Md. Fazlur Rahman Pan Asia Power Services Ltd. Dhaka, Bangladesh

Slides:



Advertisements
Similar presentations
Pakistans Power Sector Need for Reforms By Kalim A. Siddiqui President-Petroleum Marketing Byco Petroleum Paksitan Limited 4 th International Power Generation.
Advertisements

PRESENTER – HASMUKH PATEL, CEO OF FIJI ELECTRICITY AUTHORITY
WinDS-H2 MODEL Wind Deployment Systems Hydrogen Model Workshop on Electrolysis Production of Hydrogen from Wind and Hydropower Walter Short Nate Blair.
November 13, 2009 Chairman, BPDB. 2  Electricity Growth : 5.8 % in % Av. since 1990  GDP Growth rate : Around 6 pc (last 5 years)  Installed.
1 Power Sector in Tanzania Recent Developments, Current Crisis, Issues, Challenges and Solutions.
1 By: Mr. Zafar Mahmood Chairman, Water and Power Development Authority OCTOBER 2014.
FIRST CAPACITY BUILDING WORKSHOP ON CLEAN DEVELOPMENT MECHANISM (CDM) UNDER CD4CDM INITIATIVE Date: 8-9 April, 2008 Venue: LGED Bhaban, Dhaka Presented.
Meeting the Goal: Progress Report Washington, DC June 30, x’25 National Summit 2010: Mission Achievable.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
A Developing Power System: Challenges & Prospects
Experience with Hybrid Energy Systems in Minigrids in South-Asia José A. Aguado, PhD Professor, University of Malaga Grid Expert, Effergy.
How Winds are Created The earth’s winds are caused by pressure differences across the earth’s surface due to uneven heating Local Winds: During the day.
When Grids gets smart Claes Rytoft Senior Vice President ABB World Forum on Energy Regulation IV Athens, Greece October , 2009.
E NERGY, E NVIRONMENT AND S USTAINABILITY Gaurav Shukla CUTS International.
Energy Development in China - From a View Point of Sustainable Development Yang Hongwei, Zhou Dadi Energy Research Institute, P. R. China
Exploring Energy Opportunities In India NABC Conference June 29, 2006.
Fremont County – Green Spring 2012 Research Team: Jacob Tolman, Justin Andersen, Thresia Mouritsen, Joseph Huckbody, John Beck Feasibility Study.
D EPARTMENT OF A GRICULTURAL, E NVIRONMENTAL, AND D EVELOPMENT E CONOMICS aede.osu.edu Making Green Jobs Work for Ohio March 3, 2011 Ohio Farm Bureau Federation.
3.3 Energy Resources Human Population, Carrying Capacity, and Resource Use.
The New Energy Landscape: Key drivers of the Energy Future.
COPYRIGHT © 2010 BALLARD POWER SYSTEMS INC. ALL RIGHTS RESERVED B A L L A R D P O W E R S Y S T E M S PUTTING FUEL CELLS TO WORK NOVEMBER 2010 Utilizing.
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
ENERGY IN THE MEDITERRANEAN REGION: Situation and prospects Dr Houda BEN JANNET ALLAL, OME General overview of renewable energy and energy efficiency in.
© ABB Group Slide 1 PowDoc id The Royal Swedish Academy of Engineering Sciences, IVA (avd II) Indian Power System – Recent Disturbance Abhay Kumar, HVDC,
1. Summit Implementation Review Group December 10, 2008 El Salvador Philippe Benoit Sector Manager, Energy Latin America and the Caribbean The World Bank.
Small Wind Turbines Innovation opportunities via small wind turbine testing Daniel Feszty Associate Professor Department of Mechanical and Aerospace Engineering.
Thinking About Alaska’s Remote Economies Prepared for Village Management Institute June 2003 Steve Colt Institute of Social and Economic Research University.
Smart Capacity Markets: Can they be Smart Enough? Tim Mount Department of Applied Economics and Management Cornell University Smart Capacity.
Techno-economic Analysis of an Off-grid Micro- Hydrokinetic River System for Remote Rural Electrification Central University of Technology Energy Postgraduate.
The Role of Renewable Energy in Addressing Climate Change Australian Government Support for Renewable Energy Denis Smedley Director Renewable Energy Technologies.
Croatian Power System 1 The Electric Power System - Croatia -
RENEWABLE ENERGY POLICY IN INDONESIA Andi Novianto Presented at APEC EGNRET Meeting Honolulu, March 29-April 3, 2009.
Conversions: Rural Alaska Energy Supply Chains presented to Rural Alaska Energy Conference September 2002 Steve Colt Institute of Social and Economic Research.
Johnthescone The IPCC Special Report on Renewable Energy Sources and Climate Change Mitigation UN Climate Change Conference June 2011 Bonn, Germany, 7.
Wind Turbine Design Methods
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Presented By: Dr. Thi Thi Soe Deputy Director
El Gallo Hydroelectricity Project PDD Analysis
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
2015 November 2015 Md. Abdur Rouf Director, Power Cell Use of Renewable Energy.
Reliability Competitive Rates Exceptional Service.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Micro-hydropower for the home, farm, or ranch: A brief overview
Hydro Power – the history and the future. Robyn Hammond, School of Environmental Sciences, University of East Anglia. 24 th February 2005.
EVN’s Wind Power Plan Ho Chi Minh city, 23 November 2015.
Power to the Coast Project Presented by: Su Wei Tan Industrial Research Ltd.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 Baseline for wind energy project in Tunisia Second National.
Slide 1 Overview of Conservation in the Pacific Northwest Energy Efficiency Options in the Northwest Post-2011Meeting March 4, 2008.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
India’s Energy Security: Role of Renewable Energy Amit Kumar TERI, New Delhi.
Powering a Reliable and Sustainable Energy Future for Ontario Bruce Campbell, President and CEO, IESO March 3, 2016.
Solar And Wind Energy To Boost Power Generation. Solar and wind energy are two of the most readily available renewable sources of energy to help us fight.
Kenya’s INDC: Actions in the Energy Sector
Republic of the Union of Myanmar Electricity Sector Financial and Regulatory Issues 18 May 2016 by Myanmar Energy Team The World Bank.
Using Technology for Electricity improvements
Presentation On Potentiality of Wind Power Generation in Bangladesh
Alternative Energy Promotion Center (AEPC)
Copenhagen 31 January 2008 Wind energy potential in Europe Methodology Hans Eerens MNP Netherlands.
Financing of Solar power plants
Rajib Das Dy GM, Planning November 5, 2017 Transition of India’s
How Winds are Created The earth’s winds are caused by pressure differences across the earth’s surface due to uneven heating Local Winds: During the day.
Section C Resource Management
How Winds are Created The earth’s winds are caused by pressure differences across the earth’s surface due to uneven heating Local Winds: During the day.
Tropical cyclones movement
Wholesale Electricity Costs
Production Month Sun Hours K Monthly Kwh Tou Peak Value After Kwh
The Potential of Renewable Energy in Libya
2015 January February March April May June July August September
Presentation transcript:

Md. Fazlur Rahman Pan Asia Power Services Ltd. Dhaka, Bangladesh

Some Key Statistical Data of Bangladesh Total Population : 140 Million (170 Million Unofficially) Total Area : 147,570 square kilometer Access to Electricity : 47 % (FY 2010) Electricity Growth : 7.0 % in 2010 Total Consumer : 11 Million (FY 2010) Transmission Line : 8000 km Distribution Line : 2,56,000 km Distribution Loss : 12 to 15 % Per Capita Generation : 200 kWh /yr (FY 2010)

Power Generation Scenario of Bangladesh Present Scenario (MW) : 5823 Demand (MW) 5500 to 6500 Available (MW) 4200 to 4500 Maximum Generation 4606 MW Load Shedding (MW) 1200 to 1500

Mitigation Measures: Non Gas Solution Immediate: 6-12 Months - Rental Plants: 500-1500 MW - Per unit cost: Tk 10 (FO) / Tk 16 (Diesel) Short term: 18-24 Months - Peaking Plants: 800 MW - Per unit cost: Tk 8 Medium term: 4-5 years - Base plants: 4X500 MW Coal - Per unit cost: Tk 3.5

Future Renewable Projects Renewable Energy Policy (2008) - 5 % of total generation by 2015 : 450 MW - 10 % of total generation by 2020 : 1600 MW Hydro: small hydro potential exists; limited scope Wind: At least 200 MW wind by 2013 Solar: Existing Capacity: 15 MW – 20 MW - Need at least 80 – 100 MW by 2013 - Still high cost ; off grid solution; may compete with oil Renewable will help in mitigating balance deficit Without wind energy, it is not possible to meet these targets

Monopoly of Natural Gas in the Power Sector of BD

We Need Diversification

Wind Power Prospects of Bangladesh : Rough and Conservative Estimates Curvature Length of Coastal Belt : 1400km If Only 10km inland from the Coastal Belt is considered If Only 5% Coastal Area is available for WT Installations Available Area will be : 70kmX10km = 700 km2 In 1 km2 20 WTs of 2 – 4 MW Capacity can be installed = 40-80MW Rough and Conservative Potentials: >>20,000MW Only 0.3% Area will be occupied by the WTs Rough Potentials are not Negligible

Geographical and Climatic Similarities with India Same Sea Same Wind Same Monsoon Same Climate Same Terrain 12000(+) MW Installed Capacity Bangladesh 1.9 MW In BD: 1.90 MW BB Side : 6000 MW By 2030: 20000MW

