Government of Canada Policy on Radioactive Waste and Legacy Uranium Mines Tom Calvert Uranium and Radioactive Waste Division Natural Resources Canada May.

Slides:



Advertisements
Similar presentations
The Canadian Occupational Health and Safety System
Advertisements

The Role of Government in Reducing the Impacts of Agriculture on Water Quality Trilateral Workshop on Water Quality Banff, Alberta October 22 nd to 24.
Responsible Resource Development April 17, Context Government focussed on responsible development of Canada’s natural resources to create jobs and.
1 Mineral Rights in Alberta Alberta Energy Alberta Department of Energy.
Proposed Regulatory Framework for Wastewater Presented by Claude Fortin Winnipeg, Manitoba December 6, 2007.
Cluff Lake Project IAEA- RSLS Workshop Elliot Lake, Ontario, May 2, 2014 Dale Huffman Vice-President, SHEQ AREVA Resources Canada.
Environment Canada’s Presentation to the Nunavut Impact Review Board (NIRB) Regarding AREVA Resources Canada Inc.’s Kiggavik Uranium Mine Project NIRB.
National Statement Country II. Current Status of the Country 1. Nuclear power stations are not planned in the county. 2. Widespread of SRS for industrial.
1 Bill C-42 Antarctic Environmental Protection Act Standing Committee on Energy, the Environment and Natural Resources September 2003.
1 Best Practices for Risk-Informed Remedy Selection, Closure, and Post-closure Control for DOE’s Contaminated Sites October 30, 2013.
Remediation Challenges and Stakeholder Engagement: A Canadian Perspective Michael Binder President Canadian Nuclear Safety Commission Presentation to the.
DEPARTMENT OF TRADE AND INDUSTRY INCREASING ACCESS TO FINANCE.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Safety and Security Aspects of the Management of High Level Waste and Spent Fuel Ramzi Jammal Executive Vice-President and Chief Regulatory Operations.
Regulating Legacy Sites in Canada 2014 Ron Stenson, Senior Project Officer Canadian Nuclear Safety Commission Ron Stenson, Senior Project Officer Canadian.
1 Long-Term Stewardship of Uranium Mills in the United States – Regulatory Issues Keith McConnell, Deputy Director for Decommissioning and Uranium Recovery.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
MODULE “STRATEGY DEVELOPMENT”
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
ONTARIO’S ABANDONED MINES REHABILITATION PROGRAM Presentation for IAEA/CNSC Workshop Elliot Lake, ON May 1, 2014.
Upper Blackfoot Mining Complex
Kiggavik Project Final Hearing Presentation
DEPARTMENT OF PRIMARY INDUSTRY, FISHERIES AND MINES Sustainable development and the challenges of the 21 st century Minerals and Energy Mining – not just.
MINERAL RESOURCES DEVELOPMENT POLICY(2013) 14 th February 2014 MINISTRY OF MINES, ENERGY AND WATER DEVELOPMENT 1.
KZN Immovable Assets Disposal Strategy & its role in transformation. Towards Transformation of the Property Sector KZN PUBLIC WORKS.
Update on progress with development of DS459
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Kazakhstan.
CLEAN AIR ACT  This act was passed as an attempt to regulate the amount of harmful pollutants into our air.  The Clean Air act’s goal.
PROCESSES AND ISSUES TO CONSIDER ON WHETHER OR NOT TO AMEND AGREEMENT STATE STATUS Uranium Working Group August 2, 2012.
TEAM 1 NONAMECOUNTRY 1SU RUI (LEADER)CHINA 2TENG IYU LIN (PRESENTER)MALAYSIA 3MUHAMMAD TARIQ AZIZ (RAPPORTEUR)PAKISTAN 4NORAISHAH PUNGUTMALAYSIA 5MOHAMMAD.
UNRESTRICTED / ILLIMITÉ LLRWMO’s Legacy Sites in Canada IAEA RSLS Elliot Lake Workshop Mark Gardiner 2014 May 2.
1 International Working Forum on Regulatory Supervision of Legacy Sites (RSLS) Technical Meeting Amel MELLOUK – ASN / DRC Jérémie VALLET – MEDDE/MSNR Regulatory.
Institutional Control Program Long Term Care and Control of Decommissioned Mine/Mill Sites Located On Crown Land Saskatchewan Ministry of the Economy April.
Regulation of SLOWPOKE Research Reactor Facilities in Canada
