IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354.

Slides:



Advertisements
Similar presentations
BIM Education at Stanford University
Advertisements

CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this.
Building Information Management (BIM)
PRODUCT MODELLING. Eastman C (1999). Building Product Models, CRC Press, Boca Raton Smithers T (1989). AI-based design versus geometry-based design or.
What is the Enerjetic Business? The business offers consulting and reporting tools to report on energy and related data for business purposes. Common uses.
AMCA Consultant Process. 2 What do you do?  IPD? (Integrated Project Delivery) 
BIM EXECUTION PLANNING PROCESS
Sustainable Architecture Presented by Caroline Batson Senior Architect and Sustainability Manager.
L2 Compliance: Project Darwin
© 2009 Carmel Software Corporation Stephen Roth, PE, LEED AP Principal of Carmel Software Corporation and gbXML Administrator Green Building XML The Open.
Chapter 9 Integrative Process 1 © 2013 Green Building Academy. All rights reserved.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Getting The Theory Down to Earth Project Plan Dubai September 2007.
© 2012 Autodesk Beyond Design with Autodesk Revit 2013 and Autodesk 360 Cloud Services Kal HouhouJohn Harriman BIM ImplementerPrincipal.
Commercial Building Project Portfolio
Wayne Howatt 01. Welcome The Climate Challenge Director, Dearle & Henderson for Scottish FHE Institutions.
BIM Me Up, Scottie! The Next Generation in Construction Technology.
Energy Calculations Dr. Sam C M Hui
Introduction to Integrated Design of Low-Energy Buildings Professor Svend Svendsen Department of Civil Engineering Technical University of Denmark
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 1 What needs to be Commissioned in Zero Energy Buildings? Jorge Torres Coto.
January 2013 BIM the cost of sustainability BIM And the cost of sustainability Delivering sustainability.
Lecture Objectives: Finish wit introduction of HVAC Systems Introduce major ES software.
WebShow_PM4D.ppt / MJo 1 Product Model Approach in Design, Construction and FM Development Project : Product Model 4D – Construction Pilot (PM4D) Pilot.
BIM Overview. B uilding I nformation M odeling What does BIM Stand For?
Mathew Miller.  SMPC Architects  Associate – BIM Manager  Construction Specifications Institute- CSI  US National CAD Standard- NCS  UDS Task Team.
The BIM Project Execution Planning Procedure
NEW COMMUNITY FACILITY Adam Kroll - Lighting / Electrical - Consultant: Dr. Richard Mistrick - Tech 3: Schematic Design.
Concept of Energy Efficiency. Buildings, as they are designed and used, contribute to serious environmental problems because of excessive consumption.
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
Course Number Course Name Faculty Name University Logo T. Sulbaran & M. Shiratuddin - BIM for Construction Using ArchiCAD – Thomas Delmar Learning – ASC.
Information Integration in Construction. Construction information In construction, architects, engineers, planners, contractors, facility managers....
4NJT opt BuildingSMART Munich APRIL ICT ENABLED COLLABORATIVE WORKING Nick Terry BDP Chairman IAI UK Chair & International Deputy Chair Munich.
Calculation BIM Curriculum 07. Topics  Calculation with BIM  List Types  Output.
Phoenix Convention Center Phoenix, Arizona Introducing the Building Energy Asset Score Building Performance Session 2: Elements of Building and Data Management.
Benjamin Welle Stanford University Grant Soremekun Phoenix Integration
GSA Early Concept Design Project – Energy Analysis
Predesign Conceptual Design Design Development Detailed Design & Documentation Construction Operations and Maintenance.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Fundamentals of LEED v4 for
Introduction to BIM Module 02 – Building Envelope.
The Influence of BIM on Quantity Surveyors Presented by: Syukri Zulkipli Alex Lim.
Introduction to BIM Module 08 – Cloud Rendering. Introduction to BIM In this lesson, students explore the potential of infinite computing using Autodesk®
Chapter 8 - Integrative Process
Integrative Process Lori A. Brown, LEED AP BD+C – Power Jam Study!Lorisweb.com1.
The importance of process in high performance building design.
BIM (Building Information Modeling) Revit Services - By Revit Modeling India
土木工程概论 Introduction to Civil Engineering 第四章 建筑工程 Chapter 4 Building Engineering.
Overview and Update E7A Renewal Project. Exterior View E7A Renewal and Atrium Link to E7B.
The Design Team Carl James.
7D 6D 5D 4D 3D bIM Dimensions bIM Services ESTIMATING
Building Information Modelling
BIM & IPD This PPT is about Building Information Modeling (BIM) and
BIM EXECUTION PLANNING PROCESS
Energy Saving Bureau Industrial energy audits in coherence with Directive on the promotion of end-use efficiency and energy services.
Beck Technology Innovation in all Dimensions.
EXTRA SLIDES.
Digital Transformation AGC Glass Products in BIM and Building Façade
BIM Services in India - Conserve
Commercial Building Project Portfolio
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
BIM - Building Information Modeling A well-structured BIM is a key to achieve success in the Building Design and Construction process. Qatar Green Leaders.
BEEP Integrated Design Process for Energy Efficient Buildings
BIM EXECUTION PLANNING PROCESS
LEED BD+C – Integrative Process
Implementing Revit and Putting ACE BIM and CAD Standards
Introduction into CAD.
AB1420: 3D IDP (Integrated Design Process) Integration Using GIS and BIM Techniques Charles McLean BIM Consultant
DBIA Manual of Practice
CIC BIM Competition Presentation Template & Content Guide
Presentation transcript:

IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: C:

0930 – 0940 Welcome and Introduction SG 0940 – 1030 BIM Integration Overview SG 1030 – 1100 The Issues 1100 – 1110 Comfort Break 1110 – 1145 Understanding Complexity 1145 – 1230 Question and Answer Overview

BIM (Building Information Modelling) −A process of generating and managing building data during its life cycle. It can use three-dimensional, real-time, dynamic building modelling software to increase productivity in building design, construction and maintenance period. −“ A model-based technology linked with a database of project information” according to American Institute of Architects What is BIM?

Multiple models into a “composite model” What is BIM? Energy Model Composite Model Architectural Model Structural Model Electrical Model Plumbing Model BIM (linked with phasing, sequencing, construction schedule) Mechanical Model Graphical information -3D objects visual in the model Non-graphical information - Performance data Linked information - Schedule & cost information Cost Model Compliance Model Other Model

BIM process- a collaborative process Building Owner f Architecture Contractor Civil Engineering Facilities Manager Construction Manager Electrical Engineer Mechanical Engineer BIM f Integrated Design Process

Conventional design process Building design process Master Planning Concept Design Schematic Design Detailed Design CompletionIn use Performance analysis tool Contractors, construction manager, commissioning authority, cost estimator Mechanical, electrical, & civil engineers Mainly architect, structural engineer & clients Planning staff, clients community member Architect & clients A linear design process Users

Conventional design process Construction Tender documentation Detailed Design Schematic Design Concept Design Consultation & Engagement Project start completion ConstructionConstruction Documents Detailed Design Schematic Design Time Effort

Integrated design process Building design process Traditional Effort Time Construction Documents Detailed Design Schematic Design Construction Key elements of integrated design process Inter-disciplinary collaboration between architects, engineers, cost consultants and facility managers from the beginning of the design process Discussion of the various important performance issues and the establishment of a consensus on this matter between client and designers Budget restrictions applied at the whole building level, with no strict separation of budgets for individual building systems. Involvement of specialists (e.g. energy engineering, energy simulation, daylighting, comfort) Data sharing Clear articulation of performance targets and strategies, to be updated throughout the process by the design team Documentation and transparency of design decisions

