03-0F2204 Sly Park Road UC (Replace) Prebid Outreach Meeting: CIP Structural Concrete Materials Specification Overview John Yang, P.E. Office of Structural.

Slides:



Advertisements
Similar presentations
FHWA Qualification Requirements for Laboratories NACLA Forum February 11, 2009 Mike Rafalowski Materials Engineer Office of Pavement Technology Federal.
Advertisements

Construction Materials
Department Initiatives 25 April 2012 Bob Pieplow, P.E. Acting Chief Engineer.
Current State of the Home Performance Industry Who’s doing what, and why? And, how does this affect your program? A. Tamasin Sterner July 2011.
Monitoring the Product Production, Import, Wholesale and Retail Level Monitoring.
2015 State Aid Conference Ramsey County Office Arden Hills, Mn February 19, 2015.
Caltrans Changes SECTION 39 “Hot Mix Asphalt”
QUALITY CONTROL More Makes Money Less Leads Losses
Amendments to the Specifications Discussion of Changes to the Concrete Materials Specifications.
PRESENTATION TO 34 TH ANNUAL AIRPORTS CONFERENCE 3/02/11 By: Casimir J. Bognacki, PE, FACI Chief of Materials Engineering.
MICHIGAN RIDES ON US 2015 Local Roads Workshop Gaylord March 12, 2015.
 Define a Quality Assurance Program (QAP)  Review common terminology  Discuss the fundamentals of an acceptance program  Discuss the fundamentals.
1 Quality Control Program. 2 Objectives To know: To know: –How the QC Program is Doing –Effect of Specification Changes on the QC Program –Contractor.
PRE-QUALIFICATION AND BID ENTRY WEB APPLICATIONS CONTRACTS ADMINISTRATION Presenters: Juanita Moore Leila Griffin September 9, 2003.
National Bridge Inspection Standards (NBIS)
Impacts of “MAP-21”on the National Bridge Inspection Program Tribal Government Coordination Meeting Date August 7, 2014 Presented by: Gary Moss, P.E. Acting.
Chapter 3. Obtaining Silica-Fume Concrete  Specifying Silica Fume and SFC  Proportioning SFC  Producing SFC.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
 Embankment Construction – LOTs  What is the maximum length of a LOT? Mainline pavement lanes, turn lanes, ramps, parking lots, concrete box.
Asphalt Quality Assurance Program
Quality Control Testing
2002 FDOT/FTBA Construction Conference
NOTE: When UPGRADE MIX DESIGN or MATERIAL CHANGE TO JMF is selected, the RELATED JMF cell appears in yellow. Enter the approved JMF # for.
Personnel Basic Principles of GMP Workshop on
 Quality Management Program (QMP) Review  HTCP Program  IRI News.
READYMIX INDUSTRY There are two main components in asphalt concrete: 1) the asphalt cement, or glue, and 2) the aggregates.
Update on End Result Specifications Celik Ozyildirim, Ph.D., P.E.
QUALITY CONTROL QUALITY ASSURANCE INDEPENDENT ASSURANCE
WELCOME TO TRAINING PROGRAMME FOR CONSULTANTS’ SERVICES FOR 3 rd PARTY QUALITY CONTROL AND QUALITY ASSURANCE G. PRABHAKAR.
EDMR Electronic data submittal system Jeffrey A. Ewick, Section Chief Data and Information Services Section Electronic Discharge Monitoring Report.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
 Importance of Material Coordinators  Spec Requirement  CMM Requirement  General Description of Training  Materials Coordinator Learning Objectives.
Developing a Mixture-Based Specification for Flexible Base.
Allen Hughes State Materials Office
 Have an approved mix design before paving.  The department has eliminated the use of PG -22 Asphaltic Material and replaced it with PG -28.  Tack.
NBIS – National Bridge Inspection Standards National standards for the proper safety inspection and evaluation of all hwy bridges NBI – National Bridge.
2014 NCR Construction Conference Materials Presentation John Brophy Jeff Michalski
Important informations
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
REVISED May 2009STATE MATERIALS OFFICE Goals in this Session To understand:  The Sampling & Testing process  The Project Certification process  The.
LEADS/EMS DATA VALIDATION IPS MeteoStar December 11, 2006 WHAT IS VALIDATION? From The Dictionary: 1a. To Make Legally Valid 1b. To Grant Official.
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
Concrete Field Sampling
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
Construction Inspection for Field Office Activities Welcome by SCE Introductions Name Position (SCT, SC, DC, CET, ETC) Location Instructors 1.
2016 EEO OFFICERS ANNUAL ON-LINE TRAINING This presentation may be downloaded to your PC in order to complete the training session at your own pace. Presented.
Project Materials Usage and Concerns. Project Materials and Acceptance QC/QA Specifications QC/QA Specifications Quality Control Plans Quality Control.
Role & Responsibility for Quality Assurance What is your opinion on this topic heading? Role and Responsibility of: Role and Responsibility of….(Er.) for.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
QC Document Update Todd Shields, INDOT.
UTILITY VAULTS: THE PRECAST ADVANTAGE
Construction Management
Chip Seal Quality Assurance Guide
Raising the Bar: technician certification
Navigating FDOT Specifications and Standards
Raw Materials For Precast Concete Pipe and Box Culverts
Quality Control Personnel Training
QC Personnel Responsibilities
Precast Concrete Pipe and Box Culvert Equipment Calibration
2018 Revisions to NYCDOB Code
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Emulsion Task Force Meeting
Quality Assurance for Emulsified Asphalt Surface Treatments
Americas Aerospace Quality Group Registration Management Committee
Concrete Surface Repair Technician
Prime Factors for Successful Preservation Treatments
Managing Material with Efficient use of DOT Resources
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Fiber Reinforced Polymer Systems
Presentation transcript:

