A seminar On Validation Of Ampoule Filling & Sealing Machine

Slides:



Advertisements
Similar presentations
Supplementary Training modules on Good Manufacturing Practices
Advertisements

World Health Organization
Radiopharmaceutical Production
WHO - PSM Water –part 3 Workshop on GMP and Quality Assurance of HIV products Shanghai, China 28 Feb - 4 March 2005 Maija Hietava M.Sci.Pharm Quality Assurance.
ISO 9001:2000 Documentation Requirements
World Health Organization
EQUIPMENT VALIDATION.
Overview of Validation Requirements Pharmaceutical Industry
Regulatory Compliant Performance Improvement for Pharmaceutical Plants AIChE New Jersey Section 01/13/2004 Murugan Govindasamy Pfizer Inc.
A Seminar on 1.  Validation vs Qualification  Why to validate?  Who should do Equipment Validation?  Parts of Equipment Validation  Validation of.
World Health Organization
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
Quality control of raw materials In-process control
Supplementary Training Modules on Good Manufacturing Practice
Quality Assurance/Quality Control Policy
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
ISO 9000 Certification ISO 9001 and ISO
Water | Slide 1 of 16 January 2006 Water for Pharmaceutical Use Part 4: Commissioning, Qualification and validation Supplementary Training Modules on Good.
Validation SAPRAA March 2013.
World Health Organization
WHO Supplementary Training Modules GMP
A Seminar On Validation Master Plan(VMP) & Calibration Master Plan(CMP)
Qualification of HVAC systems
MCC PRESENTATION - GMP MANUFACTURING ENVIRONMENTS
Radiopharmaceutical Production
EQUIPMENT QUALIFICATION/VALIDATION
A Seminar on 1.  Why to validate?  Parts of Equipment Validation  Who should do Equipment Validation?  Equipment qualification  Typical process flow.
World Health Organization
BRC Food Safety Quality Management System Training Guide
World Health Organization
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Basic Principles of GMP
Introduction to Software Quality Assurance (SQA)
Rocky Mountain RAPS Process Validation Presentation 6/7/06 By Clay Anselmo.
© 2011 Michigan State University and United Nations Industrial Development Organization, original at CC-BY-SA Procedures FSKN.
VALIDATION METHODOLOGY
1 Importance of Instrument Validation for Accredited Food Export Testing Labs.
Water | Slide 1 of Water for Pharmaceutical Use Part 3: Operational considerations Supplementary Training Modules on Good Manufacturing Practice.
Equipment Management Audience – Local lab responsibilities.
Module 1, Part 3: Process validation Slide 1 of 22 © WHO – EDM – 12/2001 Validation Part 3: Process validation Supplementary Training Modules on Good Manufacturing.
Module 1,, Part 5: Review and summary Slide 1 of 13 © WHO – EDM Validation Part 5: Review and summary Supplementary Training Modules on Good Manufacturing.
 Definition of a quality Audit  Types of audit  Qualifications of quality auditors  The audit process.
Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.
VALIDATIONS: TOWARDS RELAIBLE QUALITY OUTCOMES DR. SHIVPRAKASH MANAGING DIRECTOR SYNCHRON RESEARCH SERVICES PVT. LTD., INDIA.
MANUFACTURING AND PRODUCTION OF BIOLOGICAL PRODUCTS (ERT 455)
Module 4Slide 1 of 23 WHO - EDM Validation Basic Principles of GMP.
The world leader in serving science Validation and Qualification Overview Mike Garry Software Product Manager Spectroscopy Software Platform Team.
Sterile product validation
PHARMACEUTICAL EQUIPMENT
1 A Seminar On Pharmaceutical Outsourcing A Seminar On Pharmaceutical Outsourcing.
Pharmaceutical Quality Control & current Good Manufacturing Practice
AIQ Analytical Instrument Qualification. AIQ – Analytical Instrument Qualification Varian, Inc.’s Analytical Instrument Qualification documentation has.
ERT 421 Good Manufacturing Practice for Bioprocess Engineering Test 1: answer scheme.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
1. Our Presentation Topic: Importance Of Validation & Qualification In Pharmaceutical Industries Presented By: Md. Tanjir Islam (Group C) 2.
World Health Organization
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
World Health Organization
World Health Organization
Pharmaceutical Quality Control & current Good Manufacturing Practice
Author: Nurul Azyyati Sabri
Water for Pharmaceutical Use
Instrument Maintenance
Computer System Validation
From AS :   Part 4— Commissioning, operation and asset management
World Health Organization
PSS verification and validation
Radiopharmaceutical Production
Presentation transcript:

A seminar On Validation Of Ampoule Filling & Sealing Machine Department Of Quality Assurance Maliba Pharmacy College 19 April 2017

Introduction Validation may be defined as, “The documented act of demonstrating that any procedure, process, and activity will consistently lead to the expected results which includes the qualification of systems and equipment” 19 April 2017

The equipment validation process generally covers following steps.. Continued…. The equipment validation process generally covers following steps.. User Requirement Specification (URS) Preparation of Design Qualification (DQ) Installation Qualification (IQ) Operational Qualification (OQ) Performance Qualification (PQ) 19 April 2017

Stages of Qualification

The previous figure depicts the most commonly used approach to the qualification process as used in the pharmaceutical industry It shows a pyramid, which is the best way in which to plan a qualification/validation project Investing more time in the first phases will save time and money in later and critical phases 19 April 2017

Who should do Equipment Validation? The vendor or the user ? User has the ultimate responsibility for the accuracy of the analysis results and also for equipment qualification DQ should always be done by the user While IQ for a small and low cost instrument is usually done by the user, IQ for large, complex and high cost instruments should be done by the vendor OQ can be done by either the user or the vendor PQ should always be done by the user because it is very application specific, and the vendor may not be familiar with these PQ should be done on a daily basis 19 April 2017

Validation of Ampoule Filling & Sealing Machine 19 April 2017

19 April 2017

19 April 2017

Validation Protocol The entire process of equipment validation is designed in the form of certain documented formats or protocols This helps in systematizing the study of equipment validation A validation protocol prepared by engineer or validation specialist The protocol sections contain required procedures and forms 19 April 2017

Each protocol package is divided into three section: Continued…. The procedure describe “how” the system is to be validated, while the forms document these procedure and provide a written record of the performed qualification and validation processes Each protocol package is divided into three section: Installation qualification (IQ) Operational Qualification (OQ) Performance Qualification (PQ) 19 April 2017

User Requirement Specification The user of the equipment has certain requirement about the equipment which he wants to use Some of the general requirements may be stated in the form of certain parameters like… Size of equipment Speed of equipment Availability of spares, change part, immediate service at reasonable cost 19 April 2017

Continued…. Low sound generation Lesser breakdowns Materials of construction Auto control system This requirements are generally discussed with the suppliers and based on this discussion the selection of the equipment is done 19 April 2017

The size of delivery tube depend on .. Continued…. For example, In ampoule filling machine, a delivery tube provided for repetitively forcing a measured volume of liquid through the orifice of delivery tube designed to enter the constricted opening of container The size of delivery tube depend on .. the opening of container the viscosity & density of liquid speed of delivery desired 19 April 2017

Preparation of D.Q. and its Certification If we are going to purchase an standard equipment then the preparation of D.Q. dose not become very important because we are accepting the manufacturer's design as it is However, if a particular equipment is to be fabricated as per our requirements then the detailed D.Q. document become very important and essential 19 April 2017

Continued…. It is advisable to work out the detailed equipment specifications by sitting together with the equipment manufacturer It may also be advisable to perform Factory Acceptance Test (FAT) at the manufacturer’s premises before dispatch of the equipment to the purchaser 19 April 2017

Installation Qualification “Installation qualification establishes that the instrument is received as designed and specified, that it is properly installed in the selected environment, and that this environment is suitable for the operation and use of the instrument” 19 April 2017