Uranium Mining and Remediation Exchange Group, UMREG2012 Vienna 7 – 8 November 2012, DEVCO Nuclear Safety 1 EU - Instrument for Nuclear Safety Cooperation.
Overview of the Land Recycling Program (Voluntary Cleanup Program)
Natural Resources Canada : Regulatory Responsibilities Mineral Advisory Group Meeting (MDAG) Newmont Mining Corporation Doris North Project / Phase II.
Fisheries and Oceans Canada Intervention to the Nunavut Water Board on the Type A Water License Renewal for the Nanisivik Mine Project Fisheries and Oceans.
THE DORIS NORTH WATER LICENSE APPLICATION, PUBLIC HEARING Department of Environment, Government of Nunavut August 2007.
Newmont Mining Corporation Mineral Development Advisory Group Meeting Fisheries and Oceans Canada October 26 th to 28 th, 2010 Cambridge Bay, Nunavut.
Nunavut Impact Review Board Presentation of Technical Submission AREVA Resources Canada Inc. Kiggavik Uranium Mine Project March 2015 Transport Canada.
Michael Webster (Cameco Corporation) Tamara Yankovich (IAEA, Formerly Saskatchewan Research Council) Martin Klukas (Atomic Energy of Canada Limited) IAEA.
DEPARTMENT OF REGIONAL DEVELOPMENT, PRIMARY INDUSTRY, FISHERIES AND RESOURCES Mining Management Act Security
1 ESTABLISHMENT OF REQUIREMENTS Module “National legislation and licensing” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
IAEA International Atomic Energy Agency Summary and Overview of TECDOC Russel Edge Decommissioning and Remediation Unit Division of Radiation,Transport.
Regulatory Approach to Radioactive Waste Management and Remediation in Central Asia Tamara Zhunussova Vienna, IAEA, 6-8 November, 2012.
Long-Term Spent Fuel Management in Canada International Conference on Management of Spent Fuel from Nuclear Power Reactors Vienna, Austria May 31, 2010.
56th Regular Session of the IAEA General Conference
“ OVERALL DECISION MAKING IN PLANNING FOR REMEDIATION OF URANIUM MINES” Presentation to the Senior Regulator’s meeting at the 56 th IAEA General Conference.
Regulatory Framework for Uranium Production Facilities in the U.S.
EU INITIATIVES ON MINING WASTE. Why an initiative on Mining Waste ? Key environmental issues: l Potential environmental risks during disposal m Safety.
Environmental Assessment Act – Overview Environmental Media Group.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Northern Projects Management Office in Nunavut Nunavut Mining Symposium April 2012.
Intervention – 2004 Nanisivik Reclamation and Closure Plan Arctic Bay June 3-4, 2004 Nunavut Water Board Public Hearing.
International Atomic Energy Agency IX.4.2. Principles of radioactive waste management Basic technical management solutions: concentrate and contain, storage.
Virginia Office of Public-Private Partnerships (VAP3) Adopted Public-Private Transportation Act (PPTA) enabling legislation in 1995 Public-Private Education.
URANIUM: The Mines & Radioactive Waste Left Behind.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
Miramar Hope Bay Ltd. Doris North Project Nunavut Water Board Licence Application Indian and Northern Affairs Presentation NWB Final Hearing Cambridge.
Investing in Cameco. About Cameco  One of the largest uranium producers in the world  Headquarters are located in Saskatoon SK.  Leading provider of.
Global Warming – The Broad Legal Reach of Initiatives to Reduce Carbon Emissions Worldwide Legal Issues Associated with Carbon Capture and Geologic Storage.
NRCan Community Roundtable Presentation Meliadine Gold Project Rob Johnstone Deputy Director Sustainable Mining and Materials Policy Division Minerals,
Regulations Under Revision Hazardous Waste
Supervision of Insurance Market Conduct in Canada
First Nation Waste Management Initiative
SMA ENVIRONMENTAL FORUM 2018
October 23, 2015 LLW Forum Meeting Chicago, IL Melanie Wong,
Nikisi Lesufi Senior Executive Chamber of Mines
Management of Pollution Risks at Activity Cessation GROUP HSE RULE (CR-GR-HSE-421) EXECUTIVE SUMMARY This rule sets the HSE requirements for the management.
Presentation transcript:

Government of Canada Policy on Radioactive Waste and Legacy Uranium Mines Tom Calvert Uranium and Radioactive Waste Division Natural Resources Canada May 1, 2014

1: HISTORICAL CONTEXT Port Radium ~1957 2

Responsibility for Mineral Resources in Canada  Since 1930, all ten Canadian provinces responsible for mineral resources within their boundaries.  Prior to 2003, federal government responsible for mineral resources in the three territories.  Responsibilities for resources have been transferred to the territorial governments in the Yukon Territory (2003) and Northwest Territories (2014) and will be transferred in Nunavut. 3

Second World War  1942: the federal government requested Eldorado Gold Mines Limited to re-open its radium mine on Great Bear Lake, Northwest Territories and its refinery in Port Hope, Ontario to supply uranium for the US-UK-Canada Manhattan Project (world’s first nuclear bomb).  1943: The federal government and most provincial governments banned uranium exploration and mining by private companies. (uranium is a strategic commodity).  1944: The federal government purchased Eldorado Gold Mines Limited to create the federal Crown corporation (publically-owned company) Eldorado Mining and Refining Limited. 4

Post War Period  1946: The federal government created the Atomic Energy Control Board (AECB).  1948: Private exploration and mining was allowed but subject to AECB regulations:  Permits were required for advanced exploration and for the production of uranium.  The permits required companies to report resources and production only to the government (kept secret).  All uranium had to be sold through Eldorado.  The provincial governments remained responsible for regulating uranium mining within the provinces. 5

Cold War Uranium Mining Boom,  : Private companies discover many low-grade uranium deposits, though most are not economic due to high cost / low prices.  : The US government offered special- price five-year contracts for uranium, creating an incentive for private companies to develop low- grade uranium deposits.  Eldorado supplied the uranium from the private companies to the US government at cost and did not profit from these contracts. 6

Cold War Uranium Mining Boom,  1953: Eldorado’s Beaverlodge mine opens.  : 23 privately-owned mines open.  1956: US demand met - no additional contracts.  1956: Restrictions on publishing uranium resources and production were removed.  1957: Contract to supply UK government.  1958: Requirement to market all uranium through Eldorado was relaxed. Limited quantities of uranium could be sold to friendly countries for research purposes. 7

Cold War Uranium Mining Boom,  1961: With no new US contracts, only 8 uranium mines remain operating compared to 25 in  1962: Requirement to market uranium production through Eldorado ends.  1963: An additional contract with the UK government and a federal government stockpile program allows 4 of the remaining mines to operate beyond All other mines closed.  1965: All future uranium sales must be for peaceful purposes only (federal policy). 8

Second Uranium Mining Boom,  1974: Formation of the Saskatchewan provincial Crown corporation Saskatchewan Mining Development Corporation (SMDC) which was involved in uranium exploration and mining.  : New mines open in Ontario and Saskatchewan (nuclear power contracts).  1977: AECB developed regulations for uranium mining activities, including tailings management.  1981: Eldorado purchased Rabbit Lake mine.  1982: Eldorado’s Beaverlodge mine is closed. 9

1988 to Present  1988: Eldorado and SMDC were privatized and merged to form Cameco Corporation.  1988: AECB requires companies to provide decommissioning plans for uranium mines.  1996: AECB requires companies to provide financial assurances for the costs of decommissioning.  1996: Last operating uranium mine in Ontario closes. Saskatchewan becomes sole producer. 10

2: FEDERAL POLICY Eldorado Refinery Port Hope, Ontario,

Federal Policy Radioactive Waste Policy Framework (1996)  Waste owners:  responsible for managing their waste  responsible for developing and implementing long-term solutions  Federal role:  ensure long-term waste management carried out in a safe, environmentally-sound, comprehensive, cost-effective manner  develop policy, regulate, and oversee waste owners’ compliance with legal, financial, and operational requirements 12

Federal Policy Nuclear Safety and Control Act (2000)  Waste producers/owners must be licensed  Established the Canadian Nuclear Safety Commission (CNSC) to replace the Atomic Energy Control Board (AECB) 13

Federal Policy: Application  Under the terms of the 1988 privatization of Eldorado, the federal government has accepted financial responsibility for legacy sites at Beaverlodge, Saskatchewan and Port Hope, Ontario.  The federal government also has responsibility for abandoned mines in the three territories. (i.e. Port Radium and Rayrock mines, Northwest Territories).  All other uranium mine sites in Canada are the responsibility of the current owners (private company or the province ). 14

3: POLICY INITIATIVES FOR NON- FEDERAL SITES Gunnar Mine,

Federal – Provincial Agreements  Policy initiatives allow the federal government to voluntarily take action that is not required by federal legislation or is not strictly within federal jurisdiction.  The Government of Canada has entered into agreements with the provincial governments of Ontario and Saskatchewan to assist in the remediation of legacy uranium mines located on non-federal lands. 16