03-0F2204 Sly Park Road UC (Replace) Prebid Outreach Meeting: CIP Structural Concrete Materials Specification Overview John Yang, P.E. Office of Structural Materials Materials Engineering Testing Services Division of Engineering Services January 24 th, 2014

Prebid Outreach Meeting Section 11-4 CIP Structural Concrete Materials Changes Define QC and QA Roles & Responsibilities

Working with Industry to Implement Executive Decision on QC Notable involvement from Industry Organizations since 2008 decision document Caltrans Rock Products Committee Many Caltrans units Construction, Materials, Specs, Design… Continuous Outreach Coordination of Joint Efforts

Pilot Program – Structural Concrete QCQA Project EA Project Common Name 103-0F2204 ED-50 Sly Park Rd Undercross San Francisquito Bridge 304-4A0904 NAP-29 Troutdale Creek Bridge FRE-180 King's Canyon Expressway U4 I-10 HOV (Seg 3) LA-5 Widening Valley View Ave LA-5 Widening Florence Ave Project 808-0N5904 SBD-40 Replace Van Winkle Wash 911-2T1824 SD-805 Palomar DAR Going AdvertisedAwaiting To Be Advertised

Agenda Project Overview New Requirements for CIP Structural Concrete Materials QC Responsibilities, Testing, and Inspection Verification Testing DIME Data Input Dispute Resolution

Project Overview Contract No.: 03-0F2204 Description: Replace Bridge Project Estimate: $6,000,000 Location: HWY 50 in El Dorado County **This project is in a freeze-thaw area

Requirements for Structural Concrete Quality Control Section 11-4 “Cast-in-Place Structural Concrete Materials” “Quality control and assurance for CIP structural concrete materials includes: 1.Your QC program 2.Acceptance of the concrete by the Engineer using the Department's test results and verified QC test.” Applies to Sections 49 and 51. Does not apply to Minor Concrete, Paving Concrete, Precast Concrete

11-4 Cast-in-Place Structural Concrete Materials” Specification Overview of “11-4 Cast-in-Place Structural Concrete Materials” Specification

Quality Control Meeting ( F) A meeting to discuss the QC requirements for structural concrete Meeting attendees Include: The Engineer The QC Manager At least one representative from each concrete plant

Quality Control - Contractor Program ( A) Develop a QC Plan QCM Inspection, Sampling, and Testing by Contractor Certified personnel Accredited labs ASTM test methods Methods and frequencies of QC procedures

Quality Control - Role of Quality Control Manager ( ) Designated by the Contractor Ensure all materials meet Contract requirements Ensure QC personnel adhere to QC plan Review all correspondence, submittals and reports Maintain QC Records

Quality Control - Quality Control Manager Qualifications ( B) QCM must have one of the following: Civil Engineer in State of California ACI Lab Testing Tech Level 1 NICET Level II Concrete Cert ICC Reinforced Concrete Special Inspector Cert ASQ Certified Quality Manager Section 11-1 of 2010 Standard Specifications Must be an employee of the contractor or a subcontractor whose only responsible for QC.

