The ATN Avionics Vendors View. ATN2001 Sept 2001; p.2 PETAL-II Avionics.

Slides:



Advertisements
Similar presentations
ATN-2000 AOC Migration Strategy Presented by Frank OConnor.
Advertisements

GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
GLOBALink/HF Data Link
ACARS & VDL Mode AVICOM Japan
ICAO Seminar on the Implementation of Datalink and SATCOM Communications Bangkok, November 2003 VHF ACARS to ATN Akhil Sharma.
GLOBALink/VHF Digital Link Mode 2
1 Study into IPS Suitability for Air-Ground ATM Communication Carsten Underbjerg, Ericsson Member of Helios Study Consortium European Organisation for.
NEXCOM Next Generation Air/Ground Communications Briefing Presented to AMCP Working Group M Montreal, Canada December 16, 2002 James T. Eck Air/Ground.
© 2010 The MITRE Corporation. All rights reserved. AERONAUTICAL COMMUNICATIONS PANEL (ACP) SEVENTEENTH MEETING OF THE WORKING GROUP M Bangkok, Thailand.
A GLOBALink ARINC VDL Mode 2 AOA and ATN Program Status & Deployment Activities November, 2000 AMCPWGM1 WP23.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N FAA/NASA Weather Information Communications Flight.
1 C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE PHARE Aeronautical Telecommunication Network: PATN By Gérard Mittaux-Biron PATN Project Leader CENA.
ATN99 International ConferencePage September 1999 London ATN99 INTERNATIONAL CONFERENCE September 1999 London Paul Hennig, United Airlines.
ATN2002 IEE, London Providing Communications Services to Support ATC Applications Akhil Sharma Senior Manager AIRCOM Service Development.
ACI/GM/3011/1.0 ACI's Portable ATN Software Products & Services Technology for next-generation aviation data communication… Presented by Forrest Colliver.
The Future of PETAL Technology
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
VHF Digital Link Mode 2 Deployment Strategy Vic Nagowski
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Air-Ground Data Link - DFS Strategy
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
18-19 September 2001ATN2001 (London)1 A Commitment to ATN Implementing Aeronautical Data Link Today Presented by Kevin Wohlers ACI Program Manager.
ATN 2001, London - 18 Sep 01 1 PETAL II and II Extension Maastricht Multi-stack Implementation Lessons Learnt Prepared by Gustaaf Janssens/Konrad Koebe.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
ATN Air-Ground Subnetworks
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
FAA/JCAB ATN & AMHS Trial Varadero, Cuba May 2002 Presentation ATN 3.2 by H. Tran.
CPDLC Expected Stakeholders 6 CPDLC Integration Team (CIT) Government/Industry/Union Team Providing Coordinated Management and Oversight of.
ATN/VDL Mode 2 Implementation Status
Making nets work CNS 1 Aviation Wireless Communications Chris Wargo Presented to IAB Workshop on Wireless Internetworking February 29 - March 2, 2000 Computer.
ATN 2001, London - 18 Sep 01 1 PETAL II Extension Architecture, Integration and Testing Prepared by Martin Adnams/Isabelle Herail.
How the PETAL Trial Relates to the FAA’s CPLDC Program ATN 2001 Focus on the Reality of Data Link IEE London, England 18 September 2001 Gregg Anderson.
ATN Subnetwork Implementation:
ARINC PETAL IIe VDL Mode 2, ATN …and beyond
Next Generation Air/Ground Communications (NEXCOM) Presented to ATN 2002 London, England 25 September 2002 James H. Williams Communications Integrated.
IPv6 integration with the ATN Tony Whyman Helios Information Services Ltd.
Data Link Communications
FANS-1/A and ATN Data Link: An Avionics Perspective Bob Kerr
ATN September 2001 American Airlines Data Link... Frank Cheshire / Andy Fry.
Rob Mead PETAL-II Trials & Project Manager Eurocontrol, DIS/ATD
DCIT / Media Management Session FAA DataComm – OTA FANS Validation Airbus FANS comm media management 17 Nov 2011Airbus FANS comm media management Presented.
Presented by Philip Clinch on 27 September 2000 at ATN 2000 Aeronautical Telecommunications Services.
Page 1 FAA Future Air/Ground Communications System Architecture James Williams Integrated Product Team Lead Communications Systems ATN September.
GROUND-GROUND STRINGAIR-GROUND STRING AVIONICS CSP AOC DTAP NESG HADDS.
Federal Aviation Administration Data Communications Program FAA Prototype & Validation Activities Presented to:Data Comm Implementation Team By:Craig Morris.
ACARS Media Management Prepared for DCIT #23 Systems Integration Working Group.
ATN2003 IEE, London CNS Infrastructure Partnerships Akhil Sharma Senior Manager AIRCOM Service Development.
10 Dec 15 COMMUNICATIONS PANEL (CP) WORKING GROUP I (WG-I) Montreal, QC Canada January 2016 AEEC IPS Update (Prepared by Luc Emberger, Greg Saccone)
23 September Level C CMU using Reusable ATN Software Example considerations from re-use of the ATNSI RRI.
LINK EEC Test Facility - ATN 2003 London 1 LINK Test Facility Overview Located at EEC Bretigny - France In support to LINK EATMP project.
Air Traffic Control Communication
WORKING GROUP I (WG-I) AEEC IPS Update
Presented By: Peter Muraca FAA Technical Center Atlantic City, NJ USA
FAA Ground to Ground ATN Implementation Plan
VDL 2 capacity simulations
Presented by Thales Avionics ATN 2003 London, UK September 2003
AERONAUTICAL COMMUNICATIONS PANEL (ACP)   SEVENTEENTH MEETING OF THE WORKING GROUP M   Bangkok, Thailand 31 January – 1 February 2011 INFORMATION PAPER.
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
The Air Ground Datalink Server (AGDS)
ATN/VDL Mode 2 Implementation Status
FANS (Future Air Navigation System) Flight Crew Procedures
ATN Air-Ground Subnetworks
Presented at ICAO ACP WG-I By Robin Hughes
9/17/2018 Boeing ATN/IPS (Aeronautical Telecommunications Network/Internet Protocol Suite) Activities Title Option 1: Environment, Health & Safety Standard.
AIRCRAFT(ARINC) COMMUNICATION, ADDRESSING AND REPORTING SYSTEM
NEXCOM Next Generation Air/Ground Communications Briefing Presented to
ATN Subnetwork Implementation:
VDL 2 capacity simulations
Presentation transcript:

The ATN Avionics Vendors View

ATN2001 Sept 2001; p.2 PETAL-II Avionics

APM-900 ICAO Address Aircraft Type Tail Number Airline ID MCDU Advisory Display Message Display Downlink Composition VHF-920 VDL Mode A VDL Mode 2 CMU-900 ACARS VDL Mode 2 ATN Router CPDLC, CM EICAS ATC Advisory Chime PETAL-II VDL Mode 2 / ATN Avionics Architecture

ATN2001 Sept 2001; p.4 System Features v8208 Mobile SNDCF CLNP COTP FastByte COSP FastByte COPP Dialog Service IDRP Application Service Element (ASE) Controller Pilot Data Link Communications (CPDLC) Context Management (CM) SN-Map ARINC 750 Interface AOC Application AOC/AVLC Convergence Function VME/LME AVLC Airtel ULS Airtel AAR Satcom AOC VDL Mode 2 Satcom VHF AOC VDL Mode A HF AOC HFDR AOA CMU-900

ATN2001 Sept 2001; p.5 System Deployment n VDL Mode 2 testing performed in parallel with ATN development and test — Extensive lab testing of CMU/VDR/GTS — Rockwell Collins Sabreliner and Cessna aircraft — Flight testing against ground stations

ATN2001 Sept 2001; p.6 System Deployment n X.25 Over TCP/IP (XOT) — Allowed End - End and ATN testing without VDL — ATN performed very well n Airborne ATN Router (AAR) and Upper Layer System (ULS) — Airtel updates to support VDL and CMU environment — Airtel host testing — Integration of ATN and CMU software in simulator

ATN2001 Sept 2001; p.7 System Deployment n ATN port to CMU — Full end-to-end lab testing

ATN2001 Sept 2001; p.8 System Deployment n On-aircraft testing — Eurocontrol BAC1-11 — American Airlines 767 n PETAL Certification n Additional Interoperability testing has been performed with FAA and STNA/DGAC

ATN2001 Sept 2001; p.9 Lessons n ATN testing, integration, and operation better than planned n Test, Test, Test — Extensive lab testing from box level to end-to-end — On-aircraft ground and flight testing n Data capture n Team Coordination

ATN2001 Sept 2001; p.10 Next Steps n FAA Build 1 updates (2002) — Enhanced HMI alerting for ATN and CPDLC connections — Timer changes — PER Encoding (ATN PDR) n FAA Build 1A updates (2003) — Forward field of view ATC display — Essential level CMU