Risk Management. If you don't actively attack the risks, they will actively attack you. -Tom Gilb Risk is the possibility of suffering loss, injury, disadvantage,

Slides:



Advertisements
Similar presentations
Project management.
Advertisements

Objectives To introduce software project management and to describe its distinctive characteristics To discuss project planning and the planning process.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Software Engineering COMP 201
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Project management l Organising, planning and scheduling software projects l Objectives To introduce software project management and to describe its distinctive.
1 SW Project Management (Planning & Tracking) Dr. Atef Z Ghalwash Faculty of Computers & Information Helwan University.
Lecturer: Sebastian Coope Ashton Building, Room G.18 COMP 201 web-page: Project.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 1 Slide 1 Project management.
©Ian Sommerville 2006Software Engineering, 8th edition. Chapter 5 Slide 1 Project management.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 COMP201 Project Management.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Chapter 4 Project Management “…a huge topic.” See Part 6, “Management”, Chaps.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Creator: ACSession No: 10 Slide No: 1Reviewer: SS CSE300Advanced Software EngineeringDecember 2005 Project Management CSE300 Advanced Software Engineering.
1 SOFTWARE PRODUCTION. 2 DEVELOPMENT Product Creation Means: Methods & Heuristics Measure of Success: Quality f(Fitness of Use) MANAGEMENT Efficient &
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Project management l Organising, planning and scheduling software projects l.
Project Management Hoang Huu Hanh, Hue University hanh-at-hueuni.edu.vn.
Risk Management in Software Projects
贾银山 Software Engineering, Chapter 5 Slide 1 Project management.
©Ian Sommerville 2000Software Engineering. Chapter 5 Slide 1 Chapter 5 Project Management “…a huge topic.” See Part 6, “Managing People”.
©Ian Sommerville 2006Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
1 Software Engineering Muhammad Fahad Khan Software Engineering Muhammad Fahad Khan University Of Engineering.
©Ian Sommerville 2000Software Engineering, 7th edition. Chapter 5 Slide 1 Chapter 5 Project Management Modified by Randy K. Smith.
 Probably the most time-consuming project management activity.  Continuous activity - Plans must be regularly revised.  Various different types of.
Project management DeSiaMore 1.
Project Risk Management: An Overview Andrew Westdorp Program Manger, IV&V Lockheed Martin (301)
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Concerned with activities involved in ensuring that software is delivered: on.
Lecture 3 Project Management (The Classical Approach) CSC301-Winter 2011 Hesam C. Esfahani
Chapter 2 Project Management Lecture 1 1Chapter 22 Project management.
Project Management & Planning
1 Chapter 5 Project management. 2 Project management : Is Organizing, planning and scheduling software projects.
©Ian Sommerville 2006Software Engineering, 8th edition. Chapter 5 Slide 1 Risk management.
Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Project management Lecture 10. Topics covered Management activities Project planning Project scheduling Risk management.
1 Risk Management. Risk concerns future happenings For today and yesterday, we are reaping what we sowed by our past actions/inactions Can we change today.
Object-Oriented Software Engineering
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Project management l Organising, planning and scheduling software projects.
Chapter 15: Risk Management
Chapter 22 – Risk Management 1Chapter 22 Project management.
©Ian Sommerville 2000 Slide 1 Project management l Organising, planning and scheduling software projects l Objectives To introduce software project management.
CSEM01 - wk8 - Software Planning1 Software Planning CSEM01 SE Evolution & Management Anne Comer Helen Edwards.
Project management.  To explain the main tasks undertaken by project managers  To introduce software project management and to describe its distinctive.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
COOP Seminar – Fall 2008 Slide 1 HOUSTON COMMUNITY COLLEGE SYSTEM SAIGONTECH SAIGON INSTITUTE OF TECHNOLOGY Software Project Management.
Project Management Yonsei University 2 nd Semester, 2012 Sanghyun Park.
Chapter 3 Project Management Chapter 3 Project Management Organising, planning and scheduling software projects.
Software Engineering, 8th edition. Chapter 5 1 Courtesy: ©Ian Sommerville 2006 Oct 13 th, 2008 Lecture # 6 Project management.
Software Engineering B.Tech IT/II Sem-II Term: Unit-7 PPT SLIDES Text Books:1.Software Engineering, A practitioner’s approach Roger s. Pressman.
1 Project management. 2 Topics covered Management activities Project planning Project scheduling Risk management.
Chap 4. Project Management - Organising, planning and scheduling
CSC 480 Software Engineering Lecture 5 September 3, 2004.
©Ian Sommerville 2000Software Engineering. Chapter 5 Slide 1 Chapter 5 Project Management “…a huge topic.” See Part 6, “Managing People”.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Project management l Organising, planning and scheduling software projects.
©Ian Sommerville 2000Software Engineering. Chapter 5 Slide 1 Chapter 5 Project Management “…a huge topic.” See Part 6, “Managing People”.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Project management 1/30/2016ICS 413 – Software Engineering1.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Chapter 4: Project management l Organising, planning and scheduling software.
Project management (2) By: Zhou Chunlin School of Tourism, Conference and Exhibitions Henan University of Economics and Law.
Project management. Software project management ■It is the discipline of planning, organizing and managing resources to bring about the successful completion.
Ashima Wadhwa.  Probably the most time-consuming project management activity.  Continuous activity from initial concept through to system delivery.
1 Project management Organising, planning and scheduling software projects.
Project management Chapter 5. Objectives To explain the main tasks undertaken by project managers To introduce software project management and to describe.
Project Management Chapter 4. Objectives Menerangkan fungsi seorang Project Manager. Menjelaskan fungsi pengurusan Projek Perisian Membincangkan Proses.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
COMP201 Project Management.
IS301 – Software Engineering V:
Project management.
Management. Management What is a risk? A risk is simply a probability that some adverse circumstance will actually occur.
Chapter 22 – Project Management
Presentation transcript:

Risk Management

If you don't actively attack the risks, they will actively attack you. -Tom Gilb Risk is the possibility of suffering loss, injury, disadvantage, or destruction.

Risk management is concerned with identifying risks and drawing up plans to minimise their effect on a project. Task of project manager is to anticipate risks which might affect the development schedule or quality of current project. The result of the risk analysis should be documented in the project plan. It should discussed.. Identify the risk and minimise their effect on the project is called RISK MAMAGEMENT.

Why Do Risk Management * Eliminate surprises * Prevent problems * Begin coding in right track * Reach business goal

Type of Risks It affect the project schedule or resources  Project Risk … PProduct Risk… => Business Risk…

Project Risks It affect the project schedule or resources  Staff turnover … MManagement Change… => Hardware Unavailability…

Product Risk It affect the quality or performance of the software being developed.  Requirement Change … DDelay in producing the specifications … SSize Underestimate … => Problem in CASE tools …

Business Risk It affect the organisation developing or procuring the software.  Technology Change …  Product competition (product line) …

The Process of Risk Management  Risk Identification … Identify project, product and business risks; isk Analysis … A ssess the consequences of these risks ; isk Planning … D raw up plans to avoid or minimise the effects of the risk; isk Monitoring … M onitor the risks throughout the project;

The Process of Risk Management

Risks Identification  Technology risks… Risks which derive from S/W or H/W technologies.. Used in the proj devlp (Tool Risk=S/w or CASE) PPeople risks. People in the dev team. OOrganisational risks. RRequirements risks. Change of customer requirements. =>Estimation risks. Org estimate the sys characteristics, required resources.

Risks Analysis Assess probability and seriousness of each risk. Probability may be very low, low, moderate, high or very high. Very low( < 10%). Low ( 10-25%). Moderate ( 25-50%). High (50-75%). Very high ( >75%). Risk effects might be catastrophic, serious, tolerable or insignificant.

Risks Planning Consider each risk and develop a strategy to manage that risk. That strategies are.. Avoidance strategies The probability that the risk will arise is reduced,(e.g.) it dealing with defective components Minimisation strategies The impact of the risk on the project or product will be reduced; Contingency plans If the risk arises, contingency plans are plans to deal with that risk;

Risks Monitoring Assess each identified risks regularly to decide whether or not it is becoming less or more probable. Also assess whether the effects of the risk have changed. Each key risk should be discussed at management progress meetings (review).

Presented By : J i j e s h N. S

Presented By : J i j e s h N. S