Pacific school of engineering

Slides:



Advertisements
Similar presentations
SURVEYING It is the technique, profession, and science of accurately determining the terrestrial or three-dimensional position of points and the distances.
Advertisements

Basic Setting Out.
MRS SITI KAMARIAH MD SA’AT ERT252 GEOMATIC ENGINEERING.
Surveying Chain Surveying
Errors and Horizontal distance measurement
Distance measurement Physical unit = metre (m) = the length of the path travelled by light in vacuum during a specific fraction of a second (1/
Distance Measuring.
Micrometer Sizes range from 0 to 1 inch up to 12 inches.
Distance observations
Faculty of Applied Engineering and Urban Planning Civil Engineering Department First Semester 2010/2011 Surveying Chain Surveying Part I Lecture 4 - Week.
Hand Tools January 27, 2009.
Chemical Department. Guided by- prof D.M Prajapati. Prof. J. M. Jadav
ENGINEERING SURVEYS DEFINITION Surveying has to do with the determination of location of points on or near the surface of the earth. It is the art/science.
Set out masonry structures
Unit 2: Chain Surveying 25 November 08 Unit 2 :Chain Surveying.
Chapter #1: Basics of Surveying
CHAPTER 2 CHAIN SURVEYING Tape Measurements
Chain Surveying:Chain surveying is a simpllest type of survey in whice is divided into a number of well condition tringles and only linner measurments.
Introduction to surveying
Surveying Equipment.
Surveying Chain Surveying
1.Meet B Parmar ( ) 2.Swapnil A Parmar ( ) 3.Pratik C Patel ( ) B.E- 2 SEM MECHANICAL ENGINEERING LINEAR MEASUREMENTS.
Measuring Distance ©2010 Dr. B. C. Paul Note – The techniques shown in these slides are considered common knowledge to surveyors. Figures in the slides.
S.H.H.S Building Construction
Distance Measuring. Two principles of measuring distance 1) It takes two points to form a line. 2) The shortest distance between two points is a straight.
LINEAR MEASUREMENT.
Unit 1: Measurements Measurement of Length.
STUDENTS NAMEID.NO.ENROLLMENT NO. MOD. JISHAN KHAN13PES NEEL SUTHAR13PES MILAN LAKHANI13PES GUJARAT TECHNOLOGICAL.
Surveying Chain Surveying
Gandhinagar Institute of Technology
ELEMENTS OF CIVIL ENGINEERING (Subject Code )
Geology and Surveying (Part B - Surveying) Distance Measurement.
SUBJECT - SURVEYING – I SUB.CODE - CE6304
TESTING A CHAIN: When a tension of 8kg is applied at the ends of a chain and compared against a certified steel band standardized at 20°C, every meter.
CHAPTER 3 LINEAR MEASUREMENTS
Measuring Instruments
Cold metal and Layout.
PLANE TABLE SURVEYING SURVEYING – I
INSTRUMENTS USED IN PLANE TABLE SURVEYING.
Civil Department. GROUP MEMBERS GROUP MEMBERS:- ENROLLMENT NO. NAME OF THE STUDENT BURHAN ADENWALA PRIYANK AGRAWAL TAMANNA.
Chapter #1: Basics of Surveying
Compass Surveying.
GOVERNMENT ENGG. COLLEGE B.E Semester III :- Civil Engineering
In Compass survey chain or tape is used for linear measurements and compass is used for fixing direction. In compass freely suspended.
Handled by, R.PRADEEPA, M.E Assistant Professor, Department of Civil Engg, PITS.
CIVIL DEPRTMENT  Introduction :  The process of laying out engineering projects by placing pegs Or marks at the site of works is known as setting out.
Surveying Equipment. Builder’s Level A telescope instrument used to check level of forms or field grades. Builders' levels are designed to be used for.
Linear Measurements Lecture Notes.
Mechanics of Solids (M2H321546)
Introduction To Surveying Mr. Vedprakash Maralapalle, Asst. Professor
Mr. Vedprakash Maralapalle, Asst. Professor
Chain survey
Miscellaneous Measurements
Chain surveying Notes.
Engineering surveying : Compass surveying
Plane table surveying with contouring
COMPASS SURVEYING.
Sometimes it will be observed that many obstructions like rivers, canals, ponds. thick jungles, ditches, buildings, etc. lie on the chain line. These.
Chapter 03- Angular Measurements PRESENTED BY Ms. M.R. Zade
BASIC DISTANCE MEASUREMENT
Surveying Equipment.
Govt. Polytechnic,Manesar
Chain survey By :- Parveen Kumar.
LINEAR MEASUREMENT-PART 1
Distance Measurement.
Micrometer Sizes range from 0 to 1 inch up to 12 inches.
Distance Measurement.
Linear Measurement NG1H703 & BE1S204 David Harper.
Engineering Surveying Linear Survey
Presentation transcript:

Pacific school of engineering (civil department) Linear measurement Guided By:- Hiten Kheni Jasmin Gadhiya Group name:- J

Topic to be covered Chaining Instrument used in chaining Ranging Offsets Error in chaining

Chaining In the method of chaining to denote horizontal distance, either a chain or a tape is used for making direct measurements. A chain is less precise then a tape and therefore works with precision a tape is used.

Instrument used in chaining Chain and tape Pegs Arrows Ranging rod Plumb bob

Chain The chain is made of straight links of galvanized mild steel wire of 4mm in diameter. The links are bent into rings at the ends because of which they offer flexibility. The end of the chain are provided with brass handle at both ends. The length of the chain includes both the handles. Brass tallies is are provided at every 5 meter of the chain.

tapes tapes Cloth or linen tape Invar tape Metallic tape Steel tape

Types of taps Cloth or linen tape The linen tape can be used for taking subsidiary measurement of offsets. This tapes available in 10m,20m and 30m length. This tapes are made varnish strip of woven linen 12mm to 15mm wide. This tapes are calibrated in ‘m’ and ‘cm’.

Metallic tape This tape is made varnished strip of fine brass, copper or bronze wires. It is better than linen tape. This tapes are available in 5m,10m,15m and 50m length. This tapes are calibrated in ‘m’ and ‘cm’.

steel tape Steel tape is superior to a cloth or metallic tape and consist of a light strip of width 6mm to 10mm. Steel tape are available in 2,5,10,30 and 50m length.

Invar tape Invar tape are used for linear measurement of a very high degree and of precision. The invar tape is made of alloy of nickel and steel.

pegs Pegs are made of timber or steel and they are used to mark the position of the station or terminal points of survey line. Pegs are 15cm long and are driven in ground with the help of hammers.

Arrows Arrows are made of good quality hardened and tempered steel wire of 4mm in diameter. The length of arrow is 40cm. One and of the arrow is made sharp and the other end is bent in to a loop of facilitate carrying of arrows.

Ranging rod The ranging rod are generally 2 to 3m in length. These rods are paints with white and black or red and white colour in 20cm. plumb bob A plumb bob is used to transfer the points to the ground.

ranging Direct ranging Indirect ranging By line ranger By eye

Indirect ranging This method ranging is adopted when the two ends of survey line are not visible from either of the station due to a hill or high ground between them. Point a1 is not visible point a2 and a2 is not visible point a1. the proceed in straight line between a1 and a2,the process of indirect ranging is done. m1 m2 a2 a1

Offset Perpendicular offset Swing offset Long offset Short offset Oblique offset

Perpendicular offset When distance are measured at right angle(90) then such distance are called as perpendicular offsets or only offset. p q a 90 b a q p b

Oblique offset Short offset When distance are measured other than 90, then such distances are called as oblique offset. Short offset When offset are set out by swinging the tape on chain line,it should not be longer then 15m,such offset are known as short offset. Offset should be as short as possible, however limiting length of offset depends upon accuracy desired, nature of ground, scale of plotting.

Long offset Swing offset Offset which are more than 15m are set by optical square or cross staff, such offsets are known as long offsets. Swing offset Offset taken by swinging tape or chain is called swing offset.

Thank you