CIT 470: Advanced Network and System AdministrationSlide #1 CIT 470: Advanced Network and System Administration Data Centers.

Slides:



Advertisements
Similar presentations
Computer Room Requirements for High Density Rack Mounted Servers Rhys Newman Oxford University.
Advertisements

Small Computer Rooms by Tim Hogard Micro Data Centers on a Budget.
Cabinet Ventilation System: CVS 1200 Presented By Nick Bruno Director of Business Development.
Datacenter Health Check Terri-Lynn Thayer AVP/CIO, Computing & Information Services EDUCAUSE Enterprise Technology Conference, May 2007.
Objectives: Chapter 9: Data Centre Architecture VLAN definition and benefits * VLANs and broadcast domains * Routers role in VLANs * Types of VLANs * VLANs.
Refrigerators.
Poseidon 4002 Rack monitoring 1. Poseidon: Monitor & Control 2.
CIT 470: Advanced Network and System AdministrationSlide #1 CIT 470: Advanced Network and System Administration Servers.
CIT 470: Advanced Network and System AdministrationSlide #1 CIT 470: Advanced Network and System Administration Data Centers.
DATA Centers cs3353. Data Center A centralized location where computer related resources (and data) are stored. The users do not require physical access.
How to Build, Refresh, or Rebuild Your Datacenter on Time and Under Budget.
CIT 470: Advanced Network and System AdministrationSlide #1 CIT 470: Advanced Network and System Administration Upgrades and Maintenance.
CIT 470: Advanced Network and System AdministrationSlide #1 CIT 470: Advanced Network and System Administration Debugging.
IST 346 Chapter 6 Data Centers.  What is a datacenter?  Page 129, “ a data center is a place where you keep machines that are a shared resource”  A.K.A.
CIT 470: Advanced Network and System Administration
Cloud Computing Data Centers Dr. Sanjay P. Ahuja, Ph.D FIS Distinguished Professor of Computer Science School of Computing, UNF.
Maintaining and Troubleshooting Computer Systems Computer Technology.
Computer Security: Principles and Practice EECS710: Information Security Professor Hossein Saiedian Fall 2014 Chapter 16: Physical and Infrastructure Security.
Copyright Green Revolution Cooling
Thermal Management Solutions from APW President Systems
1 Lesson 3 Computer Protection Computer Literacy BASICS: A Comprehensive Guide to IC 3, 3 rd Edition Morrison / Wells.
Computer Room Experiences A medium sized tier-2 site view Pete Gronbech GridPP Project Manager HEPIX April 2012.
Managing a computerised PO Operating environment 1.
Data Center Design Christopher Geyer. A Data Center Highly secure, fault-resistant facilities housing equipment that connect to telecommunications networks.
Commodity Data Center Design
Steam Power Station Presented By Ashvin G. Patel Asst. Prof. (E.E.)
IST 346 Chapter 6 Data Centers.
Installing Virtualisation Software and Virtual Servers.
CIT 380: Securing Computer SystemsSlide #1 CIT 380: Securing Computer Systems Physical Security.
MAINTAINING AND TROUBLESHOOTING COMPUTER SYSTEMS UNIT 6.
High Density Cooling Air conditioning for high density applications
CIT 470: Advanced Network and System AdministrationSlide #1 CIT 470: Advanced Network and System Administration Help Desks.
Managing Computerised Offices Operating environment
Applying Precision Air Conditioning Systems
CIT 470: Advanced Network and System AdministrationSlide #1 CIT 470: Advanced Network and System Administration People.
Smart Grid: Opportunities in the Data Center January 22, 2010 Charles O’Donnell, Vice President, Engineering Liebert AC Power Emerson Network Power.
System Security Chapter no 16. Computer Security Computer security is concerned with taking care of hardware, Software and data The cost of creating data.
Progress Energy Corporate Data Center Rob Robertson February 17, 2010 of North Carolina.
CIT 470: Advanced Network and System AdministrationSlide #1 CIT 470: Advanced Network and System Administration Change and Configuration Management.
Infrastructure Gina Dickson – Product Manager Kevin Jackson – Sales Manager.
CIT 470: Advanced Network and System AdministrationSlide #1 CIT 470: Advanced Network and System Administration Data Centers.
CIT 470: Advanced Network and System AdministrationSlide #1 CIT 470: Advanced Network and System Administration Disaster Recovery.
Physical (Environmental) Security
CIT 470: Advanced Network and System AdministrationSlide #1 CIT 470: Advanced Network and System Administration Change and Configuration Management.
CIT 470: Advanced Network and System AdministrationSlide #1 CIT 470: Advanced Network and System Administration System Monitoring.
© Copyright 2011 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. HP Restricted Data Availability.
CIT 470: Advanced Network and System AdministrationSlide #1 CIT 470: Advanced Network and System Administration Data Centers.
High Availability Environments cs5493/7493. High Availability Requirements Achieving high availability Redundancy of systems Maintenance Backup & Restore.
Physical Security Concerns for LAN Management By: Derek McQuillen.
1 ITM 1.2 How IT Decisions Impact Data Center Facilities: The Importance of Collaboration Lars Strong P.E. Upsite Technologies, Inc.
This courseware is copyrighted © 2016 gtslearning. No part of this courseware or any training material supplied by gtslearning International Limited to.
Ventilation & Airflow NetShelter CX 18U,24U,38U Ambient office air is drawn in to the soundproofed air-intake chambers on either side of the NetShelter.
© 2012 MITSUBISHI HEAVY INDUSTRIES – MAHAJAK AIR CONDITIONERS CO., LTD. All Rights Reserved. Bad case of Installation RAC-B-A07.
CIT 470: Advanced Network and System AdministrationSlide #1 CIT 470: Advanced Network and System Administration Services.
By: Mike Nazzario. What is a Data Center?  Facility used to house computer servers for remote storage  Sensitive Data  Warehouse – room with a couple.
West Cambridge Data Centre Ian Tasker Information Services.
Chapter 14: System Administration Mark Milan. System Administration Acquiring new IS resources Maintaining existing IS resources Designing and implementing.
The Genome Sequencing Center's Data Center Plans Gary Stiehr
HOW NOT TO INCORRECTLY CARE FOR COMPUTER HARDWARE HANDLING AND STORAGE BY BLAINE AND ZACH.
CIT 668: System Architecture
CANOVATE MOBILE (CONTAINER) DATA CENTER SOLUTIONS
Unit 2: Chapter 2 Cooling.
NETW4005 COMPUTER SECURITY A
Data Center Service Brian Messenger 11/15/2016.
CIT 470: Advanced Network and System Administration
CIT 470: Advanced Network and System Administration
Physical Security.
CIT 470: Advanced Network and System Administration
Door Heat Exchanger: Specification
Presentation transcript:

