January 25, 2003Richard Talaga1 High Voltage Distribution for RPCs Simple Model of Detector & HV Specifications & Requirements Simple HV Distribution Layout.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
NetSure™ RDB Series.
Assembling a Functional Multi-Wire Proportional Counter - Page 1 Work in pairs. One person will take the chamber apart, and the other will reassemble it.
1Daya Bay RPC HV FDR 6/17/2008 RPC HV cable pick-up noise issue C. Lu, Princeton University (6/17/2008)
04/02/2004 az Outer Tracker Distribution Boxes 1 EFNI H K Outer Tracker Distribution Boxes Ad Berkien Tom Sluijk Albert Zwart.
D. Peterson, “The Cornell/Purdue TPC”, LCWS05, Stanford, 21-March The Cornell/Purdue TPC Information available at the web site:
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
1 RPC HV cable pick-up noise issue C. Lu, Princeton University (10/26/2008) I pulled out some slides from my old DocDB files (DocDB#2209 and #406), and.
IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University High Voltage Requirements Commercial Solutions Custom Solutions.
Chamber PCB s, FEB s, Cooling, HV/LV Distribution 1)PCB designs-track widths, track to track distances … 2) Double sided and Multi layer, modular approach.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
Nick Arnal, Jason Entenmann, Chris Thompson Dr. Gokhan Mucmu URL: Test Fixture to Characterize Elastomeric.
ZTF Interconnecting Scheme Stephen Kaye
TF Joint Voltage Drop Instrumentation Robert Marsala (609) Hans Schneider (609) Engineering Operations August 7, 2003 TF_JOINT_Final_Design_Review.ppt.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
1 HV Bias Power Patch Panel for Scintillator KLM Gerard Visser Xiaowen Shi overview Schematics layout Parts.
C. Bromberg 1 Michigan State University Feb. 8, 2004 RPC Monolithic Detector l Most absorber shipped direct to the site äShipping minimized äHeavy (~20.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
FETS Ion Source Installation progress UKNF Meeting Trinity College, September Dan Faircloth, Scott Lawrie, Alan Letchford, Christoph Gabor,
Tray Factory Considerations Jean-Francois Genat UC LAPD Collaboration Meeting, June th 2010, Argonne. 1.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
ALICE DCS Workshop 28/29 May 2001 Vito Manzari, INFN Bari SSD (Silicon Strip Detector) SDD (Silicon Drift Detector) SPD (Silicon Pixel Detector) Detector.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
RPC (Barrel) Cabling summary. Signal cable specifications Signal Cables (two possibilities): –Loose pair round and twisted pairs (with flat zone for crimping.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
The Alice-ToF HV system and the PVSS control system E. Scapparone for the Alice-Tof group DCS Workshop, June 16 - The ToF High Voltage layout ; - Component.
HV-Splitter for RENO Project S. Stepanyan, 김우영 경북대학교 Y.Kim Sejong University May-2008.
Update on SBS Back Tracker UVa K. Gnanvo, N. Liyanage, V Nelyubin, K. Saenboonruang, Seth Saher, Nikolai Pillip (visiting from Univ. Tel Aviv, Israel)
BKLM RPC Signal & Ground Schematic Gerard Visser, Indiana University (for the barrel KLM team) 10th B2GM, 11/2011 magnet structure GND 7mm FOAM 3mm GLASS.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
January 15, 2003Richard Talaga1 High Voltage Distribution for RPCs Simple Model of Detector & HV Specifications & Requirements Simple HV Distribution Layout.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
Front End Board (16 channels) Superlayer Cross Section Frontend Enclosure HV cap board HV cap Board Signals from chamber wires go to HV cap board to be.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Design of High Voltage System Kyungju Ma & Reno Collaboratiors
1 VELO integration INTEGRATION, december 05 OUTLOOK : - PARTS - 3D MODEL - LV & HV CABINETS INTEGRATION - LV CABLING - RPT CABLING.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
1 LAPPD Team meeting 6/10/2010 Ossy Siegmund, Experimental Astrophysics Group, Space Sciences Laboratory, U. California at Berkeley Integration of Front-End.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Mauro Citterio Milano, PP2/Services - an update - Mauro Citterio INFN Milano Type II cables  Layout in progress  Duplication of VVDC wires.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Faculty of Physics, University of Belgrade Collaboration board meeting 31 th of January, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
High Voltage Power Supply for RPC Suvendu Nath Bose, Satyajit Saha, Sudeb Bhattacharya, Saha Institute of Nuclear Physics, Kolkata,, Description Presently.
Belle-II bKLM RPC Readout Power & Ground Discussion 12 th Belle II General Meeting Gerard Visser Indiana University CEEM 7/24/2012.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
T1 Electronic status Conclusions Electronics Cards:
HPS Motherboard Electronic Design
Chamber Design and Integration RE3/1 and RE4/1
First of all we will remind some numbers:
Cosmic Ray Tracker and Detector Control System at the GIF++
Overview of T1 detector T1 is composed by 2 arms
Performance of a Multigap RPC prototype for the LHCb Muon System
HCAL HV splice box.
Resistive Plate Chambers performance with Cosmic Rays
RPC Electronics Overall system diagram Current status At detector
Limited Streamer Tube Project Summary
Presentation transcript:

January 25, 2003Richard Talaga1 High Voltage Distribution for RPCs Simple Model of Detector & HV Specifications & Requirements Simple HV Distribution Layout Parts & Costs for Simple Model Alternative Implementations +HV to Anode and – HV to Cathode C-W supplies

January 25, 2003Richard Talaga2 Simple Model of Detector & HV Detector –300 repetitive layers –20m x 20m cross section –2m x 2m per RPC  100 RPCs per layer HV –Operating Voltage: ~ 8 kV for ~2mm gap –1µA/m 2 dark current (BELLE result) mostly through noryl spacers up to ~ 5µA/m 2 if there are problems …(HV drop limits the current) –  400 µA per layer with properly-operating RPCs –Typical commercial HV channel provides –HV System: 1ch/layer  300 channels for entire detector 1HV channel/100 RPCs; 1 current measurement for an “entire layer”

January 25, 2003Richard Talaga3 Specifications & Requirements HV distribution: 1 HV channel “per layer” –Ability to turn on/off Any one RPC?  No daisy chains “Simple Layout” Any of one cluster of RPCs ?  Limited daisy chains –Ability to provide more than 1 value of HV per plane Could accommodate two different HV/plane. “Less Simple” –Ability to track down bad RPC (high current) Current meters per RPC or cluster of RPCs could be a big help. “Less Simple”

January 25, 2003Richard Talaga4 Simple HV Distribution Layout 100 RPC/layer Here each HV channel serves 2 “1/2 layers” Assume 100 RPC connections to the outside Four HV distribution boxes per layer (25 ch/box) –100 pairs of HV connectors/layer + 8 pairs for boxes –240m of cables per quadrant  960 m/layer HV Channel Distribution box Detector cross section

January 25, 2003Richard Talaga5 Parts and Costs: Simple Model HV System: CAEN SY1527 (replaces SY 127) $332k –Module A1526: 6 HV 1mA/15kV per ch 50 modules  300 channels (1 per layer)$250k –Crate SY1527: fits 8 Modules A crates (6 full & 1 with two modules) $82k RG58 cable –960m/layer x 300 layers =288,000m = 950,000 ft $136/1000ft spool  $129k SHV connectors: one pair per RPC –RPC end is soldered 30,000 RPCs x $23/pair (for qty of 100) $690k Distribution boxes 1200 ~$100/box (no fanout connectors)$120k 10 kV connectors to PS 300 x $35 $10k Total HV M&S costs$1.3M

January 25, 2003Richard Talaga6 Parts and Costs: Notes CAEN HV modules –10 kV are being discontinued: SY 127 model A328 ($1,400/channel) –15 kV model A1526 may be built to provide 10 kV with increased current ~1.3 mA and less potent HV connectors Note: $830/channel for standard model Connector cost –10kV connectors cost $70/pair $36 for bulkhead; $34 for cable –8kV SHV connectors cost $23/pair $9 for bulkhead; $14 cable SHV connector cost may be less because quote for qty 100 Attaching SHV connectors to cables –Assumed no cost in the estimate

January 25, 2003Richard Talaga7 “Less Simple”: Choice of 2 Values of HV per Layer HV Channel (high) Layers 1-4 HV Channel (low) Layers 1-4 Repeated pattern of higher/lower HV distribution boxes (On left and right sides of detector)

January 25, 2003Richard Talaga8 Alternative: +HV to anode and – HV to cathode Advantages (as in the BELLE experiment) –“Reduces the potential to ground on connectors, cables and surfaces as a precaution against external discharges through and around insulators” –“Helps reduce the overall HV system cost since modules capable of producing voltages in excess of 7.5 kV are less common and therefore more costly” Available CAEN SY1527 hardware CAEN A1732(N/P) $3,980/12ch  $246k system CAEN A1733(N/P) $3,825/12ch  $123k system Compare: A1549 $5,045/6ch  $332k system –Note: Save on HV supplies but double the number of HV connectors, distribution boxes and cables

January 25, 2003Richard Talaga9 Alternative: Cockroft-Walton Supplies * Each RPC can have its own C-W supply, mounted nearby One low voltage cable replaces HV cable & connectors Safer: No HV outside the detector C-W board: part of RPC “package”; no HV connectors –Can be potted to reduce corona discharge –Can be shielded to reduce rf radiation Individual RPC HV control possible “Less Simple” Individual RPC current monitor possible “Less Simple” Cost compared to $1.3M conventional system – $40/channel seems possible $40/ch x 30,000 ch = $1.2M Note: $40/ch is for a “Simple System”; Individual RPC controls/monitors will cost more but are a “natural extension” of the C- W system * Used in

January 25, 2003Richard Talaga10 Block Diagram of +/- 4kV C-W Supply + 4 kV - 4kV OSC AMP ~ Current V-mon V-ref C-W

January 25, 2003Richard Talaga11 Summary “Simple” HV system will cost ~ $1.3M –labor costs for terminating connectors not included Largest cost is for HV connectors Several enhancements to “simple” scheme are probably desirable –RPC current monitoring is important –Positive & Negative Voltage reduces potential to ground Cockroft-Walton HV system has advantages (adjustable voltage and current monitoring). This could be an interesting R&D project