Adding to the Fleet Ensuring SRP’s Long Term Generation Reliability May Millies, Manager - Power Generation Services.

Slides:



Advertisements
Similar presentations
Leaders in the design, implementation and operation of markets for electricity, gas and water. Portfolio Generation Investment Under Uncertainty Michael.
Advertisements

Traci L. Bender Nebraska Public Power District APPA Business & Financial Conference September 15, 2009 Risk Analysis.
1 Transformation Presentation to the Public Sector Management Workshop June 1,
Duke Energy Carolinas Dan River Combined Cycle Project 8/17/10 For Vogt Power, my best estimate is 214 shipments (rail, truck, LTL, and small parcel- UPS.
Demand Response in Connecticut Presented by: Bob Laurita ISO New England December 2, 2004.
Dynamic Distribution Grids © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. Neal Bartek.
 2005 Pinnacle West Capital Corporation Palo Verde Hub Participant Meeting May 27, 2005 Arizona Public Service Company Tom Glock – Manager Power Operations.
Special Open Meeting of the Arizona Corporation Commission Energy Workshop February 16, 2001 Arizona Public Service Company Cary B. Deise Director, Transmission.
PJM© PJM as Part of the Eastern Interconnection KEY STATISTICS PJM member companies 750+ millions of people served 60 peak load in megawatts.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
COMBINED HEAT & POWER J.R. Simplot Mountain Home, Idaho.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
SOLAR IMPACT ON FYI Kevin Meikle, Architect Airports Planning Manager 4995 E. Clinton Way Fresno, Ca (559)
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
Arizona Corporation Commission 2010 Biennial Transmission Assessment Workshop June 3 & 4, 2010 Brian K. Keel Manager, Transmission System Planning Salt.
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
Engineering Technology Division
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
1 Enhancing the Role of Renewable Energy in California Robert A. Laurie Commissioner California Energy Commission Geothermal Resources Council Annual Meeting.
EnergyForward Fleet Transition 2014 AAPT Summer Meeting July 28, 2014 Minnesota Power David J. McMillan, Executive Vice President.
Renewable Energy: Legal and Policy Issues Frank Prager Vice President, Environmental Policy Xcel Energy November 20, 2009 Frank Prager Vice President,
Regulatory Flexibility Committee Competitive Procurement September 18 th Joe Kerecman Director Government and Regulatory Affairs
Powering Wolverine’s Renewable Future Presented to Great Lakes Regional Wind Institute Detroit, Michigan by John P. Miceli, Energy Market Analyst March.
Distributed Generation Programs, Incentives and Interconnections Ian Loughran, P.Eng. DSM Program Leader Renewable Energy Programs
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
Results of Geothermal Power Survey of Electric G&T Cooperatives Robert Putnam, CH2M HILL Bob Gibson, NRECA Steve Lindenberg, Lindenberg Consulting.
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Sithe Global Power, LLC Toquop Energy Project. A 750 MW Coal fired electric generating plant Located 12 miles northwest of Mesquite, NV in Lincoln County.
1 Are We Ready For The Future? 2005 NIPPC Annual Meeting September 8, 2005 Michael R. Niggli President, Sempra Generation.
Capital Financing for Energy – Related Projects George Williams, SVP and Chief Operating Officer El Paso Electric Company May 20, 2010.
September 5,  Mission - To provide Excellent Service to Our Distribution Members by creating opportunities, cultivating cooperation, and navigating.
NSP System. NSP Supply Plans: Generation and Transmission Betsy Engelking Betsy Engelking Director, Resource Planning Director, Resource Planning Xcel.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
Wholesale Electricity Market – Western Australia APEx Conference 2008 – Sydney Allan Dawson 13 October 2008.
OVERVIEW OF ISSUES DR AND AMI HELP SOLVE Dr. Eric Woychik Executive Consultant, Strategy Integration, LLC APSC Workshop on DR and AMI.
California Energy Commission Staff Paper - April 12,20071 Estimating the Generation Resource Mix of Electricity Imports to California – Energy Commission.
Business Development ……Where To From Here? FPL Group Bank Meeting September 21, 2004.
September 24, 2007Paying for Load Growth and New Large Loads APPA September 2007.ppt 1 Paying for Load Growth and New Large Loads David Daer Principal.
Arizona Corporation Commission Energy Workshop February 16, 2001.
03/22/07 ACC Open MeetingSummer Preparedness SRP Summer Preparedness 2007 Mike Hummel Manager – Supply & Trading and Gary Harper Manager - System.
Arizona Corporation Commission Power Plant & Transmission Siting Summary ACC Staff Presentation October 30,
Discussion Forum 2004 APPA National Conference June 19 – 23, 2004 Seattle, Washington Issues for Green Power Programs Designing Marketing and Pricing.
WCOAEE Meeting: Natural Gas & Electric Update April 16, 2015.
Tennessee Valley Authority John J. McCormick Sr. Vice President, River Operations and Renewables.
PJM©2015 ATTACHMENT TO TESTIMONY OF ANDREW OTT OHIO ENERGY MANDATES STUDY COMMITTEE MARCH 18,
ACC Summer Preparedness Hearing Tucson Electric Power & UNS Electric March 22, 2007 Ed Beck Superintendent Transmission & Distribution Planning.
Reliability Must-Run Analysis 2006 – th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006.
1 Public Power Looking to Participate in New Coal Generation Public power communities are very concerned about affordable electricity and –Coal is the.
Geothermal Energy Portfolio from a Utility Perspective Marilynn Semro Seattle City Light May 11, 2005 How do you know what you need and is Geothermal “it”?
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
12/15/ SS-1 Arizona Corporation Commission Special Open Meeting Gary Harper Manager, System Operations July 23, 2004 Phoenix, Arizona.
OFFSHORE WIND CONNECTION & COSTS Mary Doswell Alternative Energy Solutions December 7 th, 2010.
2015 Mace Advocacy alliance policy conference
Long Term Study Scenarios and Generation Expansion Update October 12, 2012.
How the Transmission System Works Really William F. Reinke.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
0 Greg Wagoner Manager, Power Supply Wabash Valley Power Association June 6, 2006 Methane Recovery Workshop.
Current status & future plans for power system development U Moe Thet, Deputy Chief Engineer Power System Department Myanma Electric Power Enterprise.
Clean Power Plan EW Tim Wilson Director of Energy Supply Services.
Argentine Power Market Fuel Oil Use & Opportunities for the Future Central Puerto S.A. Fuel Oil / Energy Buyer’s Conference Miami, September 2000.
Lincoln Energy Center Overview
APTA Sustainability Workshop 2016
Presentation to the Enron Corp. Finance Committee
APTA Sustainability Workshop 2016
Mass Government Finance Officers Assoc
Division of Energy Resources
How the Missouri River is Operated - WAPA’s Role - Mid-West Electric Consumer Association Annual Meeting December 11, 2018 | Denver, CO Lori L. Frisk VP,
Presentation transcript:

Adding to the Fleet Ensuring SRP’s Long Term Generation Reliability May Millies, Manager - Power Generation Services

WAIT A MINUTE! If it’s a Project, When Will It End? April 10, 2013WUC - SD2

Salt River Project Federal Subdivision of the State Employees 956,756 Electric Customers Electric Service Area = 2,900 sq. miles Water Service Area = 375 sq. miles April 10, 2013WUC - SD3

Salt River Project Peak Power System (MW) – 7,072 Resources Available to Service – 8,284 April 10, 2013WUC - SD4

BACK TO THE REGULARLY SCHEDULED PROGRAM April 10, 20135WUC - SD

What Am I Going to Tell You? Background SRPs Generation Profile What We Bought How We Transitioned the Plant April 10, 20136WUC - SD

BACKGROUND What were we thinking? April 10, 20137WUC - SD

Background Economy and slow load growth have lead to excess merchant gas capacity in southwest Opportunity to purchase asset at depressed price SRP coal resources face challenges/uncertainty SRP has long-term need for new gas resources WUC - SD8April 10, 2013

Background - Request for Proposals Position SRP strategically to take advantage of currently depressed market values for generation assets to: –Hedge against the increased pressure and environmental mandates of Coal generating resources –Provide an economic alternative to future new generation construction Help establish how much is reasonable for SRP to spend on existing coal generation resource’s life extension WUC - SD9April 10, 2013

Background - Request for Proposal Gas Plant RFP Issued September proposals received from seven modern combined cycle gas plants Best purchase and tolling agreement proposals 10April 10, 2013WUC - SD

SRP’S GENERATION PROFILE Our Generation is Bigger Than Yours! April 10, 2013WUC - SD11

Coal Generation - Baseload Coronado Generating Station – 785 MWs Units 1 & 2 – Connects directly to SRPs 500kV Transmission System Navajo Generating Station – 21.7% Ownership – Plant Operator – 2,250 MW Total Plant Output Springerville – 417 MWs, Unit 4 April 10, WUC - SD

Gas Generation Agua Fria – 626 MWs Desert Basin – 581 MWs Kyrene – 410 MWs Santan – 1,219 MWs April 10, 2013WUC - SD13

WHAT WE BOUGHT It Wasn’t Shoes! April 10, 2013WUC - SD14

Mesquite Asset Purchase S empra’s Mesquite plant selected –2 power block combined cycle generating station –Plant went online 2003 –580 MW summer/ 625 MW winter capacity per block Key terms –$371 million purchase price for one block –SRP will operate the entire generating station –50% ownership of common facilities and water rights –Sempra will purchase back equivalent capacity from SRP for first three to seven years at market prices April 10, 2013WUC - SD15

Mesquite Strengths Best economic value in RFP with least performance risk –Premium plant design and well maintained –Option to sell capacity back to Sempra Sempra strong counterparty as co-owner Good location – Hassayampa delivery point Similar configuration to existing SRP GE turbine combined-cycle plants April 10, 2013WUC - SD16

Mesquite Plant 17 Mesquite Power Plant Elliot Rd Palo Verde Generating Station Wintersburg Rd April 10, 2013WUC - SD

Mesquite Water Property April 10, Mesquite Power Plant approx 2 mi Elliot Rd Solar Plant Water well and pipeline easement WUC - SD

THE TRANSITION SRP-izing the Plant April 10, 2013WUC - SD19

The Transition The Goal: A fully functional Power Plant staffed by SRP personnel. April 10, 2013WUC - SD20

The Transition Starting Line – What did we need? Reaching out – Building the team – Finding the LEADERs – Letting them LEAD What Did It Take? – Weekly meetings – Resolving the Speed Bumps April 10, 2013WUC - SD21

The Switch Over 11:59 p.m. February 28 th SRP assumed ownership of Block 1 and operations of Mesquite Generating Station April 10, 2013WUC - SD22

Thank you! May Millies Power Generation Services Salt River Project April 10, 2013WUC - SD23