CIT 470: Advanced Network and System AdministrationSlide #1 CIT 470: Advanced Network and System Administration Data Centers

CIT 470: Advanced Network and System AdministrationSlide #2 Topics Data Center: A facility for housing a large amount of computer or communications equipment. 1.Environment 2.Power 3.Racks 4.Blackbox

CIT 470: Advanced Network and System AdministrationSlide #3 Environmental Requirements Temperature: 64-72F (17-22C) Temperature inside case around 40F higher. Chips and hard disks fail around 120F. Humidity 35-65% Too low: static discharges. Too high: water condenses, short circuits. Power Reliable, conditioned power. Physical Security Prevent accidents, hacking, theft, vandalism.

CIT 470: Advanced Network and System AdministrationSlide #4 Environment Features HVAC: Heating, Ventilation, Air Cond UPS: Power conditioning, <1hr battery Generator: For long term power outages. Accessibility: For large equipment. Card Lock: SAs only, records entrances/exits. Fire Suppression System: Not water based. Humidity/Water Detection

CIT 470: Advanced Network and System AdministrationSlide #5 HVAC HVAC systems can fail due to Power loss. Coolant leakage. Mechanical failure. Detect HVAC failures early. Many HVACs have sensors to report failure. Temperature monitor in data center otherwise. HVAC maintenance n+1 redundancy to avoid immediate disaster. Usually handled by external contractor.

