight length plus other considerations (OPM)  % of flights serviced to policy level (OPM)  Resultant fuel savings when comparing actual water weights carried to pre-initiative baseline levels (OPM)

29 LFI Conference 2012 Nov. 5, 2012 Data Requirements  Data elements for tracking actual results  Aircraft water tank capacity  Projected flight time and associated policy water volume  Actual water volume after servicing  Volume of water remaining on arrival  Number of passengers and crew  Flight time (block to block)  Planned consumption rate  Actual consumption rate  Identify source of data  Ensure data quality

30 Implementation Plan Project / Objective Benefit / Effort, Priority Target Savings Issues / Tasks Duration / ROI Nov. 5, 2012 LFI Conference 2012

31 IATA Fuel Efficiency Program – Phase 4 Phase 1 Phase 3Phase 2Phase 4 Fuel Program Setup Define Baseline  Tracking Results  Analyze Results  Adjust Policies and Procedures  Sustain & Control Implementation Plan Implementation Execution Nov. 5, 2012 LFI Conference 2012

32 LFI Conference 2012 Nov. 5, 2012 Build Statistics  Track actual savings against plan and identify under-performing areas  Savings can be calculated from weight reduction and fuel penalty value

33 LFI Conference 2012 Nov. 5, 2012 Monitor Performance

34 LFI Conference 2012 Nov. 5, 2012 Monitor Performance  Look for significant variance from plan  Implement corrective action accordingly

 Continuous progress check  Identify any implementation issues  Improve procedures as necessary  Institutionalize changes for sustained results  Modify organization structure if required Adjust Policies and Procedures LFI Conference 2012 Nov. 5,

Institutionalize the Improvements LFI Conference 2012 Nov. 5, To sustain and control results:

37 Fuel Book 5th Edition & Implementation Guidance Material Fuel Book 5 th edition highlights:  Time dependent maintenance costs  Aircraft performance monitoring (APM)  Released: October 2011 Implementation Guidance Material:  Setting priorities  Risk assessment  Building a strong business case  Program management  Metrics for tracking implementation  Key Performance Indicators  Released: June th edition Fuel Efficiency Program Implementation Guidance Material Nov. 5, 2012 LFI Conference 2012

38 IATA Fuel Efficiency Regional Workshop - Amman Oct 6-7, IATA Fuel Efficiency Regional Workshop - Geneva June 9-10, Jan 2009 Singapore Airlines Thank you!