Testing and Inspection Personnel ( C) QC laboratory testing personnel must have: ACI Laboratory Testing Technician, Level 1 ACI Aggregate Testing Technician, Level 2 QC field testing personnel and field and plant inspection personnel must have: ACI Concrete Field Testing Technician, Grade I Caltrans IA Certifications not required for these Concrete tests

Testing Laboratories ( D) Must be an authorized laboratory Have a current accreditation from the AASHTO Accreditation Program

Concrete Plant Requirements ( E) Each plant must have: Current National Ready Mixed Concrete Association (NRMCA) certification Authorized under California Test 109

Quality Control Procedures – QC Tests and Frequencies ( H) Frequencies determined by ACI and Standard Industry practices Lab test results approved and stamped by a PE Results will be in the form of daily field logs, data submittals, and monthly reports

QC Tests and Frequencies Test Test Method Minimum Frequency Aggregate Gradation ASTM C136 Once per each day of pour Sand Equivalent ASTM D2419 Once per each day of pour % Fines under 75 Microns ASTM C117 Once per each day of pour Moisture Content (within half a percent) ASTM C times daily depending on conditions (at batch plant) Slump ASTM C143 Once per 100 CY or when consistency is in question Unit Weight ASTM C138 Once per 100 CY or each day of pour, whichever is more frequent Air Content ASTM C173 / ASTM C231 If concrete is air entrained, once per 30 CY in freeze-thaw areas, every 100 CY in other areas Temperature ASTM C1064 Once per 100 CY or each day of pour, whichever is more frequent Compressive Strength ASTM C31/C39 Once per 100 CY or each day of pour, whichever is more frequent

Verification Sampling and Testing ( B) The Department performs verification testing of the QC tests for the following quality characteristics: 1.Slump 2.Air Content 3.Compressive Strength

Allowable difference between results: Quality Characteristic ASTM Test MethodDifference Slump C 143/C 143M1 inch Air content C 231/C 231M or C 173/C 173M 32 percent of the average of the 2 test results Compressive strength a C 172/C 172M, C 31/C 31M, and C 39/C 39M 14 percent of the average of the 2 test results a The Department performs verification tests at the maximum time allowed. Verification Sampling and Testing ( B)

Test Results ( G(3)) Test sample identification number – very specific requirements given in specifications. Allows QC and QA test results to be compared

Submission of QC Results Electronic submission of test data through Data Interchange for Materials Engineering (DIME) Communicating results in a timely manner Onsite submission of results Monthly summary report

Online Submission: DIME- Data Interchange for Materials Engineering Electronic data collection from all QC and QA testing labs Worked with industry for over a year for Beta testing and awareness

DIME Overview Submit data within 3 days. Methods to input data: Batch Upload Manual Entry Browser based web application Works on multiple operating systems Training will be provided

How to Set Up Account Submit following data to Quality Assessment and Management Branch of METS Caltrans Company name and street address Full name and of laboratory account manager User Account Types Lab Account Manager Data Verifier (i.e. Engineer) Data Provider (may add and view test data) Subscriber (may only view test data)

Dispute Resolution ( B(3)) You and the Engineer must investigate the: Sampling method Test procedure Equipment condition Equipment calibration Other factors to determine the cause of the difference Until the cause of the difference has been resolved, the Department's test results are used for acceptance of the concrete.

Acceptance ( C) If any QC plastic concrete test results fail: QC rejects the load Notifies the Engineer. Repeat the QC tests on subsequent loads until test results comply with requirements. Hardened concrete will be accepted or rejected under Section 90. Deductions are determined under Section 90

Example 1 – Compressive Strength Scenario: Designated 28-day compressive strength = 4000psi QC 42 days = 4100psi Verification 42 days = 3900psi What to do? QC – Verification = 200psi QC result verified (14% of avg.= 560 psi) Not a deduction because the QC test is used for acceptance.

Example 2 – Compressive Strength Scenario: Designated 28-day compressive strength = 4000psi QC 42 days = 3800psi Verification 42 days = 4400psi What to do? QC – Verification = 600psi QC result not verified (14% of avg.= 574psi) Launch an investigation to determine dispute resolution.

Summary QC Responsibilities, Testing, and Inspection Verification Testing DIME Data Input Dispute Resolution

Questions and Feedback Submit contract questions formally through bidder inquiry