Preliminary Indications : Shape of the Coastal Belt Speeds of the cyclones are increased due to this funnel shape.  Main reason of severe cyclones Same thing for normal winds The are very good possibilities of wind energy But Met. Data are very poor (2 to 3 m/s). But measured data are good (>6.50 m/s) V Wind Flow

Measured Wind Data of Some Sites Month Muhuri Dam, Feni (m/s) H=50m, RCL=0 Mognamaghat Cox’s Bazar (m/s) Parky Saikat Patenga, Chittagong (m/s) Kuakata Patuakhali (m/s) January 5.10 5.30 4.90 5.80 February 4.80 5.50 March 7.00 7.30 7.60 7.70 April 7.90 7.80 8.30 May 8.10 8.20 June 7.20 8.00 6.90 July 7.40 8.40 August 6.80 7.50 September 6.70 7.10 October 6.20 6.40 6.30 November 5.60 5.90 December 5.40 Annual Average Wind Speed (m/s) 6.50 6.725 6.733

Why No Wind Power in Bangladesh??? Main Arguments Against Wind Power 1. Too Many and Too Strong Cyclones? 2. Low Wind or No Wind?

Kutubdia Wind Farm, Bangladesh Initial Starting Date : 23/12/2007

Cyclones and Tornados Faced by the Project 1. Tropical Cyclone Akash : 15 May 2007 :: Danger Signal 7 2. Tropical Cyclone Sidr : 15 Nov 2007 :: Danger Signal 10 3. Tropical Cyclone Nargis : 4 May 2008 :: Danger Signal 8 4. Tropical Cyclone Reshmi :28 Oct 2008 : Danger Signal 6 5. Tropical Cyclone Bijli : 18 April 2009 :: Danger Signal 7 6. Tropical Cyclone Aila : 25 May 2009 :: Danger Signal 7 7. Tropical Cyclone Giri : 23 Oct 2010 :: Danger Signal 5 8. More Than 20 Dangerous Local Tornados

Present Condition of the KWPP Pictures taken on 28/03/2011

Main Source of Wind Data Met. Department Met Data are very poor Experts Opinion: No Wind in Bangladesh? Why ?

Met. Data vs Reality

The Met Office is located in an urban built up area.

Terrain Analysis

Peak Wind Season Monthly Wind Speeds at Kutubdia in 08-09 Wind is Maximum : March to October Peak Demand Season Peak Wind Season

Electrification of the Remote & Isolated Areas Extension of the Grid is Impossible (in some places) Extension of the Grid is Expensive Extension of the Grid is Risky Extension of the Grid is Time Consuming There live about 25 to 30% of the Total Population Many Resources By 2021 : Electricity for All With the Present Approach – It is not at all Possible 1 MW Cost of SPV : US$7 to 10 Million 1 MW Cost of Wind : Tk. 12 to 15 crores (Grid Q. Power) With Bottom Up Planning Approach VS Conventional Approach With Small WTs and Localized Grids of 11KV/440V

Small Wind Turbines (SWT): Most Appropriate for Bangladesh About 25% of total population is in the remote and isolated areas (>40 Million) Worst affected by Global Climate Change Extension of grid is difficult, expensive, risky and vulnerable SWTs can be transported and installed at any site any time Grid Quality Power at 220 or 440VAC Minimum land requirement/occupation Minimum wastage of Agricultural Land SWT Electricity Cost: Tk.10 to 15/kWh SPV Electricity Cost: >Tk. 50/kWh

MagLev Wind Turbines : A New Revolution

MagLev Wind Turbines : A New Revolution Low noise, low frictional losses, low vibration Higher efficiency by 20 to 30% Decreased frictional losses by 40% Decreased O&M Costs by 50% Lower materials requirements and lower prices Low Cut-in Wind Speed (1 to 2 m/s) Higher working wind range (1 to 40 m/s) Longer working life (50 to 100 years) Suitable for lower wind areas Suitable for rural electrification and Irrigation Suitable for Urban Building Roofs Easy to control and less electronics Low area occupation

Main Barriers to Wind Energy in Bangladesh Lack of policy support from the Government Corruption in the public sector Mind set of aged bureaucrats/policy makers (big power plants for big money) Lack of adequate knowledge in the top policy makers Lack of enough pilots/demo projects on wind energy Lack of infrastructures for the large wind turbines Hidden subsidies in the conventional energy sources & artificial lower energy costs from them. Anti-wind propaganda by Ph. D. holders

Recommendations : 1. To undertake and implement some Dual Purpose (Village Electrification & Irrigation) Pilot Projects in some remote and isolated communities of Bangladesh. 2. To undertake and implement some Pilot Projects with the MagLev Wind Turbines in some tall buildings in Dhaka, Bangladesh. 3. Government should immediately announce the Green Tariffs/Feed-in-Tariffs and other incentives to attract private investment/FDI