Sudan Joint Assessment Mission - Overview and Initiating Phase - Jeni Klugman World Bank May 14, 2004.

Slides:



Advertisements
Similar presentations
KENYA HEALTH SECTOR PARTNERSHIP Third IHP+ Country Health Sector Teams Meeting Brussels, December 2010.
Advertisements

Governance of Disaster Reduction Priorities and Organizational Arrangement for the Implementation of HFA Martin Owor Assistant Commissioner Head of Disaster.
WCDR Thematic Panel Governance: Institutional and Policy Frameworks for Risk Reduction Annotated Outline UNDP – UNV – ProVention Consortium – UN-Habitat.
National Strategy Joint Assessment Mission 1.Capacity Building and Institutional Development 2.Governance and Rule of Law 3.Economic Policy 4.Productive.
Poverty Reduction Strategies: A tool for implementing the BPOA Linda Van Gelder The World Bank.
Enhanced Integrated Framework for Trade-Related Technical Assistance to Least Developed Countries (EIF) IF Programme Implementation Unit (PIU) World Trade.
1 The PEFA Program – and the PFM Performance Measurement Framework Washington DC, May 1, 2008 Bill Dorotinsky IMF.
PRESENTATION AT THE WORKSHOP ON LDC PRIORITY NEEDS FOR TECHNICAL AND FINANCIAL COOPERATION 29 OCTOBER 2009 GENEVA Sari Laaksonen Coordinator, Integrated.
Governance for REDD+ Crystal Davis Governance of Forests Initiative World Resources Institute REDD Civil Society Coordination Seminar CIFOR campus, Bogor.
Group 3 Financing EFA: Domestic resource mobilization and external support Facilitator: Robert Prouty, The World Bank.
INITIATING THE PLANNING PROCESS. CONTENT Outputs from this stage Stage general description Obtaining government commitment Raising awareness Establishing.
HIV/AIDS: An Unprecedented Development Crisis –One of the biggest obstacles to achieving MDGs – UNGASS 2001 –Strikes at the core of development Reverses.
PRESENTATION AT THE ASIAN EIF REGIONAL WORKSHOP June Kathmandu, Nepal THE ENHANCED INTEGRATED FRAMEWORK PROGRAM.
A New Initiative on Earth System Research for Global Sustainability
Results Monitoring – Second Sudan Consortium Government of National Unity, Northern States, Three areas. 1. Establishing core capacity  Basic financial.
Framework for Sustained Peace, Development, and Poverty Eradication Dr. Taj Elsir Mahjoub Nairobi 2005.
Irrigation and Water Supply sector By Nicolas Rivière LRRD Project.
UN REDD a collaborative programme of UN agencies on Reducing Emissions from Deforestation and Forest Degradation to support developing countries FAO-UNDP-UNEP.
Conflict Sensitive Education Pack : Integrating Conflict Sensitivity in Education Programmes, Planning and Policies Seminar: Education and Conflict: the.
Developing a Strategy: Managing the process Neil Fantom Development Data Group.
System of Environmental-Economic Accounting SEEA Implementation Guide and Diagnostic Tool and Suggested Structure for Assessment United Nations Statistics.
The Process of Conducting a Post Disaster Needs Assessment (PDNA) United Nations Development Programme Bureau for Crisis Prevention and Recovery Bangkok,
Integrating Environment into Development Policy: The World Bank’s Experience with Country Environmental Analysis Sub-Regional Workshop for GEF Focal Points.
UNAIDS Response to the Second Independent Evaluation.
Capacity Building for Better Agricultural Statistics Misha Belkindas and Graham Eele Development Data Group, World Bank.
The State of Capacity Development in Africa Report Overview and Guiding Questions to operationalize the Initiative July, 2011.
POST DISASTER NEEDS ASSESSMENT I n t e r n a t I o n a l R e c o v e r y P l a t f o r m.
1. IASC Operational Guidance on Coordinated Assessments (session 05) Information in Disasters Workshop Tanoa Plaza Hotel, Suva, Fiji June
The IASC Humanitarian Cluster Approach Angelika Planitz UNDP BCPR Developing Surge Capacity for Early Recovery March 2006.
Global Task Team: Improving AIDS Coordination Among Multilateral Institutions and International Donors Briefing for Theme Group on HIV/AIDS 1 November.
Agriculture Sector Assessment - Ukraine Overview of the Sector Wide Approach (SWAP)
Preparing for a Joint Needs Assessment (JNA) and Recovery Framework (RF) Presentation of the UN/WB JNA Preparation Mission.
Objectives The objective is to undertake a Somali Joint Needs Assessment and develop a Recovery Framework (JNA&RF) –Co-led by United Nations & World Bank.