Integrated design process Measurement & verification Building design A multi- disciplinary design team Concept design Master planning Schematic design Detailed design Completion In use process Building Performance analysis tool Mater plan modelling Conceptual modelling Parametric modelling Load/Energy modelling Predictive/incentive modelling Compliance modelling A multi-disciplinary design team Landscape architect Ecologist Architect Energy specialist Structural engineering Civil engineering Mechanical engineer Electrical engineer Plumbing engineer Other specialists(fire, acoustics, daylighting, controls, etc.) Facility manager Contractor Construction manager Cost estimator

Building design process Master Planning Concept Design Schematic Design Detailed Design CompletionIn use Climate Locality Site features Nat resources Urban form Urban solar Urban light Visualise Brief consequences Building type Climate & bldg type Building form Footprint headlines Headline design directions Headline sustainability directions Visualise Baseline solution Baseline outcomes Footprint Scheme directions Building solar Building light Renewable directions Sustainability directions Basic loads Compliance directions Visualise Brief refinement Detail definitions Systems HVAC Air flows Building detail feature design Loads – steady state Energy – dynamic Plant size Optimisation Energy compliance Sustainability compliance Certification CFD etc studies Visualise Certification Energy in use Re-certification Controls Re-furbish & improve

Integrated approach to project delivery model of the Scottish Parliament Building Project location: Glasgow Master planning What if climate change? 2050?

Integrated approach to project delivery model of the Scottish Parliament Building Concept design Sketch model VE model VE models with different glazing percentage

Integrated approach to project delivery Schematic design VE model with 20% glazing Suncast EPC Thermal result Radiance MacroFlo Apache System

Integrated approach to project delivery Detailed design CFD HVACCost Plan Suncast Simulex EPC Radiance

Model Merge Original Model Room Data New Model Room Data Changes to Imported Geometry are Updated in Model Without Overwriting Input Data

Autodesk Revit Architecture 2008, 2009, 2010, 2011 Autodesk Revit MEP 2008, 2009, 2010, 2011 ArchiCAD via gbXML Microstation, Allplan via gbMXL Google Sketchup 6 & 7 Google Sketchup Pro 6 & 7 The benefits…. …don’t have to rebuild geometry to run analysis …the potential to change the dialog between architects and engineers What does software does IES work with? Graphisoft ArchiCAD gbXML Other gbXML

IES VE: Autodesk Revit Plug-in Updates gbXML How it works: 1.Draw Geometry in Autodesk Revit 2.From the Revit Toolbar: Set Building Location Define Building Parameters: Building Type Construction Materials Building System Types Room Types 3.Launch IES VE-Toolkits/VE-Pro 4.Choose Analysis Type

gbXML Hierarchy

Adjacencies We spoke about the importance of ‘rooms’. Within Revit, you can define a wall to be an exterior wall, but this will mean nothing when it comes to the gbXML translation. The only way a wall is recognized as an exterior vs an interior wall is by their adjacencies. So for an element to be defined as ground floor slab, it is a horizontal surface adjacent to a room (otherwise it is a shading device) that is not in contact with any room below. For a floor, it’s a horizontal surface that is in contact with a room above and below. For a roof, it’s a horizontal surface that is not in contact with any room above. Exterior walls are vertical surface that is not in contact with an adjacent room on one side

Adjacencies

Keep It Simple Keep your geometry as simple as possible! Is this geometry absolutely necessary for the type of analysis I am running? Can I eliminate anything from my model? (Purge unused, etc) There are often thousands of shading surfaces in a Revit file. If you are doing a daylight analysis, are the 4 cm mullions going to affect the outcome? They will affect the runtime significantly.

Basic Modelling - Columns

Basic Modelling – Problem Wall Conditions

Basic Modelling – Shading Elements

Basic Modelling – Openings

IES VE: gbXML “Healing Tools”

Software Suite Integrated sustainable building design analysis tools Dr Sarah Graham