Background Cooper Crouse-Hinds Industries is a leader in the manufacturing of luminaires, an encased lighting system, for hazardous locations. These luminaires.

Slides:



Advertisements
Similar presentations
Design Review UL Vibration Test Apparatus May 13, :30PM Est.
Advertisements

PROJECT MEMBERS: COLIN PAYNE-ROGERS JACOB LENNOX Change of Resistance Test Stand PROJECT GUIDE/MENTOR: DR. BENJAMIN VARELA PRIMARY CUSTOMER: JOE MANAHAN.
P10511: Miniaturization of Xerography Derek Meinke (ME, PM) Matthew Liff (ME) Tony Zhang (EE) Zaw Htoo (ISE)
P11511 Project Review. Project Team, Faculty, and Customer Project Team: – Project Lead: Kevin Argabright (ME) – Team Members: John Fitch Dean (ME) Mike.
EDGE™ Final Project Presentation P09141 – Satellite Thermal Heater Controller Anthony Berwin (Mechanical Engineer)
Senior Design: Validation of Design December 15, 2008.
Academic Advisor: Dr. Dave Turcic Team Members: Ron Pahle Khoa T. Tran Duc M. Le Thanh Q. Nguyen Shafi Alhajri Sponsoring Company: Edwards Vacuum Ltd.
Optical Stage Redesign Team 4025 Senior Design II – Spring
PASCOR Group PASCOR Group Industry Adviser: Craig Smit Product Engineer Faculty Adviser: Chien Wern, Ph.D. Team Members: Jeremie Bilisari Steve Greene.
FINAL PRESENTATION P The Team Austin Frazer Role: Lead Engineer - Analysis Major: Mechanical Engineering Eileen Kobal Role: Lead Engineer – Mixtures.
The objective of this project was to design a dynamic similarity test rig to replicate the operating conditions of the main crank bearing in the Dresser-Rand.
Design Review UL Vibration Test Apparatus May 13, :30PM Est.
1 P14471 Vibration Testing Apparatus II Final Review 5/13/2014 Brett Billings Jacob Gardner Nick Greco Ron “Sparky” Jimbo Claire Kobal Ryan Selig Ashley.
CHANGE OF RESISTANCE TEST STAND – P13472 Mission Statement: To design a test stand capable of measuring the temperature of an H.I.D. Magnetic Ballast using.
Electrosurgical Life-test Fixture Team E.L.F. Design Review Mechanical Engineers Mary Hamann Brad Watson Naomi Sanders Electrical Engineers Tony Giedl.
MSD P15280 RIT HOT WHEELZ TEST BENCH. AGENDA ❖ Review Problem Definition Material ❖ Review System Design Material ❖ Sub-System Design Review ▪Motor.
MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.
Jake Manley-Project Lead/EE Mitchell Sedore-ME Brian Benner-ME Anushka Kalicharan-ME Kyle Abbott-ME.
P14474: Hydrostatic Test Apparatus Jake Manley Anushka Kalicharan Mitchell Sedore Brian Benner Kyle Abbott.
Systems Level Design Review UL Vibration Test Apparatus January 11, 2013 KGCOE Room # :00AM-12:00PM Est.
From Left to Right: Adam York, Brian Brink, Betty Jo, Mitchell Greene, Marshall Noble. (NOT PICTURED): Stephanie Jacobs Project.
Loading Apparatus for High Velocity Tissue Rupture Mechanical Engineering Dalhousie University Senior Design Project Winter 2010.
Design Review UL Vibration Test Apparatus February 21, :30AM Est.
Pathway:Engineering Graphics & Design Course:3D Modeling and Analysis Unit 6:ENGR-MA-6 Mechanisms: Belt and Chain Drive Drawings.
Decision Making Matrix
P14471 Vibration Testing Apparatus II Detailed Design Review 12/10/2013 Brett Billings Jacob Gardner Nick Greco Ron Jimbo Claire Kobal Ryan Selig Ashley.
