APPLICATIONS MILLING MACHINE CONTROL SYSTEMS LAYOUT FOR SUPER-ELEVATED CURVES PAVER CONTROLS POTENTIAL PROBLEMS.

Slides:



Advertisements
Similar presentations
Volvo Construction Equipment Road Institute Paving Principles.
Advertisements

By Robert J. Blight Project Engineer Bureau of Materials.
Manufacturing Technology
Procedures for finishing slabs-on-ground Chapter 7.
GeoPak Ver Update New Criteria Enhancements since last year. Using Backslope Override and the Backslope Constraint Line(BCL)
Ground-Supported Slabs • Exterior Flatwork
Drill Press. General Safety Wear your safety glasses at all times Take off all jewelry Do not wear loose clothing Make sure you are the only person in.
Solid Cylinder cut at an angle Drawing Abilities Teacher © J Lewis 2004.
Chapter 14: Machines.
PAVEMENT REHABILITATION
1 Prestudy Paver Training Wardenburg February 2009 Dipl.-Ing. (FH) Volker Behrens Dipl.-Kfm. Roland Egervari
Maintenance of Traffic (MOT)
Placing and Finishing Tools and Equipment
Grade Sensor Placement rev Aug 2009 Grade Sensor Placement Asphalt Paving Grade Sensor Placement.
EXAM 2 REVIEW. 1. Drainage problem (25 pts) Below you see a cross-section of a ditch. It runs parallel to a 200-acre field consisting of permanent pasture.
HMA Construction Program Module 7 – Joint Construction.
AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt
Principles of Paving rev Principles of Paving.
Trimble 2D & 3D Paving Control System for Pavers
IRON WORKER PORTAFAB 45. SPECIFICATIONS 45-ton Punch Station (1-1/8" in 1/2") Keyed Punch Ram for Safety 4-1/4" Throat Depth 2" Die Holder Punch Nut with.
Paver System Five Control Box Overview Aug 2009 Control Box Overview Paver System Five.
HFA 2270 Series Gravity Roller Conveyor The Gravity Roller conveyor features a a low profile yet extremely rigid anodized extruded aluminum frame ● angle.
Surface Drainage Crown (flat A shape) c Dirt & Gravel: 1/2” - 3/4” per foot (4 - 6 inches in 10 feet)
Date Roadway Designer Resurfacing Restoration and Rehabilitation Kevin Jackson, Technical Director, TLI Bentley Systems, Inc.
© 2009 Bentley Systems, Incorporated Corey Johnson-Bentley Intersection Design with Roadway Designer.
Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009 AFB80 Session 404 January 12, 2009 Contractor Best Practices Transportation Research Board.
Equipment Setup GCS300 – GCS900 Components Presented By:
E4014 Construction Surveying Road Construction Plans.
Original 3D model received. Modify model for pattern Pattern boards are added to the model for pattern production The file is directly imported into ArtCam.
Trimble Grade Control Systems for Milling Machines and Cold Planers Presenters name.
Mr. DeBord Foundations of Agriculture I. Planer Safety:  Use industrial quality eye protection.
Presented by: Chuck Lawson, PE Roadway Designer and Machine Control – What You Need to Know.
Volvo Milling Machines
Presentation - Date (change on Slide Master) Paver System Five Slope Sensor Theory of Operation.
Basic knowledge Asphalt paving
© 2014 Bentley Systems, Incorporated Templates 202 Presented by: Chuck Lawson, PE Bentley Systems, Inc.
Module 3-4 Cold Milling. Learning Objectives  Describe the cold milling process  Describe the characteristics of typical milling equipment  Describe.
SAS Smoothtrac Theory of Operation rev Aug 2009 Paver System Five SAS Smoothtrac Theory of Operation.
SESSION 9 Construction Considerations. Objectives  Describe key aspects of: Prepaving operations Paving operations Postpaving operations  Understand.
Menu Interpenetration The drawing shows the part Plan and part Elevation of an interpenetration between two cylinders. Draw :- The completed Elevation.
PCS400 Quiz Phil Jackson Training Manager May 2009.
M&M Precast, Inc. Project: I-66 Highways for Life Location: Rt. 50 Ramp (East) off I-66 – Fairfax, Virginia VDOT Project No.: (FO) , M501 FHWA.
IRI T ESTING IN N ORTH C AROLINA Presented by Christopher Bacchi, PE Vice President, Trimat Materials Testing, Inc. Raleigh, NC.
PCS900 v1.0 3D Asphalt Paving Sales Presentation.
PCS900 AccuGrade 3D Paving Training 3D Design Models & SVO/AGO & TBC
CTCT PCS900 v1.10 Quick Start Guide Phil Jackson Training Manager March 2010.
© 2011 Autodesk CI6401-P - Corridor Deconstruction Peter Funk Autodesk, Inc.
Slope Formula. m = y₂ - y₁ x₂ - x₁ (x₁, y₁ ) and (x₂, y₂ ) Ordered pairs.
CITY OF GLENDALE, CA APRIL 2, 2015 BRAND BLVD, GARDENA AVE & ADJACENT STREETS – SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD.
Designed with the Paving Professional in Mind
2 By : Rathod Shakti Sinh En.No Raymangiya Mohit D. En.No Sangada Shukram K. En.No Savaliya Bhautik R. En.No
Tab 5 Measuring Techniques Field Sketch. Sketching and Diagramming.
Pavers & Mix Laydown Module 6. Pavers & Mix Laydown  Review paver components –Tractor –Screed –Grade and slope control  Operational principles of screed.
Benchwork IV –Hand Taps and Hand Reamers
Milling & Micro Milling
IDENTIFYING MAT FAULTS
3D Paving Training AutoAdjust
WAPA / WSDOT Joint Training
Solid Cylinder cut at an angle
CONSTRUCTING STRAIGHT LONGITUDINAL JOINTS
CONCRETE PAVEMENTS.
Transitioning to IRI for Pavement Smoothness
IENG 475: Computer-Controlled Manufacturing Systems
How to install pavers..
Write the equation of the line.
Tangent Section Typical Deep Mill
Tuesday, February 10 Find the slope of a line by the graph.
IENG 475: Computer-Controlled Manufacturing Systems
How Compaction Affects Smoothness
Manufacturing Processes
Presentation transcript:

