IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University High Voltage Requirements Commercial Solutions Custom Solutions.

Slides:



Advertisements
Similar presentations
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Advertisements

Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
OSU meeting, 04/24/2003 Richard Kass1 Limited Streamer Tube Project Overview Richard Kass Ohio State University Introduction (why, who, what….) The big.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Daya Bay RPC Gas System: Design Report & Budget Estimate Changguo Lu, Kirk McDonald Princeton.
Anthony AffolderUS CMS Meeting 12/3/02DAQ Based Systems LV/HV Needs DAQ Power Supply Needs HV à 600 V/~1mA range –0.1-1  A Current Sensing –Over Voltage/Current.
Vegard Joa Moseng BI - BL Student meeting Reliability analysis summary for the BLEDP.
January 25, 2003Richard Talaga1 High Voltage Distribution for RPCs Simple Model of Detector & HV Specifications & Requirements Simple HV Distribution Layout.
BaBar/LST Meeting Dec 8, 2003K. Honscheid, Ohio State University Module Assembly Quality Control High Voltage Ohio State Status Report.
Tullio Grassi ATLAS–CMS Power Working Group 31 March 2010 DC-DC converters and Power Supplies requirements for CMS HCAL Phase 1 Upgrade.
Panda PCB for prototype status report by D Malkevich on behalf of the ITEP group ITEP.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
Kyle Merkert ECE 791/792 Senior Design Project October 2009 – May 2010 Faculty Advisor: Dr. Wayne Smith.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
DCS TCSG November 10th 1999, H.J.Burckhart1 Status of the general purpose I/O system LMB u DCS Architecture u LMB u Local Monitor Box (LMB) u Concept u.
RPC Cosmic Rays Test in Naples Paolo Iengo Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M. Caprio, G. Carlino,R. de Asmundis, M. Della Pietra, D. della.
CAEN November 15, 2002 Vandelli W. 1 Test Conditions Prototype fed by CAEN Module 2527 through 100 m long cables From channels status page on generator.
Development and Performance of the High Voltage Distribution System for the ALICE TRD A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis,
RPC STATUS AT PANJAB UNIVERSITY Panjab University, Chandigarh India-CMS Meeting, 28 th July, 2011.
IEEE Nuclear Science Symposium October 27 th 2005 The BaBar LST detector High Voltage system Design and implementation Gabriele Benelli K.Honscheid, E.A.
LHCb F. Murtas Servizio elettronica G. Corradi D.Tagnani P.Ciambrone HV_GEM per LHCB M1R1 HV power supply Introduction Introduction HV_GEM Technical specification.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
QUPID Readout and Application in Future Noble Liquid Detectors Kevin Lung, UCLA TIPP 2011 June 11, 2011.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
FP420 Low voltage supply Henning E. Larsen, INFN and Risoe 19. May 2006.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
High Voltage 8- Channel Board [HV8CB] Vihtori Virta Design Review.
A. Ranieri / RPC-CMS Pre-loaded profile Synchronization & Control Board (SCB) The RPC electronics will consist of the FE board plus the Synchronization.
PHOTOMULTIPLIER HIGH VOLTAGE POWER SUPPLY SYSTEM FOR THE CMS FORWARD HADRON CALORIMETER Lubomir Dimitrov, Ivan Vankov Nuclear Electronics Laboratory, Institute.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
I. Vankov, NEC’2003, September ‘03, Varna HV PS System NEC’2003, September 03, VARNA CMS HCAL High Voltage Power Supply System Dimitrov L.(*), Kunov B.(*),
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
Gas Quality Checks Maria Luisa Porto Oriented by: Burkhard Schmidt 23/02/2009.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
Presentazione delle richieste immediate per l’upgrade di MEG (gruppo di Roma) Cecilia Voena Mar 15 th, 2013.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
Design summary Status of the development & production - test run with S3a and S3b prototype - performance tests To do list for production & development.
S.DusiniOPERA meeting, LNGS May 2003 Cosmic Test Status Reports Remind of test setup Status report Gas and HVOK Strips and ElectronicsOK DAQalmost.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
High Voltage Power Supply for RPC Suvendu Nath Bose, Satyajit Saha, Sudeb Bhattacharya, Saha Institute of Nuclear Physics, Kolkata,, Description Presently.
Novosibirsk, September, 2017
TOF Low Voltage and High Voltage Systems Vahe Ghazikhanian UCLA Department of Physics and Astronomy V. Ghazikhanian July 21, 2005.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
LKr status R. Fantechi.
BPMs in the new Dump Line
Beam Loss Monitors and Ion Chambers for protecting Hall Equipment Tommy Michaelides (SSG) Stay Treat 2016.
CMS EMU TRIGGER ELECTRONICS
Noise on chambers M1R4 N.Bondar
Electronics requirements for special diagnostics for the XFEL
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
Particle Detection System for MERIT
Use of Beam Loss Monitor type detectors in CNGS muon station
Single rate plateau curve with different gas mixture
Particle Detection System for MERIT
Limited Streamer Tube Project Summary
Quality Control Infrastructure
Presentation transcript:

IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University High Voltage Requirements Commercial Solutions Custom Solutions

IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University Requirements 2076 LST tubes 4152 High Voltage Channels Up to 5 kV –Regulated to 1% Current monitoring –nA resolution Over-current protection –Fine granularity (individual tubes)

IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University Voltage and Current Wide HV plateau (depending on gas mixture, chamber construction etc) fixed HV for all tubes Operating point depends on gas mixture (variations), pressure, temperature, tube- tube variation. Tube “conditioning” adjustable but tubes can still be grouped together with a common HV value Current Estimates for a typical 0.2 Hz/cm 2 expect 60nA per tube for a worst case rate of 2 Hz/cm 2 expect 640 nA

IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University Commercial Solutions CAEN 527 or similar –Too expensive CAEN 546 –4u crate, slots for 8 modules for a total of 96 ch –One HV setting per module –Individual channel current monitor –CAENET VME interface to slow control –Available from CAEN by special order Cost estimated to ~$160k for 1000 channels –Used by LVD experiment (Gran Sasso) 3000 channels might be available

IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University Over-current protection (ZEUS) LST Voltage 6 kV Limited streamer tube Voltage Current

IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University Custom Solution or HV channels for less than $200k OSU electronics engineers (Rush, Smith) designed a system similar to the CAEN 546 solution. single HV individual current monitor integrated protection “pizza box” design up to 50 ch in 1u stand-alone (no crate or crate controller required) Details at www-physics.mps.ohio-state.edu/~klaus/LST/HV/HV.htm

IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University Block Diagram

IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University Schematics (HV Regulator, Controller)

IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University Schematics II (HV Distribution Channel)

IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University First Prototype (5 ch) 6kV Dc/Dc HV Op-Amp 15 V In 0-5 kV Out Current Monitor Protection Floating 5V Supply Current Monitor Outputs

IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University Status, Summary and the Next Steps Commercial Solution –HV crate available at Padova, soon at OSU –Test CAEN 546 system from LVD –Integrate protection circuit (if necessary) Custom Solution –Status Test and prototype tested and fully operational Based on preliminary cost estimate channels can be build with our budget –Next Steps Complete digital part, integrate micro controller Test stability and reliability –Can be ready in time for module production and QA test stands –Need to decide if (and how far) OSU solution should be pursued …but it is hard to beat a “free” system Start system engineering (connectors, distribution…)