Multidisciplinary Engineering Senior Design Hardinge Universal Turret Project Critical Design Review May 13, 2005 Project Sponsor: Hardinge.
P14471 Vibration Testing Application. Team Introductions NameRoleMajor Brett BillingsTeam LeaderIndustrial Engineer Nick GrecoLead EngineerMechanical.
TEAM 14 John Armitage Douglas DeVoto Brian Polkowski Marykate Wioncek SOUTHCO Vibration Fatigue Tester.
Volume melted in batch >= 20 gallons Flow Rate >= 50 lbs/hr Width
Preliminary Detailed Design Review P15080 Flow Culture System November 13, 2014.
PROJECT MEMBERS: COLIN PAYNE-ROGERS JACOB LENNOX Change of Resistance Test Stand PROJECT GUIDE/MENTOR: DR. BENJAMIN VARELA PRIMARY CUSTOMER: JOE MANAHAN.
DESIGN AND FABRICATION OF AN EXPERIMENTAL SETUP FOR SINGLE PLANE BALANCING Project Members- Nithin Seenivasan Nandaganesh M.R.Chitthaarth 8 th March, 2010.
P  Customer Dr. Schrlau  Team Jacob Bertani Bridget Lally Avash Joshi Nick Matson Keith Slusser  Guide Bill Nowak.
P16415: Human Powered Centrifuge Amanda Johnson Nathan Corr Pieter Werner Joanna Jayawickrema Laura Pratt.
ETM 5131 – Capstone II Re-Development of New Component Implementation Process – Results By Scott Moeller.
Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O’Connell, Sarah Salmon, James Brinkerhoff Group Number:
through Introduction  Particle Imaging Velocimetry (PIV) uses a sheet laser beam to illuminate particles that cross the sheet.  The particles.
P16453 Problem Definition Review Kris Kidder | John Dolan | Shay Stanistreet | Anthony Miuccio.
P16453 Subsystem Design Loading, Measurement, Control, and Test of a Journal Bearing Test Platform Kris Kidder | John Dolan | Shay Stanistreet | Anthony.
P16680: AATech Universal Oil and Bag System System Design Review 9/29/15.
Magnetically Levitated Propeller Bernie Garcia (ME, Team Leader), Joe Bernardini (ME, Scribe), Elijah Sensenig (EE, System Integrator), Zachary Louison.
Luminaire Vibration Test Apparatus: P14471 Team MemberMajor Brett Billings, Team LeadIndustrial and Systems Engineering Nicholas Greco, Lead Mechanical.
Customer Needs Increase Productivity Safety of Machine Minimize Physical Exertion Reduce Downtime Complete through cut of straws on first actuation with.
Electrophotographic Cascade Development Apparatus Zachary FoggettiBridget Kearney Dalton MeadRuishi Shen Michael WarrenThomas Wossner.
MSD II System Demonstration P15044 – Intelligent Mobility Cane4/16/2015.
14471 Vibration Test Apparatus: Systems Design Review Team Lead: Brett Billings Lead Engineer: Nicholas G Scribe: Ashley W EDGE: Claire Kobal Team Members:
P14471 Vibration Testing Apparatus II Subsystems Design Review 10/29/2013 Brett Billings Jacob Gardner Nick Greco Ron Jimbo Claire Kobal Ryan Selig Ashley.
Motor Assisted Wheelchair Design Review 10/01/15.
P14471 Vibration Testing Apparatus II Integration Demo 4/15/2014 Brett Billings Jacob Gardner Nick Greco Ron Jimbo Claire Kobal Ryan Selig Ashley Waldron.
P14471 Vibration Testing Application. Team Introductions NameRoleMajor Brett BillingsTeam LeaderIndustrial Engineer Nick GrecoLead EngineerMechanical.
R16601: Glass Fab Wire Saw Integration/Roadmap. “Glass Fab, Inc. is currently looking to replace their wire glass cutting saw with a smaller, more efficient.
