C c c Comprehensive Cardiovascular Device Simulation Data and Process Management INTRODUCTION CONTACTS Cardiovascular related simulations such as nonlinear.

Slides:



Advertisements
Similar presentations
The following 10 questions test your knowledge of desired configuration management in Configuration Manager Configuration Manager Desired Configuration.
Advertisements

DIGIDOC A web based tool to Manage Documents. System Overview DigiDoc is a web-based customizable, integrated solution for Business Process Management.
Business Development Suit Presented by Thomas Mathews.
A university wide electronic research ethics review system?
Program Management Portal: Overview for the Client
HP Quality Center Overview.
SysLogix Inc. eProducerPortal.com by. Introduction "'Onboarding” - the process of contracting and appointing new agents. It is used to refer to the administrative.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
Enterprise Content Management Departmental Solutions Enterprisewide Document/Content Management at half the cost of competitive systems ImageSite is:
Statistical Process Control for the Medical Industry.
AFISS Prospectus of Services AFISS offers HACCP food safety and food quality systems development and management services including preparation for regulatory.
Access 2007 Product Review. With its improved interface and interactive design capabilities that do not require deep database knowledge, Microsoft Office.
SE 555 Software Requirements & Specification Requirements Management.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
© 2005 EMC Corporation. All rights reserved. Module 9 Workflows.
Introduction to eValid Presentation Outline What is eValid? About eValid, Inc. eValid Features System Architecture eValid Functional Design Script Log.
SPC for Metallurgy Industry
Welcome to CMPE003 Personal Computer Concepts: Hardware and Software Winter 2003 UC Santa Cruz Instructor: Guy Cox.
Software Engineering Institute Capability Maturity Model (CMM)
Page - 1 Rocketdyne Propulsion & Power Role of EASY5 in Integrated Product Development Frank Gombos Boeing Canoga Park, CA.
2007 Microsoft Office System Client/Server Capabilities Client/server capabilities of Microsoft Office Professional Enterprise Edition 2003 compared to.
Accounts Payables Invoice Automation for SharePoint.
Integrate your people maximize your knowledge Tel SalesBase Customer.
Corporate Efficiency Meeting Improving Your Business Processes Using SharePoint and Beyond.
OAS REGIONAL PROJECT QUALITY MANAGEMENT. What percentage of time in the work day do you have to devote to solving PROBLEMS? - ours or someone else´s (suppliers,
A Product of Copyright © ANGLER Technologies AURA – Quality Compliance Monitoring & Process Management System.
Complete and Integrated Lifecycle Management. Challenges 1.
Configuration Management, Logistics, and Universal CM Issues Larry Bauer Boeing Commercial Airplanes NDIA Conference Miami March 4-5, 2005
AGENDA Welcome and introductions Brief introduction to PSI Mobile Technical Overview Demonstration Q and A Next Actions.
MethodGXP The Solution for the Confusion.
Chapter Seven Process Modeling, Process Improvement, and ERP Implementation.
© VESP International Pty Limited To Contents Slide CLICK to advance slides/ bullet points within slides Integrated Master Planner An Overview.
MobeSys Technologies MobeSys – helping you overcome mobile technology challenges.
University of Puerto Rico at Mayagüez Department of Mechanical Engineering Introduction to NX 6.0 Software Overview Modified by (2011): Dr. Vijay K. Goyal.
Streamlining the Review Cycle Michael Oettli, nlg GmbH Santa Clara, October 10 th.
The MSC.Software Simulation Data Management Initiative
Copyright  2007 MSC.Software Corporation MSC.Software Corporation 2 MacArthur Place Santa Ana, CA 92707, USA Tel: (714) Fax: (714) Web:
Chapter 13: Developing and Implementing Effective Accounting Information Systems
Managing the Validation and Migration from SAS ® to 9.2 on a New Server Carey Smoak Sy Truong.
What is Oracle Hyperion Planning  Centralized, web- based Budgeting and Planning application  Combines Operational and Financial measures to improve.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
© 2008 IBM Corporation ® IBM Cognos Business Viewpoint Miguel Garcia - Solutions Architect.
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
IT Requirements Management Balancing Needs and Expectations.
Copyright  2007 MSC.Software Corporation MSC.Software Corporation 2 MacArthur Place Santa Ana, CA 92707, USA Tel: (714) Fax: (714) Web:
Case Study SummaryChallenges Boston Scientific needed medical translation in different areas in the medical field, including technical, legal and corporate.
Developing Policy and Procedure Management System إعداد برنامج سياسات وإجراءات العمل 8 Safar February 2007 HERA GENERAL HOSPITAL.
Grow your business... Protect their investment. Property Technologies International, LLC Presentation of PTI’s suite of web-based applications for real.
Design Documentation Clint Kehres, Brian Krouse, Jenn Shafner.
Health Plan Solutions Stephanie Rose ECMp, PAHM Insurance Industry Account Manager.
Joel Gerber Zachary Reaver Kurt Schilling.  Provides physical proof of development  Maintains product design knowledge base  Meets government and corporate.
April 8-10, 2002 XXXXXXXXXXXXX Business Unit 2002 Action Plan Your Name January 28-30, 2002 MSC.Software: How to Deliver Software Services Systems Fiat.
© 2013, published by Flat World Knowledge Chapter 10 Understanding Software: A Primer for Managers 10-1.
Software Configuration Management SEII-Lecture 21
TAXCO BUSINESS SERVICES INC. Division of Des-Dawn Corporation BOOKKEEPING | PAYROLL | TAX FILING | TAX PLANNING | CONSULTING INTRODUCING TAXCO BILL PAY.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
The Claromentis Digital Workplace An Introduction
InstantGMP™ MD Electronic Device History File Software for Manufacturing Medical Devices.
Accurate  Consistent  Compliant Contact: i4i the structured content company the structured content company.
© 2014 Phoenix Integration, Inc. All Rights Reserved phoenix-int.com Simulation Workflow Automation and Model Management MBSE Workshop / INCOSE IW 2014.
ValGenesis Closed Loop Change Management ValGenesis, Inc Christy Street, Fremont, CA Ph:
VIEWS b.ppt-1 Managing Intelligent Decision Support Networks in Biosurveillance PHIN 2008, Session G1, August 27, 2008 Mohammad Hashemian, MS, Zaruhi.
1 From Regulatory Intelligence to Compliance Debbie Henderson Head, Global Regulatory Policy EU Ring May 13, 2014.
Enterprise Applications Change Management Process Enhancement Presentation October 1 st 2009.
McGraw-Hill/Irwin © The McGraw-Hill Companies 2010 Internal Control in a Financial Statement Audit Chapter Six.
Introduction.
Section 1 INTRODUCTION.
Final Design Authorization
Service management system at cloud
Presentation transcript:

c c c Comprehensive Cardiovascular Device Simulation Data and Process Management INTRODUCTION CONTACTS Cardiovascular related simulations such as nonlinear finite-element analysis and computational fluid dynamics (CFD) generate very large data sets of results. This data needs to be tracked and managed, especially when multiple mesh refinements and material changes are performed on each model such as the stent shown in Figure 1. If alternate designs need to be explored, then it results in many sets of files generated during simulation. Design modifications and parametric studies magnify the volume of data as new simulation data are either used or generated for each computation. Simulation data may include design models, model configurations, geometry files (CAD), FEM model files, results, design requirements, input & output documents, design validation documents, material properties, load cases, and test data. It may even include non-CAE type files such as documents, spreadsheets, Mathcad* or MATLAB* calculations, MS Outlook* message files, as well as any type of method or template file that generated the content for a computation (see the illustration in Figure 2). If this huge volume of simulation data and the associated design history files are not tracked and managed effectively, then it results in unmanaged information chaos, resulting in poor knowledge sharing, inability to access and reuse prior results, ineffective communication, and process inefficiency within the company. *All trademarks belong to their respective owners. MSC.Software Corporation 2, McArthur Place, Santa Ana, CA Marketing: Technical: Leslie Rickey Kim Parnell, PhD,PE Baskar Rajagopalan Mike Grossen Burcin Ekener Tel: Fax: Toll-Fee: METHODS SOLUTION STEPS CONCLUSION BENEFITS A simulation management system provides benefits such as: Improved R&D efficiency, quality, and risk reduction Regulatory and approval process improvements; potential for use of a limited portal to facilitate review, comment, and response from regulatory staff on submissions Traceability and audit trail for design basis, material and loads data, and experimental validation Dashboard for validation and verification of computational methods Implementation of best practices The implementation of a simulation management system can begin with simulation data and work in process applications. It can be expanded in a logical manner to include the simulation process, test results, and final regulatory submission results. This figure shows specific sets of results and ways that they can be summarized and reviewed. SimManager dashboards or portals can be configured to provide specific views for project management and limited views for regulatory review and communication. There is tremendous potential for streamlining the regulatory submission and review process, resulting in significant time savings. Figure 1: Stent Model Medical Device manufacturers must comply with the revised good manufacturing practices established by the FDA for managing and tracking all aspects of data related to the design of products. FDA submissions require a comprehensive audit trail which includes: Record of all simulation data Revision management and control Correlation with physical test results Proven repeatable methods Software version tracking. SimManager automatically stores all simulation, data files, input data and results, thereby providing a full history of how medical product simulations are performed. This capability instills management oversight into the simulation process and ensures the information provided is realistic, reliable, and traceable. MSC SimManager incorporates comprehensive data and process management tools for: Workflow and task status Design Variants Publishing of analysis/computational data Audit trail and pedigree information Work requests SimManager is vendor-neutral and can incorporate any analysis software or reporting tools such as spreadsheets or documents, and complements existing PDM software. Publish the modified model as a new version Import model data or publish files from SimXpert session Open file from SimManager and modify design Design verification, validation, history Create a ‘Stent’ Project in web- based SimManager Client Revise Model In SimXpert Store Simulation Data in SimManager Keep track of all changes & versions Publish Revised Files to SimManager Create a Project in SimManager Figure 2: ”Unmanaged Chaos” Spreadsheets Documents Reports Models Templates Session Files Macros, Scripts Input Files Curves,Values, Animations, Plots Output Files Material Properties