CIT 470: Advanced Network and System AdministrationSlide #6 Space Aisles Must be wide enough to move equipment. Hot spots Result from poor air flow. Servers can overheat when avg room temp low. Work space A place for SAs to work on servers. Desk space, tools, etc. Capacity Ensure that you have enough room to grow.

CIT 470: Advanced Network and System AdministrationSlide #7 Power UPS provides power. Generator provides auxiliary power. ATS switches to generator if building power fails. Liebert UPS and battery bank.

CIT 470: Advanced Network and System AdministrationSlide #8 Power Distribution Under floor power –Susceptible to water; requires water sensors. –Overhead power bus is preferrable. Overhead Power Bus –Drop power down to each rack individually. –Don’t run power cords between racks. –Each rack will have its own PDU.

CIT 470: Advanced Network and System AdministrationSlide #9 Power Distribution Units (PDU) Different power sockets can be on different circuits. Individual outlet control (pwr cycle.) Current monitoring and alarms. Network management (web or SNMP.) APC Power Distribution Unit

CIT 470: Advanced Network and System AdministrationSlide #10 The Power Problem Servers require much more power today. Blades allow more servers per square ft. Upgrades may have to wait for electricity. Power is a major data center cost –$5.8 billion for server power in –$3.5 billion for server cooling in –$20.5 billion for purchasing hardware in –Google, MS building centers near cheap power.

CIT 470: Advanced Network and System AdministrationSlide #11 Physical Security Keycard + code to restrict who can access. Biometrics are becoming popular alternative. Electronically log all accesses. Surveillance cameras. No windows. No floor/ceiling access.

CIT 470: Advanced Network and System AdministrationSlide #12 Racks 19” rack standard –EIA-310D –Other standard numbers. NEBS 21” racks –Telecom equipment. 2-post or 4-post 1U = 1.75 in Air circulation (fans) Cable management Doors or open

CIT 470: Advanced Network and System AdministrationSlide #13 Rack Purposes Organize equipment –Increase density with vertical stacking. Cooling –Internal airflow within rack cools servers. –Airflow determined by arrangement of racks. Wiring –Cable guides keep cables within racks. Power infrastructure –PDUs in racks distribute power to servers.

CIT 470: Advanced Network and System AdministrationSlide #14 Buying a Rack Buy the right size –Space for servers. –+ space for power, patch panel, etc. Be sure it fits your servers. –Appropriate mounting rails. –Shelves for non-rack mountable servers. Physical/environment security –Locking front and back doors if needed. –Sufficient power and cooling. –Power/environment monitors if needed.

CIT 470: Advanced Network and System AdministrationSlide #15 Wiring It’s important to be neat. –So you can get the cable for the right server. –Label both ends of each cable. Prewiring –Run power, net, serial cables when rack setup. –Greatly reduces time to setup a new server. Hiding messiness isn’t being neat. –Raised floors can hide cables. –Some sites don’t remove old cables to avoid accidentally taking down the wrong server.

CIT 470: Advanced Network and System AdministrationSlide #16 Project Blackbox Data Center in a shipping container. –Google –Sun PB of storage.

CIT 470: Advanced Network and System AdministrationSlide #17 References 1.“19-inch Rack”, u, “Top 5 Things to Keep in Mind When Buying a 19” Rack,” Mark Burgess, Principles of System and Network Administration, Wiley, Data Center Journal, “Data Center,” Aeleen Frisch, Essential System Administration, 3 rd edition, O’Reilly, Dan Goodin, “IT confronts the Data Center Power Crisis,” Hurgh, “Rack Layout,” “Project Blackbox,” Thomas A. Limoncelli and Christine Hogan, The Practice of System and Network Administration, Addison-Wesley, Evi Nemeth et al, UNIX System Administration Handbook, 3 rd edition, Prentice Hall, 2001.