APPLICATIONS MILLING MACHINE CONTROL SYSTEMS LAYOUT FOR SUPER-ELEVATED CURVES PAVER CONTROLS POTENTIAL PROBLEMS

USING MILL TO REMOVE AND PULVERIZE EXISTING SHOULDER

View of the Drum and Teeth

USING THE MILL TO ACHIEVE A SMOOTH RIDE IN URBAN AREAS

PROFILING ROADWAY 1” OVERLAY

DUNLAWTON AVE

CONTROL SYSTEMS SLOPE CONTROL ENDGATES AND THE YO-YO SWITCH SONIC GROUND SENSOR SINIC SKI

YO-YO SWITCH ATTACHED TO THE ENDGATE

SENSOR SETTING FOR DEPTH

MILLING CROSS-SLOPE

CROSS-SLOPE MILLING

CROSS-SLOPE REACTING TO SLOPE CHANGE

HOW THE MILLING OPERATOR CUTS A SUPERELEVATED CURVE

Milling around curves, manholes and multiple passes

PROBLEMS THAT CAN OCCUR ENDGATE/ SENSOR RUNS OFF UNEVEN SURFACE DAYLIGHT MILL DUE TO VARYING CROSS-SLOPE MILL INTO LIMEROCK BASE DROP-OFF BETWEEN ADJACENT TRAFFIC LANES EXISTING SHOULDER DOESN’T MATCH NEW FINISH GRADE USING WRONG STATION FOR START OF SUPERELEVATION

PAVING CONTROLS

THE CONTROL SYSTEM OPERATES A HYDRAULIC CYLINDER THAT CHANGES THE ANGLE OF ATTACK OF THE SCREED

A PAIR OF SCREWS ARE ALSO USED TO MANUALLY ADJUST THE THICKNESS OF THE PAVING

PAVER SLOPE CONTROL

SONIC SLOPE CONTROL

SKI POLE FOR PAVER

RIGID STRAIGHTEDGE