Vbine Energy Generator Assembly Pictures and Info Slide Show.

Slides:



Advertisements
Similar presentations
-PROTECT- Protect your $ Investment.
Advertisements

Stable Rise – Fixed Bracket / Stationary Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Optical Manufacturing Solutions 1 Probe Assembly.
Build the Tumbler.
RL brake caliper Installation instructions Included parts: Solid billet aluminum caliper brackets (qty 2) 9/16 grade 8 bolts (qty 2) 9/16 grade 8 washers.
Laser Enclosure to Elevated Rail Assembly Wyman Gordon Forging Locator Original Revision: 2/14/2013.
Rev. A Control Number XXXXXXXXXXX Effective Date 10/2/2008 Field Work Instructions for Placard replacement Functional Trainer Page 1/4 Revised Date 10/2/2008.
Session 8 Type IX Crash Cushion CAT-350 Trinity Highway Products.
Polaris Predator Installation Manual. STEP 1: Remove ATV Rear Tires Remove ATV right side wheel hub Remove ATV stock swing arm (2 bolts) KTRACKS.
The Most Powerful Diesel Engine in the World - 81,000kW! The Wartsila-Sulzer RTA96-C turbocharged two-stroke diesel engine is the most powerful and most.
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
Feasibility MSA P Base Plate Feasibility 3 plastics were looked at for MSA mounting board material: ABS, Acrylic, and polypropylene. Due to cost.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
MTF SLIT COMPONENTS Adjusting Blocks and Mounting Plate Steel Blocks
1 TCS Lab Motors-2 (10/20/03) Design Changes since Version-1 1)Changed Encoder: now using R135S-03600Q-5L16C18TP-04EN 2)Eliminate Outriggers: Retain bolts.
Hydro-Electric Generator Manual Group number 403 Dan KJ Daewoo JT Group number 403 Dan KJ Daewoo JT.
Reed Switch Motor By Troy Coleman & Colby Cravens.
School Name Date Volunteer Name Electric Generator SEEDKIT Workshop.
Bedplate The bedplate is foundation on which the crosshead diesel engine is built. It must be rigid enough to support the weight of the rest of the engine.
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
Ray Hafalia, Jr.4 February, 2009 LQSD MAGNET HANDLING OFF-LOADING – Rev-0 After removing bolts connecting magnet structure from shipping frame and after.
Perry Lapper Progress. Frame With Actuators Outside Frame.
Moment Connection Requires Bolts Outside the Flanges
Barrel Calorimeter Support Mechanism Two designs are proposed for review –Design1. Individual module (Segment) of the Barrel Calorimeter is placed inside.
TF Coil Vacuum Vessel Wire Rope Tensioning Fixture 3 Per Segment Horizontal Stop 3 Per Segment Wood Block 2 Per Segment TFTR D&D FMEA REVIEW Vacuum Vessel.
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
Shear Problem Defined There are no bolts on the inboard side of the coil structure to account for shear forces. Bottom Line: friction alone will not prevent.
14.52 in Attach the Axle to the chassis using the four (4) bolts, washers, and nylon lock nuts. Mount the tires. Note: The wheel recess outside on the.
NSTX NSTX Center Stack Upgrade Ensure fatigue resistant Welds: minimum # of locations shown, could be more. Various Weld Reinforcements & Hardware Replacement.
LAB #10. Governor Control Arm Using a 10mm socket install the two bolts that hold the governor control arm. Finger tighten then torque to 100 “#
Engine Reassembly Technicians need to take their time when reassembling an engine. This is not a race! Listen for instruction when to add the next piece.
Side view of generator. Close up of unused grounding pad - gives provisions for mounting the absorber.
Dr. Dominique Derome 1 If a portion of the cavity is left empty to provide an air space (with a min. width of two inches), the wall works as a Rain screen:
½ ” steel plates 1/8 ” Steel C channels; 3 ½” inch wide each The Laser Holder Support Frame Geophone platforms (to characterize fixture motion) Stiffening.
LARP Collaboration Meeting Racetrack Coil Fabrication
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
1 2 Remove side trim panel Pop out plug Remove recline lever Unplug power seat Remove side trim panel.
House Construction.
AVIVA™ ELECTRIC BIKES VIPER ASSEMBLY INSTRUCTIONS Aviva™ - For A New Way Of Life.
1 Equilibrium The Balancing Robot By: Kerry Scharfglass Whiz Kid.
WeldingRod’s Exactly Constrained 3D Printer Plate Identification and Stuffing.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
HQ02a Magnet Interfaces at FNAL D.W. Cheng 3/6/2013.
RockOn! RockOn! Structure Build RockOn! 2009.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
To install the four wires from the back of the coil machine, loosen the four knobs. Keep each wire in center under each knob, off to the side will allow.
STEP 1: ASSEMBLE ANGLE PLATES
Activity 4.2.8a Satellite Flight Satellite Robot Construction Guide
INSTALLING BYRNE POWER BOX INTO FLEX SYSTEM
Adjust the BalaceBox springs to balance
Start on the corner of your picture *(Not the corner of the paper)
LARP Vertical Test Facility
STEP 1: ASSEMBLE ANGLE PLATES
T400 Motor Replacement.
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
Flag Installation on Roll-up Signs
Required tools for installation of a V-1020C Speaker with V-9914M-5 Metal Bridge.
Flag Installation on Roll-up Signs
Additional Upstream Coil Shielding
Guide Roller Installation
Activity 4.2.8a Satellite Flight Satellite Robot Construction Guide
McMaster linear bearing #6709K180 with guide rail suppressed
Additional Upstream Coil Shielding
Required tools for installation of a V-1020C speaker with V-9914 bridge.
STEEL PLATES.
Reader Swap out Guide.
Valve stem “gag” mechanism
Presentation transcript:

Vbine Energy Generator Assembly Pictures and Info Slide Show

Spindle with 4.5 inch hole to allow for communication wires.

Double Roller Bearing

Double roller long life bearing handles loads up to 10,000 lbs side and end thrust. Unit is less than 1,000 lbs so there is very little stress on the bearing.

Base Plate attaches to spindle

Spindle and Base Plate

Base Plate with Hardware

Bolting Base plate to Spindle

Bottom Flywheel with Double Roller Bearing

Installing bottom flywheel with double roller bearing.

Studs and Spacers for connecting to top flywheel

Installing 3 phase Torroidal coil. Mounted between two steel flywheels with magnets.

Installing top flywheel with top guide bearing (2 bearings in total).

Tighten everything up and bench test.

Moosomin, SK. Test facility.