The qualification involves, Continued…. The qualification involves, Verification of approved purchase order Verification of invoice Check manufacturer and supplier Verification of model number and serial number Checking for any physical damage Confirm location and installation requirements as per recommendation of manufacturers Verify that the utilities required are available Installation shall be conducted as per instructions provided in the manual 19 April 2017

Ensure all relevant documentation is received like, Continued…. Ensure all relevant documentation is received like, User manual Maintenance manual List of change parts Electrical drawings 19 April 2017

Operational Qualification O.Q. is verification of performance of the system without load O.Q. section details the tests to be performed on the equipment to document that it operates correctly O.Q. involve, Verification of alarm control Perform calibration requirements identified in the manual or established by the validation team Operate the equipment at low, medium, and high speed as per operations manual to verify the operating control Verify that all switches and push buttons are functioning properly Establish procedures (SOP) for operation, maintenance, and calibration Establish training program for relevant staff 19 April 2017

Performance Qualification P.Q. is verification of performance of system with load Filling studies will be run on all containers and fill levels The containers will be filled in triplicate runs If a placebo is used, it should have similar physical characteristics (viscosity, density, foaming) to the actual fill materials The study should be run at minimum, maximum and intermittent speeds (in terms of ampoules/minute) The filler must handle the containers without damage and without jams Accuracy and precision must meet specifications 19 April 2017

P.Q. of ampoule filling and sealing machine involve, Wight variation test Filling volume accuracy Particle Contamination Leaker test Oxygen content 19 April 2017

Weight variation test : In the absence of specific criteria, weight variation must conform to USP In summary, all 10 units must be within 85.0 to 115.0% of target content, with a %RSD ≤ 6.0%, or not more than 1 of the 30 units outside of the 85.0 to 115.0% and no units outside of 75.0 to 125.0%, with a %RSD ≤ 7.8% 19 April 2017

Filling Volume Accuracy: Continued….. Filling Volume Accuracy: The filling accuracy should be within ±% of the adjusted and desired filling volume in accordance with the machine specification. eg. Attention limit: ±1% Action limit: ±2% 19 April 2017

Particle Contamination of Ampoules during Filling & Sealing Procedure: Continued…. Particle Contamination of Ampoules during Filling & Sealing Procedure: Ampoules should be filled with water for injection and afterward be inspected on the contamination with particles (particle classes: ≤10 μm and ≤25 μm). The inspection can be performed with a particle counter. 19 April 2017

Continued…. Leaker test: Should capillary pore or tiny cracks be present, micro-organisms or other contaminants may enter the ampoule, or the content may leak outside. Leaker usually detected by submerged ampoule in a deeply colored dye solution (usually 0.5 to 1.0% methylene blue). Limitation is that capillaries of about less than 15 um not detected by this method. 19 April 2017

Continued…. Oxygen content, If the filler produces a nitrogen purge, the headspace gas should be analyzed for oxygen content 19 April 2017

Requalification Requalification of systems and equipment should be done in accordance with a defined schedule The frequency of requalification may be determined on the basis of factors such as the analysis of results relating to calibration, verification and maintenance There should be requalification after changes The extent of requalification after the change should be justified based on a risk-assessment of the change 19 April 2017

References... R. A. Nash & A. H. Wachter, “Pharmaceutical process validation”; Third edition Leon Lachman, H. A. Lieberman & J. L. Kanig, “The Theory and Practice of Industrial Pharmacy”; Third edition, Pg. No. - 667 to 674 Manohar A. Potdar, “Pharmaceutical Quality Assurance”, Pg. No.- 8.13, 8.14 Syed Imtiaz Haider, “Validation Standard Operating Procedure”, Pg. No. - 304 to 307 Syed Imtiaz Haider, “Pharmaceutical Master Validation Plan”, Pg. No. – 140 http://www.validationworld.com/ 19 April 2017

THANK YOU…. 19 April 2017