RF Power R&D David Wildman May10, 2005 Slides “borrowed” from: G. W. Foster, A. Moretti, D. Sun, I. Terechkine, D.Wildman,& D. Wolff.

Slides:



Advertisements
Similar presentations
RF Specification discussion MICE RF workshop 16 th April 2012.
Advertisements

Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
CW RF System for the ATLAS Efficiency and Beam Intensity Upgrade Speaker: Yong Luo, Physics Division, ANL On Behalf of: Sergey Sharamentov, Peter Ostroumov,
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
RF systems for MICE Andrew Moss The MICE RF Group and the TIARA WP7 Team Contributions include Daresbury, RAL, CERN, LBNL, LANL, FNAL, Strathclyde & Sheffield.
Andrew Moss Daresbury Laboratory Collaboration Meeting th 19 th October 2012 RAL MICE RF System review.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
European Spallation Source RF Systems Dave McGinnis RF Group Leader ESS Accelerator Division SLHiPP-1 Meeting 9-December-2011.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
FID Based Pulse Generators for Accelerator Applications Vladimir M. Efanov FID GmbH, 25 Werkstrasse, Burbach, D-57299, Germany 2006.
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
Collaboration meeting, DL, 19 h – 23 h October 2008 Andrew Moss ASTeC Collaboration meeting, DL, 19 th – 23 th October 2008 MICE RF distribution system.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
Linac Marx Modulator Update Trevor Butler 10/29/2014.
RF Distribution Alternatives R.A.Yogi & FREIA group Uppsala University.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Fermilab I. Terechkine1 RF Phase Shifter R&D Proton Driver Review March 15, 2005 T. Barrak, B. Foster, I. Gonin, M. Huening, V. Kashikhin, T. Khabiboulinne,
High Power RF Systems, Control and Distribution in the HINS Alfred Moretti, Brian Chase, Chris Jensen and Peter Prieto Fermilab Accelerator Advisory Committee.
Klystron Modulator for Proton Driver
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
Fermilab High Intensity Neutrino Source R&D Program - Mission, Status, Plans, and Support Needs - For AD Department Heads March 2007 Bob Webber.
1 LCWS10 Beijing S1 Global RF Prep (S. Fukuda) 29/3/ S1-Global RF Preparation KEK S. Fukuda Content Time Schedule of S1 Global in KEK Achieving Goal.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Anders Sunesson RF Group ESS Accelerator Division
Power Supply System for DRFS
Modulator and overmoded RF components status for the 12GHz Test Stand at CERN - RF meeting – 17/03/2010.
13 th April 2007FFAG 07 Carl Beard EMMA RF System Carl Beard, Emma Wooldridge, Peter McIntosh, Peter Corlett, Andy Moss, James Rogers, Joe Orrett ASTeC,
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
Proton Driver Main Linac Parameter Optimization G. W. Foster Proton Driver General Meeting Jan 19, 2005.
Linac RF Source Recommendations for Items 22,23,24,46,47 Chris Adolphsen.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
RF scheme of electron linear accelerator with energy MeV Levichev A.E. Budker Institute of Nuclear Physics SB RAS.
ESS RF System Design Stephen Molloy RF Group ESS Accelerator Division SLHiPP2 4-May-2012.
Fermilab Proton Driver Project Weiren Chou for Bill Foster Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim,
Jan 12, 2005G.W.Foster - Proton Driver General Meeting Proton Driver General Meeting Kick-off Presentation G. W. Foster PD General Weekly Meeting Jan 12,
S. FUKUDA LCPAC RF-Systems for STF S. Fukuda Accelerator Laboratory Content Introduction Status of STF and Plan forFY2006 LLRF Summary.
ALBA RF Amplifiers based on IOTs CWRF08 - CERN, March 2008 Michel Langlois & Paco Sanchez 1 Michel Langlois & Paco Sanchez.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
June 3, 2004G.W.Foster - Proton Driver Proton Driver Project Development, Tactics & Strategy G. W. Foster Fermilab User’s Meeting June 3, 2004.
Krzysztof Czuba1 REFERENCE FREQUENCY DISTRIBUTION SYSTEM FOR THE TESLA TECHNOLOGY BASED PROJECTS Krzysztof Czuba Matthias Felber.
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
SPL waveguide distribution system Components, configurations, potential problems D. Valuch, E. Ciapala, O. Brunner CERN AB/RF SPL collaboration meeting.
650 MHz Solid State RF Power development at RRCAT
Power Supply Design Howie Pfeffer Mu2e Extinction Technical Design Review 2 November 2015.
SLAC Project-X RF Development FY12 SOW March
IIFC Meeting February 24-25, 2015, RRCAT P. R. Hannurkar, Akhilesh Jain, M. R. Lad RF Systems Division 650 MHz RF Power 1.
New prototype modulator for the European XFEL Project (DESY) Pulse Step Modulator (PSM) Technology for long pulse applications.
Project X High Power 325 MHz RF Distribution and Control Alfred Moretti, Nov 12, 2007 Project X Workshop.
Booster High Power RF at PIP-II Era John Reid February 18, 2014.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
Linac RF System Design Options Y. Kang RAD/SNS/NScD/ORNL Project – X Collaboration Meeting April , 2011.
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
Areal RF Station A. Vardanyan
KEK Marx-Modulator R&D
High efficiency work and MBK development for accelerators
A frequency choice for the SPL machine: Impact on hardware
Chris Adolphsen Sergei Nagaitsev
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
12 GHz High Power RF components requirements for CEA activities
Klystron Power Supplies for ILC
CEPC RF Power Sources System
LINAC PROTON SOURCE MODULATORS
Presentation transcript:

RF Power R&D David Wildman May10, 2005 Slides “borrowed” from: G. W. Foster, A. Moretti, D. Sun, I. Terechkine, D.Wildman,& D. Wolff

Fermilab May 10, 2005 wildman - AAC Meeting2 Outline System Overview 325 MHz Klystron Modulator for Klystron I/Q Modulators Phase Shifters (3 Types) Conclusions

325 MHz RF System

Fermilab May 10, 2005 wildman - AAC Meeting4 Tube is designed for particle Accelerators. Tube tunable to 325 MHz: Tube is in production for J-Parc; 17 tubes have recently been delivered to J-Parc. Power Output = 3.0 MW Gain = 50 dB Efficiency = 55 % Duty Factor = 2.6% Toshiba E374A High Power Amplifier Klystron Toshiba factory test at 1.5 ms 4.5 ms test done at Fermilab

Fermilab May 10, 2005 wildman - AAC Meeting5 Klystron Status Negotiations are in the final stages for the purchase of one 325 MHz klystron from Toshiba. Toshiba is quoting a delivery date of March 2006.

Fermilab May 10, 2005 wildman - AAC Meeting6 Proton Driver Modulator Requirements Purpose: Provide the pulsed power needed for Klystron operation Specifications –Pulse width:4.5ms –Pulse Voltage:120kV –Pulse Current:140amps –Repetition rate:2.5Hz –Average Power225kW –Support operation for both MBK and TOSHIBA 325 MHz klystrons –Allow cost effective redeployment to 1.5ms operation

Fermilab May 10, 2005 wildman - AAC Meeting7 Fermi-built TESLA Modulator 3 Modulators built in 1990s Specifications(PD) –Pulse width:1.7ms(4.5) –Pulse Voltage:120kV –Pulse Current:130amps(140) –Repetition rate:10Hz(2.5) –Average Power300kW(225) First modulator has run for 25,000 hours (since 1993) Second and third modulators have run for 18,000 hours each (since 1996)

Fermilab May 10, 2005 wildman - AAC Meeting8 Modifications to Fermi Modulator for PD Changes needed to meet spec –3x larger cap bank –3x larger “Bouncer” Circuit –3x larger pulse transformer Changes to reduce cost –Traction type capacitors Used extensively in Europe and SNS modulators –1.6kV IGBTs replace with 3.3kV units (SLAC collaboration) –Back-up switch plus fast crowbar replaced with redundant, fail- safe switch. –Updated controls

Fermilab May 10, 2005 wildman - AAC Meeting9 4.5 ms Modulator Simplified Diagram

Fermilab May 10, 2005 wildman - AAC Meeting10 Modulator Construction Schedule EE Support is in the process of building 2 modulators for SMTF. Requisitions for capacitors and pulse transformers have been awarded. The first unit should be finished by the end of this year.

Fermilab May 10, 2005 wildman - AAC Meeting11 CAUTION We are now going from one type of modulator to another!

Fermilab May 10, 2005 wildman - AAC Meeting12 I/Q modulator box (stripline structure) Box size: 24” x 20”

Fermilab May 10, 2005 wildman - AAC Meeting MHz I/Q Modulator Specifications Power (peak/average, duty factor 1.5%) –40 kW/ 600 W – kW/ kW –650 kW/9.75 kW (1 feed option for RFQ) Tuning Range –Phase: +/- 45 degree –Amplitude: +/- 1.5 dB Phase Tuner Slew Rate –1 degree/1  sec

Fermilab May 10, 2005 wildman - AAC Meeting MHz I/Q Modulator R&D Program Determine what type of rf structure (stripline, coaxial or waveguide) should be used for each power level. Demonstrate fast tuning capability. Solve potential technical issues: rf breakdown, cooling, and ferrite stability. Simplify assembly and cost reduction. Goal: to be ready when klystron arrives.