INITIATING THE PLANNING PROCESS. CONTENT Outputs from this stage Stage general description Obtaining government commitment Raising awareness Establishing.
February 21, JAS Consultation between the Government of Tanzania and Development Partners February 21, 2006 Courtyard Hotel, Dar es Salaam.
The GEF/UNDP/UNEP National Communications Programme for Climate Change United Nations Development Programme UNFCCC Workshop on the Preparation of National.
PACIFIC AID EFFECTIVENESS PRINCIPLES. Purpose of Presentation Provide an overview of Pacific Principles on Aid Effectiveness Provide an overview of Pacific.
PARIS21/CARICOM Workshop on NSDS, Trinidad and Tobago, July 2009 NSDS Overview Presentation by PARIS21 Secretariat.
The China Biodiversity Partnership And Framework for Action (CBPF) A Programmatic Approach for Biodiversity Conservation.
Grant Cameron World Bank Eric Bensel Paris21 Roundtable discussion at the 18 th session of the CCSA Luxembourg, Sept 7-9, 2011.
Objectives and Strategies of RRSF The RRSF has been prepared with an overall objective and four specific objectives to overcome the identified problems.
LIBERIA’S Joint Needs Assessment & Results-Focused Transition Framework Christian G Herbert Minister of Planning and Economic Affairs National Transitional.
The Somali Joint Needs Assessment Concept Note Preparation and implementation Nov 2005.
GAC STRATEGY IMPLEMENTATION: LEGAL IMPLICATIONS Core Course on Public Sector Governance and Anti-Corruption April 23-26, 2007.
Integrating GEF in Environment and Sustainable Development Plans and Policies - – Jamaica’s Experience GEF CSP Sub-regional Workshop for Caribbean Focal.
DEVELOPMENT COOPERATION FRAMEWORK Presentation by Ministry of Finance 10 December 2013.
Elements of an Effective Regional Strategy for Development of Statistics - SADC Ackim Jere SADC Secretariat Gaborone, Botswana PARIS 21 Forum on Reinforcing.
Statistics for Transparency, Accountability, and Results: The Busan Action Plan for Statistics PARIS21 & The World BankMeeting on the Busan Action Plan.
A short introduction to the Strengthened Approach to supporting PFM reforms.
Purpose Urgent delivery of peace dividends; Finance outstanding recovery gaps; Promote shift from Humanitarian to recovery/development in support of national.
The World Bank’s Experience with Country Environmental Analysis (CEA) Sub-Regional Workshop for GEF Focal Points Europe and the CIS 7-8 March 2007, Istanbul.
Pacific Regional Joint Preparatory Meeting for the
EUROPEAN COMMISSION EUROPEAN UNION IPA 2010 National Programme Bosnia and Herzegovina EU Delegation to Bosnia and Herzegovina Donor Coordination Forum.
SUDAN: Multi Donor Trust Funds Norway-World Bank Third Workshop Dialogue Washington, DC May 26, 2005.
GENDER IN COUNTRY PARTNERSHIP STRATEGIES - THE VIETNAM EXPERIENCE FEBRUARY 22, 2012 Mette Frost Bertelsen, CPS Co-TTL and Gender Focal Point.
1.1.Recovery strategic planning capacities are strengthened. 1.2.Local capacity for ER planning and implementation strengthened in areas of expertise where.
Regional Action Plan for Sustainable Transport of Dangerous Goods along the Mekong River Final Regional Workshop, October 2014 Bangkok, Thailand.
1 SRCM IN THE ECA SUB-REGIONAL OFFICES (SROs) PROGRESS REPORT November 2012 Addis Ababa, Ethiopia Presented by: Ms. Beatrice KirasoUNECA 1.
Strategic approach to national implementation programmes for SEEA by UNSD Sixth Meeting United Nations Committee of Experts on Environmental Economic Accounting.
UN REFORM Goal: To deliver effective support to countries for sustainable, equitable and accountable development under national ownership and leadership.
SWA’s Role in Improving Aid Effectiveness in the WASH sector SWA Country Processes Task Team Geneva, November 2013.
MOH 2 February Identify needs Prioritize needs Finalize list of endorsed needs Submit needs to MOPAD Consult with donor Negotiation (intra- and.
Assessments ASSESSMENTS. Assessments The Rationale and Purpose for Assessments.
Peacebuilding Priority Plan Heads of Mission
ECOSOC Operational Segment Implementing the internationally agreed development goals, including those contained in the Millennium declaration: national.
Somalia Drought Impact & Needs Assessment
UN REDD FAO-UNDP-UNEP July 2008
Use of National Strategies for the Development of Statistics
… using an approach to Bank assistance that maximizes the effectiveness of scarce resources Greater emphasis on dialogue and analytical work that builds.
Presentation transcript:

Sudan Joint Assessment Mission - Overview and Initiating Phase - Jeni Klugman World Bank May 14, 2004

What is JAM Cross-sectoral needs assessment focusing on longer-term development Follow a comprehensive peace agreement Recent experience includes East Timor, Afghanistan, Iraq and Liberia Result presented at a donors’ conference

Eight JAM teams Governance & Rule of Law Infrastructure Economic Policy & Management Information Social Services Institutional Development & Capacity Building Livelihoods & Social Protection Productive Sectors Sudan JAM

JAM Timeline JAM Preparatory Phase Includes work by clusters working with GoS & SPLM: Awareness raising (managing expectations) ‘Visioning’ Capacity Building for JAM Terms of reference for JAM Analytical/background work Consultations Full JAM: All cluster teams completing overall JAM documentation for donor’s conference building on preparatory phase Six Year Vision and sectoral integration Critical capacity building needs and Quick Impact Programs Broad policy commitments ‘Joint-ness’ and 3 Transitional areas & cross border Budget/costings for immediate needs and priority programs Results Framework Comprehensive Peace Agreement Full JAM Donor’s Conference GoSSPLM Sector work Sector work

JAM Core Coordination Group (CCG) - GoS/SPLM, WB, UN, IPF, IGAD Secretariat with responsibility for overall JAM report JAM Organizational Structure Cross border & National issues JAM Coordination Team – GoS SPLM, UN, WB Secretariat JAM Coordination Team – SPLM SPLM, UN, WB Secretariat Sectoral Teams: 8 International Clusters GoS Sectoral Teams SPLM Sectoral Teams

Preparatory Phase:  Flexible engagement, building on existing strategies & processes, and strengthening capacity – scaled up after peace agreement  Beginning with key experts, the objective is to: Raise awareness about the JAM process Build the capacity of counterpart and international teams to engage in the JAM Visioning to guide future program development Analysis, diagnostic work, and desk studies Identify “quick wins”  Consultative and responsive to demand, ensuring ownership by parties  WB & UN working in partnership with other agencies & donors

A full JAM  Builds on preparatory work  Incorporates shared vision  Integrates sector work & cross-cutting themes  Includes national issues  Prioritizes policies & programs -- linked to macroeconomic framework  Covers three areas and cross-line areas  Covers costing of immediate needs & priorities for Interim Period  Is results-focused & ensures monitoring arrangements

Operational Implications  Starting with identification missions and gradually build up awareness & capacity building activities  Scaled up to full JAM after Comprehensive Peace Agreement  Budgets agreed and secretariats in place  Work closely with counterpart clusters/ coordinated by secretariats (GoS and SPLM)  Two parallel processes under CCG umbrella