R. I. T Mechanical Engineering Design Concepts and Selection Design Project Management Rochester Institute of Technology Mechanical Engineering Department.
P08452 Reciprocating Compressor Installation, Revamp, and Interface Installation Designed and prepared the installation guidelines and test cell setup.
understanding of the terms;
Flexible Manufacturing
Dr. Marcos Esterman Faculty Guide W. Casolara Project Leader
Right Move, Right Place, Right Time
Multidisciplinary Capstone Design:
Kris Kidder | John Dolan | Shay Stanistreet | Anthony Miuccio
MSD P15280 RIT HOT WHEELZ TEST BENCH
P07107: Mission Control Procedures Aerospace Systems and Technology
P16462: Wind Energy Base Station MSD II Phase 5 Review 5/6/2016
P15661 Reciprocating Friction Tester Base Subsystem
P16462: Wind Energy Base Station MSD II Phase 4 Review 4/15/2016
Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng.
PASCOR Group Industry Adviser: Craig Smit Product Engineer
Multidisciplinary Capstone Design:
Hydrostatic Test Apparatus
Gleason’s Current Force Application Process
Presentation transcript:

Background Cooper Crouse-Hinds Industries is a leader in the manufacturing of luminaires, an encased lighting system, for hazardous locations. These luminaires are placed in environments in which they are subject to harsh vibration disturbances. Luminaires must meet the testing standards set in UL 844, which include vibration RPM and displacement, apparatus setup, and test duration. The company is currently using an outdated testing apparatus and would like to incorporate improvements into the new design. This project is a continuation of P13471 which started the process and has already built the eccentric drive mechanism. The goal of P14471 was to finish the test apparatus by adding the frame, motor, and control system. Left to right: Luminaire; CCH’s current apparatus; The eccentric drive mechanism Acknowledgements Joe Manahan – Cooper Crouse-Hinds Kevin Wolfe – Cooper Crouse-Hinds Mike Zona – MSD Team Guide Dr. Varela – RIT Faculty Adviser Jan Maneti – RIT Sr. Mechanical Technician Rob Kraynik – RIT Sr. Mechanical Technician Ryan Crittenden – RIT Sr. Electrician Larry Meyer – RIT Electrician Conclusions All engineering metrics met during preliminary testing at RIT Final testing to occur at Cooper Crouse-Hinds in Syracuse, NY What would we do differently? Review the previous MSD team’s work more thoroughly before planning Verify existing parts match CAD models Lessons Learned: To effectively communicate between both team members and others helping with the project. To compromise on differences of opinions between team members To work together to meet internal deadlines To clearly define team member roles To effectively troubleshoot unforeseen complications Luminaire Vibration Test Apparatus II P14471 Design Specifications and Process The House of Quality Matrix links the Engineering Requirements to the Customer Requirements, using a priority scale (5 = highest). Design process: 1.Functional decomposition identified the different functions 2.A morph table was used to brainstorm options for each 3.Pugh charts were used to select the best option for each Final Design The final concept is made up of a painted steel frame, a vertical 3 phase 240 VAC motor, a drive belt system with a belt guard, an encoder, a dial gage, an LCD screen, and an emergency stop button. These components fulfill the requirements found in the House of Quality Matrix. Setup improvements from the P13471 Design: Access holes added to eliminate unnecessary disassembly Finer set screw for better more precise adjustment Quick change conduit system Reduced setup time by 67% Image of the bolt access holes Brett Billings Industrial and Systems Engineer Nicholas Greco Mechanical Engineer Ashley Waldron Mechanical Engineer Claire Kobal Mechanical Engineer Ronald Jimbo Electrical Engineer Ryan Selig Electrical Engineer Jacob Gardner Mechanical Engineer Image of the hex wrench access hole for the set screw Set ups made for various sizes CAD model of final assembly for MSDIFinal assembly for MSDII Top 5 requirements: Displacement = 1/32” Vibration = 2000 RPM Duration = 35 hrs Safety Ease of Use