Fermilab May 10, 2005 wildman - AAC Meeting MHz I/Q Modulator The Plan –Low power level (40 kW) Use stripline structure to build a joined hybrid and circulator into one box with 4 coaxial ports. Power test this device with coaxial phase shifter at Argonne. –Medium power (150 kW) Power test a coaxial structure –High power level (650 kW) This is a special case. First evaluate the number of rf feeds for RFQ to determine the power level Then choose structure: either waveguide (magic tee) or coax

Fermilab May 10, 2005 wildman - AAC Meeting MHz I/Q Modulator Status –Low power level (40 kW) –Preliminary design of circulator and hybrid (circuit simulation and 3D E-M simulation) is done. –A prototype circulator using available ferrite disks is built and measured: achieved low insertion loss (-0.06 dB) and high isolation (-27 dB) –Received new ferrite disks to adjust the frequency of the circulator.

Fermilab May 10, 2005 wildman - AAC Meeting17 Prototype Circulator

Fermilab May 10, 2005 wildman - AAC Meeting18 Approaching the Phase Shifter Problem 1.Develop and test waveguide-based phase shifter; 2.Test the coaxial phase shifter available at FNAL 3.Work with a vendor to build an I/Q modulator

Fermilab May 10, 2005 wildman - AAC Meeting19 Amplitude and Phase (IQ) Modulator  = (  1+  2)/2  = (  2-  1)/2 11 22 Yttrium Iron Garnet Ferrite Shifters can be built based on: Coaxial line, Strip-line, Waveguide

Fermilab May 10, 2005 wildman - AAC Meeting20 Performance Requirements Frequency: 1300 MHz ± 1 MHz Phase Change: ± 45° RF Power Ratings: 550 kW Peak, 1.5 ms, 10 Hz 550 kW Peak, 4.5 ms, 3.3 Hz Insertion Loss: less than 0.2 dB Response time: time constant ~ 30  s Flange: WR-650

Fermilab May 10, 2005 wildman - AAC Meeting21 Waveguide Phase Shifter Main design issues: High power operation Heat management Tuning range Response time Core Coil

Fermilab May 10, 2005 wildman - AAC Meeting22 Phase Shifter Mockup Low Level RF Measurements Results of the low level RF measurements are in a good agreement with modeling (HFSS)

Fermilab May 10, 2005 wildman - AAC Meeting23 High Power Test A MHz Klystron T = 250 µsec F = 5 Hz Existing A0 interface was used for testing

Fermilab May 10, 2005 wildman - AAC Meeting24 High Power Test at 1300 MHz Two methods of phase measurements: 1.Oscilloscope measurements 2.Using available IQ modulator Available phase zone is limited by sparking that develops near the resonance frequencies Max Power kW (req. 600 kW) Phase shift - ~ 80° (req. 90° ) SF 6 added

Fermilab May 10, 2005 wildman - AAC Meeting25 Why Choose a Coaxial Design? Usable over a wide frequency range –Unlike waveguide has no cutoff frequency –Same shifter could be used at both 325 MHz and1300 MHz Easy to understand- TEM modes Compact : smaller size is generally good but leads to higher fields Modified 3 1/8” coax line, fully filled with aluminum doped yttrium-iron garnet

Fermilab May 10, 2005 wildman - AAC Meeting26 Phase Shift & Transmission S11 measurement of 10 TCI cores 325 MHzPhase 325 MHz

Fermilab May 10, 2005 wildman - AAC Meeting27 Fast Response of MHz - 5 cores Bias Current 100A/Div Phase Shift ~15 Deg/Div

Fermilab May 10, 2005 wildman - AAC Meeting28 High Power 1300 MHz

Fermilab May 10, 2005 wildman - AAC Meeting29 Phase Shift During 352MHz, 100kW Pulse Phase Shift from mixer Forward Power

Fermilab May 10, 2005 wildman - AAC Meeting30 Coaxial Phase Shifter Coax design is preferred at 325MHz In-house design tested to 660kW at 1300 MHz Tested at 300 kW at Argonne with APS 352MHz Klystron Fast coil and flux return should respond in ~50us

Fermilab May 10, 2005 wildman - AAC Meeting31 Advanced Ferrite Technology GmbH (AFT) Products: High Power Circulators Fast Ferrite Tuner Fast High Power Phase Shifter Hybrid Tuner Systems Ferrite Material Electrical Power Supplies for high power inductive loads The IQ modulator from AFT is expected in May: 1 Magic Tee; 1 straight waveguide section; 2 waveguide - coax transition; 2 FFT´s directly connecting to the transition; 1 control unit for setting phase and amplitude and feedback loop; 1 dual directional coupler for amplitude control; 1 arc detection system. Power supply will be provided by FNAL

Fermilab May 10, 2005 wildman - AAC Meeting32 Phase Shifter Conclusions 1.The prototype of a waveguide-based, 1.3 GHz phase shifter shows excellent maximal power and acceptable phase shift performance. 2.Coaxial phase shifter meets peak power and phase shift requirements both at 1300 MHz and 325 MHz. 3.Commercial prototype of an I/Q modulator due this month. 4.Average power testing, reaction time testing, and IQ modulator modeling should be the next steps of the R&D

Fermilab May 10, 2005 wildman - AAC Meeting33 General Conclusions We’ve made a good start on our R&D program We still have a lot of work to do before the Toshiba klystron arrives next March.