PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/2010 - LG.

Slides:



Advertisements
Similar presentations
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
Advertisements

LBNL PIXEL IPHC 2009_06_LG1 Flex Cable Development The development of the flex cable for sensor readout and control is envisioned as a 4 stage process.
STAR Pixel Detector Phase-1 testing. 22 Testing interrupted LBNL-IPHC 06/ LG Lena Weronika Szelezniak born on May 30, 2009 at 10:04 am weighing.
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
PXL RDO System Requirements And meeting goals 11/12/2009BNL_CD-1_SENSOR_RDO - LG1.
L. Greiner1HFT Hardware 09/23/2010 STAR Vertex-6 based PXL RDO board Design concept and items for discussion.
M.J. LeVine1STAR HFT meeting, Sept 27-28, 2011 STAR SSD readout upgrade M. LeVine, R. Scheetz -- BNL Ch. Renard, S. Bouvier -- Subatech J. Thomas -- LBNL.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR PXL Detector Project Status.
L. Greiner1SLAC Test Beam 03/17/2011 STAR LBNL Leo Greiner, Eric Anderssen, Howard Matis, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
LBNL Michal Szelezniak, Eric Anderssen, Leo Greiner, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Chinh Vu, Howard Wieman UTA Jerry Hoffman, Jo Schambach.
Research and Development for the HFT at STAR Leo Greiner BNL DAC 03/15/2006.
L. Greiner 1PXL BNL Safety Review– September 26, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
SSD Ritter Review June 20, 2012 The Silicon Strip Detector an overview and introduction Jim Thomas Lawrence Berkeley National Laboratory.
L. Greiner 1HFT PXL BNL FTF– September 27, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
The STAR HFT PXL system is designed to be inserted in situ. Is housed in 2 large frame aligned with rails inside Inner Detector Support. Inserted from.
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR PXL System Hardware Architecture.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
M. Szelezniak1PXL Sensor and RDO review – 06/23/2010 STAR Hardware Prototyping Status.
H. Wieman1STAR HFT CD1 Review, BNL, November 2009 STAR HFT PIXEL Detector WBS 1.2 Howard Wieman LBNL.
PXL Electronics Status update for HFT TC meeting on October 14, 2010 at BNL 1HFT TC 05/11/ LG.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
L. Greiner1IPHC-LBNL Phone Conference 05/2011 STAR IPHC-LBNL Phone Conference News and PXL sensor (Ultimate) testing at LBNL.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
MAPS based vertex detector at STAR Michal Szelezniak 1 on behalf of: E. Anderssen 1, X. Dong 1, L. Greiner 1, J. Kapitan 2,S. Margetis 3, H. Matis 1, H.G.
June 29th 2005Ph. BUSSON LLR Ecole polytechnique, Palaiseau1 Plans for a new TCC for the endcaps Characteristics: reminder Preliminary list of tasks and.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
PXL Cable Options LG 1HFT Hardware Meeting 02/11/2010.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR PXL Detector Sensor and RDO Review Introduction.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Michal Szelezniak – LBL-IPHC meeting – May 2007 Prototype HFT readout system Telescope prototype based on three Mimostar2 chips.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
Xiangming Sun1PXL Sensor and RDO review – 06/23/2010 STAR XIANGMING SUN LAWRENCE BERKELEY NATIONAL LAB Firmware and Software Architecture for PIXEL L.
HFT DOE Review July 17-18, 2012 The Silicon Strip Detector WBS 1.4 Jim Thomas Lawrence Berkeley National Laboratory SSD.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
L. Greiner 1St. Odile CMOS Workshop – September 6-9, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun,
MINERvA Status Report Deborah Harris, Gabe Perdue, Kevin McFarland, Jorge Morfin October 15, 2009.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
Leo Greiner IPHC1 STAR Vertex Detector Environment with Implications for Design and Testing.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
L. Greiner1IPHC-LBNL Phone Conference 07/10/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
.1PXL READOUT STAR PXL READOUT requirement and one solution Xiangming Sun.
IPHC-LBL-BNL video conference 19 Jan 2007 HFT development MimoStar2 based telescope.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Electronics Status New DCM daughter card works. –Three cards has been assembled. –One daughter card has been send to Jamie yesterday by FedEx overnight.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
LBNL Eric Anderssen, Leo Greiner, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak, Chinh Vu, Howard Wieman UTA Jerry Hoffman, Jo Schambach.
L. Greiner 1Project X Physics Study, Fermilab, June 18, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun,
1 PIXEL H. Wieman HFT CDO LBNL Feb topics  Pixel specifications and parameters  Pixel silicon  Pixel Readout uSTAR telescope tests 
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
The STAR Heavy Flavor Tracker PXL detector readout electronics
HFT Overview Flemming Videbæk BNL 3/14/12 F2F LBNL.
Leo Greiner, Eric Anderssen, Howard Matis,
Face to Face Meeting – March 2012 Sarah Morgan
Presentation transcript:

PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG

Outline FY10 Tasks Status of Tasks Schedule HFT TC 05/11/ LG2

PXL Milestones Plan “B” 2010-Q1 – Phase-2 sensors delivered to LBNL Q2 – Receive prototype final sensor Q2 – Install prototype detector at STAR Q4 – Receive production sensors Q4 – Install PXL detector. HFT TC 05/11/ LG3

FY10 Tasks PXL Cable development – Infrastructure testing board – Prototype detector cable FR-4 with Cu – Prototype detector cable Kapton with Cu Probe Testing – Phase-2 sensors RDO prototyping – Full ladder RDO Sensor and system development and testing – Beam test with Fermilab – Beam test preparation for Phase-2 sector at PHENIX? CD-2/3 HFT TC 05/11/ LG4

Probe testing Status We have a probe testing hardware design and testing plan here We have developed a sensor tracking and QA plan here We have designed and produced a probe card and mated it to a probe testing station HFT TC 05/11/ LG5

Probe testing Status We have tested 13 sensors (full thickness, individual diced sensors). Up to 3 probe tests per sensor. Results are very promising with caveats (next slide). Evaluation in progress  Mount first 3 tested sensors onto individual test boards. Test for function. – Results look mostly consistent for one sensor with some variation.  Interface a known good sensor on an individual test board to the probe card inputs. Check probe card function. – Also consistent. Automated scripts for testing are working. We will begin testing thinned sensors within the next 2 weeks. 2 nd Probe card has been sent out to have the probes mounted. HFT TC 05/11/ LG6

Probe testing Status HFT TC 05/11/ LG7 Poor vs better probe contacts (chip E8) Initial testing with ~75um travel past touchdown 30 um additional lowering of probe pins Very Preliminary with known problems

PXL Cable Development Status There is extensive documentation of our cable development and testing plan. A report was sent to DOE on 12/31/2009 as part of the CD-1 homework. Summary – Develop FR-4 based infrastructure test PCB. - DONE – Design FR-4 version of prototype real-size ladder PCB. – Translate design into Kapton PCB. This effort requires successful probe testing of sensors in order to be able to test full ladders of functional (Phase-2) sensors. This is actually a ladder level system test. The testing includes a complete chain of RDO system that has never been fully tested including the prototype MTB and prototype RDO Board. The full ladder signal paths are now being tested. HFT TC 05/11/ LG8

Ladder Test System HFT TC 05/11/ LG9 RDO motherboard Xilinx V-5 Dev Board MTB LU-protected power daughtercard Infrastructure test boardRDO PC

PXL Cable Development Status (ladder level system test) Infrastructure Testing Board HFT TC 05/11/ LG10 Status: 1 Board loaded with 10 Phase-2 sensors. JTAG daisy chain working – we can configure and read back. Multi-drop LVDS clock 160 MHz. Scripted testing is now working for individual sensors on the ladder. To do: Troubleshoot system. Test individual sensor baseline. Test with all sensors clocked. Analyze results. Repeat for different configurations.

Preliminary Testing Results HFT TC 05/11/ LG11 Probe tests vs ladder tests (chip C1) Probe tests ITB Very Preliminary with known problems

The complete data and configuration paths appear to be working. We have the firmware/software tools to troubleshoot both the infrastructure testing board and the probe testing systems. This work has begun – we will fix the existing problems and move to full infrastructure testing of sensor ladders. HFT TC 05/11/ LG12 PXL Cable Development Status (ladder level system test)

PXL Cable Development Status Cable design options HFT TC 05/11/ LG13 A detailed description of the challenge is available here We are attempting a “proof-of-principle” test before the CD-2/3 review. A single sided test cable design has been produced for fabrication at Datex to assess capability and quality. (quotation not yet received) Some delay due to material issues. It is difficult to find anyone willing to fabricate kapton/Al. We have located some 1 mil Al on 1 mil mylar and shipped it to Datex. They are evaluating the suitability. Datex will start first attempt at fabrication next week. Results will follow. Other vendors (SE SRTIIE, Kharkov,Ukraine and CERN?) will be contacted.