1995 Canada – Ontario Memorandum of Agreement  : 17 uranium mines operated in Ontario, producing 176 million tonnes of tailings, 85% of Canada’s total.  Both the provincial government (since 1955) and the federal government (since 1977) had a role in regulating the operation of these mines.  1988: The federal government began requiring decommissioning plans for uranium mines. 17

1995 Canada – Ontario Memorandum of Agreement  1991: The Ontario government began requiring mining companies to provide financial assurances for the costs of decommissioning mines (including uranium mines).  Some companies had difficulty providing these financial assurances.  1995: The governments of Canada and Ontario entered into a “safety net” agreement to share costs if an owner was unable to finance the decommissioning of a uranium mine. 18

1995 Canada – Ontario Memorandum of Agreement  All sites in Ontario have now been decommissioned by the owners without government funding.  Since 1996, the federal government has also required that companies provide a financial assurance for decommissioning.  As a result, it is unlikely that there will be a need to implement the shared-cost funding provisions provided in the agreement. 19

Shared Responsibility Contaminated Sites Framework  Federal funds have been allocated for the years 2005 to 2020 to contribute to the cost of remediating contaminated sites located on non-federal land.  To qualify for funding, the contamination must be partly a result of federal government activities or security efforts.  The Framework is not specific to uranium mines. Industrial sites (i.e. Sydney Tar Ponds) have received most of the funds. 20

Shared Responsibility Contaminated Sites Framework  Proposals for funding require an analysis of the potential remediation options, a remediation plan, and the total cost.  A Memorandum of Agreement is negotiated with the proponent if the proposal is accepted.  2006: Canada – Saskatchewan Memorandum of Agreement was signed to provide funding to remediate Cold War legacy uranium mines in Saskatchewan. 21

2006 Canada – Saskatchewan Memorandum of Agreement  The Gunnar uranium mine was closed in 1964 in accordance with the provincial regulatory requirements of the time.  The company that operated the Gunnar mine no longer exists and the province of Saskatchewan is now the custodian of the site.  Under the agreement, the federal government is providing $12.3 million to assist with the remediation of the Gunnar mine site. 22

4: SCIENCE AND TECHNOLOGY Bicroft Uranium Mine, Ontario 23

Natural Resources Canada: Science and Technology Expertise  Environmental hydrogeochemistry  Acid rock/mine drainage, metals leaching  Geology and mineralogy  Surface and groundwater hydrology  Mine site assessment, rehabilitation and decommissioning  Effluent treatment and monitoring  Environmental toxicity and risk assessment  Cold-climate research. 24

Natural Resources Canada: Uranium Mine Rehabilitation Research  Mine environmental research since the late 1960s, including uranium mining.  Establishment of the National Uranium Tailings Program (NUTP) in the early 1980s.  Establishment of the Mine Environmental Neutral Drainage (MEND) Program in the late 1980s. 25

National Uranium Tailings Program (NUTP)  Detailed characterization of inactive uranium mine tailings in Ontario (Elliot Lake) and Saskatchewan (Gunnar mine).  Development of site characterization and reclamation techniques.  Development of contaminants migration models which have been widely adopted  Results of NUTP were incorporated into the MEND program. 26

Mine Environmental Neutral Drainage (MEND) Program  Established in the late 1980s by Natural Resources Canada in partnership with industry.  Research on acid rock/mine drainage and metal leaching from mines, waste rock and tailings.  Included extensive research of uranium tailings at Elliot Lake. 27

Mine Environmental Neutral Drainage (MEND) Program  Development of technologies for mine site assessment, rehabilitation, and decommissioning in:  Prediction and modelling  Prevention and control  Waste disposal  Effluent treatment and monitoring  Verification. 28

Mine Environmental Neutral Drainage (MEND) Program  The mining industry has widely adopted the MEND Program’s mine site assessment, mine decommissioning and mine management technologies.  Over 200 mine environmental related research reports and documents available at 29

5. Conclusions  Direct federal participation in uranium mining ended in 1988 with the privatization of Eldorado.  Federal regulation was originally focussed on the security issues regarding uranium as a strategic military commodity. The provinces and territories were responsible for regulating uranium mining before  Federal regulation now includes all aspects of uranium mining from advanced exploration to mine decommissioning. 30

Conclusions  Federal Radioactive Waste Policy Framework stipulates that waste owners are to be responsible for their wastes.  The federal government has financial responsibility for legacy sites that were operated by Eldorado, as well as for abandoned mine sites located in the three territories.  The federal government provides scientific research and expertise to support environmentally-sound and cost-effective mine decommissioning. 31

THANK YOU  Questions? 32 Eldorado Mine and Mill Beaverlodge, Saskatchewan