RDO Prototyping Status Prototype MTB and RDO boards are fabricated and under test in ladder system test. Architecture and Implementation documents are in progress due to be completed within 2 weeks. Full sector RDO (4 ladders) in data taking mode is in progress. Internal workshop/review is scheduled for June at LBNL. Development of slow control and monitoring system to integrated after internal review. Effort for beam testing firmware and software is underway. HFT TC 05/11/ LG14

Sensor and system development and testing status Beam test at Fermilab Measure efficiency of Phase-2 sensors using a sensor telescope. HFT TC 05/11/ LG15

Sensor and system development and testing status HFT TC 05/11/ LG16 Beam test at Fermilab We have a draft telescope design (see previous link) and test plan. Plan uses existing Phase-2 individual testing board design, existing prototype MTB and RDO boards. New testing boards have been ordered 50 um Phase-2 sensors will be delivered in 1 week. Design for individual testing board modification is complete. Initial contact with test beam facility at Fermilab. To do: Join with the FGT effort? Depends on schedule. Write and submit test beam proposal. Develop firmware for beam test of 4 sensor telescope. Develop light box and mechanical support structure. Fabricate trigger detectors (if required)

Sensor and system development and testing status HFT TC 05/11/ LG17 Beam Test at PHENIX Test a full sector of Phase-2 prototype sensors with a full prototype readout path at PHENIX with the new low radius beam pipe. This would be a very significant test if it can be arranged. This requires: Hardware design to integrate with PHENIX. Coordination with PHENIX for space, electronics space, power, etc. Successful cable design and fabrication (kapton with Cu traces) – Critical Path. Completion of all sector RDO firmware and software. Full validation of assembly fixturing and tools. Testing and QA hardware, firmware and software for fabrication stages. No schedule delays

Schedule (from TC 3/11/2010) PXL Cable development – Infrastructure testing board – testing complete May-w4 – Prototype detector cable FR-4 with Cu – testing complete July-w4 – Prototype detector cable Kapton with Cu – testing complete October-w4 Probe Testing – Phase-2 sensors – batch probe testing thinned sensors working May-w2 RDO prototyping – Full ladder RDO – documentation complete and internal review May-w1 Sensor and system development and testing – Beam test with Fermilab – TBD, hopefully August-September – Beam test preparation for Phase-2 sector at PHENIX? - TBD CD-2/3 – TBD, more information after this meeting? HFT TC 05/11/ LG18

CD-2/3 Needed List of the full set of documentation required for CD-2/3 and schedule for the production of these documents. - DONE Understanding of mechanism for producing additional required cost and schedule documentation, maintenance and updates. Institutional reporting requirements and path for fulfilling. STAR liaisons and infrastructure and design sign-off authority structure. Sarah will give a presentation on our cost and scheduling efforts for Pixel. HFT TC 05/11/ LG19

backup HFT TC 05/11/ LG20

Probe testing Status We need to probe test quantities (~50) of Phase-2 sensors for assembly onto prototype cables to assess the cable design. This will serve as the development path for the sensor tracking, handling and QA for the main production testing. We will be testing diced and thinned sensors. This is not usual practice for probe testing (usually wafers) and presents mechanical and handling challenges. HW will present progress on vacuum chuck design for automated production. Firmware and software for automated testing is complete and under test. HFT TC 05/11/ LG21

Sensor / RDO Services (preliminary) 240 W 180W300W 1350W (AC) 1100W (AC) Ladders MTB Platform (racks) RDO Crate DAQ Room 4800 × 42 AWG (TP) 160 × 24 AWG (TP) 40 × 0.42” dia. (50 TP cable) 20 × 16 AWG 10 × fiber optic cable pair 10 × USB 2 × TCD (10 TP) 28 × 12 AWG 2m 6m ~100m PP ~30m 22HFT TC 05/11/ LG

PXL Cable Development Status 3 identified Cable design options HFT TC 05/11/ LG23 Double sided Aluminum conductor with vias Single sided Aluminum conductor without vias

Chip A1 individual test (crop this image to show only left upper corner)

Chip A1 probe test results (crop this image to show only left upper corner)

Chip A1 individual tests (black) vs probe test results (red)

Poor vs better probe contacts (chip E8)

Probe tests vs ladder tests (chip C1) Probe tests ITB

Probe tests vs ladder tests (chip D9) Probe tests ITB