Construction Procedure. Identifying potential site Initial site appraisal Initial feasibility study Discussion with statutory bodies Detailed feasibility.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Contract Maintenance. Two Main Functions of the Collective Bargaining Agent Defining the relationship between the employer and the employee - Negotiations.
PUBLIC PRIVATE PARTNERSHIP (PPP) CONTRACT MANAGEMENT
September 21, 2009 Administration of Residential Acquisition and Relocation Programs: -Belford -Manchester Square.
Open Procurement Process Gauteng Provincial Treasury Process Mapping 30 th October 2014.
Constructionsite Construction Procedure Ron Gatepain.
Getting The Theory Down to Earth Project Plan Dubai September 2007.
Disposing of a Property Asset Russell Martoo Managing Director RCP Project Management – Development Management – Project Programming – Delay Claim Advisory.
Phases of A BOT Project Prepared By :Afaf Bu-khawa Course title: Technology Implementation,MGT 620.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
PUBLIC PROCUREMENT PROCESS
1 PROCUREMENT AUTHORITY AND RESPONSEBILITIES Dr. Fred Mugambi Mwirigi JKUAT.
1 RICS The Royal Institution of Chartered Surveyors London Quantity Surveying & Construction Faculty The Built Environment Group Corporate Professional.
Thriving communities, affordable homes Custom Build Briefing Newcastle City Council Self Build/Custom Build Event 17 November 2012 Victoria Keen Area Manager.
Bridge Engineering Section Bridge Rehabilitation.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Construction Construction is a discipline. It is a combination of Art Science S.W. Nunnally, Construction Methods and Management, 7th Edition, Pearson.
Current Design and Implementation Challenges of Road Projects on the Coastland Ron Rahaman Chief Roads and Bridges Officer Ministry of Public Works Works.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Specification & Quantities Estimating
Scottish Experience in Procurement and EIA of Roads EIA and Early Market Involvement IAIA 2007.
Diocesan Maintenance Scheme The Beginners Guide Ian Tomkin.
Lecture #2: The Design and Construction Team Professor: Robert Powell, AIA TA: Matt O’Brien, AIA August 20, 2008 AREN 231: Methods and Materials.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Report on the Challenges in the Planning and Procurement of Services for the Ceres and van Rhynsdorp Correctional Facilities Portfolio Committee on Correctional.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Procure Plus model 1. Scope 2. Kick start meeting 3. Initial surveys 4. Information for costs 7. Live on e-Procurement 6. Pre-contract meeting 5. Target.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
North-East Northamptonshire Project Highlight Report No. 5 Period January 2015 Thursday February 5 th 2014.
I N S T R U M E N T E S T R U C T U R A L E I N R O M A N I A Infrastructure Development in Romania Workshop.
Process of Planning, Designing and Financing a Hospital
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
Construction Eng 221 Project Management and Administration.
Coordination of Right of Way on Design-Build Contracts By- Richard Bennett State Right of Way Director Virginia DOT.
9 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2002 BG 16 P PE 018 Shoumen Water Cycle Improvements.
DUBLIN WASTE TO ENERGY - Project Update Matt Twomey Dublin City Council.
MISSION ORIENTED BUSINESS INTEGRATED SERVICES (MOBIS) ACQUISITION MANAGEMENT SUPPORT ORDERING GUIDE ACQUISITION PLANNING SUPPORT ACQUISITION DOCUMENT PREPARATION.
Decision required Home Complete Start Action 2014 Edition BLUEPRINT MAP KEY A start node that indicates where to begin the map Indicates the direction.
Design and buildTestShadowGo live Oct 15Nov 15Dec 15Jan 16Feb 16Mar 16Apr 16May 16Jun 16Jul 16Aug 16Sep 16Oct 16Nov 16Dec 16Jan 17Feb 17Mar 17Apr 17 Oct.
Jenny Lyon Quality Assurance Team
The realisation of the projects: "sine qua non" condition for the absorption of the EU Funds.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
TO DATE THREE FEASIBILITY STUDIES PASSED BY JOINT SPC AND FULL CITY COUNCIL GOVERNANCE STRUCTURE ADOPTED BY PROJECT BOARD CONSULTATIVE FORUMS SET UP DHPCLG.
Subrecipient Monitoring
The Design Team Carl James.
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Content of Tender Dossier - Instructions to Tenderers - Tenders
Architecture, Civil Engineer, and Interior Designer
RIBA Plan of Work 2013.
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Financing Land Development Projects
9/18/2018 Bids CONTRACTING Khamis…..
Contracting by Negotiation Process Map – Part 15 (1 of 3)
Sponsored Program Services Research Administration Primer
Pre-contract Planning and Practice
Engineering Project Tendering.
MODULE 2 – Project Introduction
Supplementary Services Project Management Services.
Developing of Licensing Process for NPP
Back Ground Information
Lecture 10 PROCUREMENT Ferdinand FASSA.
Water & Environmental Affairs
RIBA Plan of Work 2013.
Stoke Medical Centre RIBA Plan.
RIBA Plan Tom Robinson sir david Swindells Vii
FAR part 1.
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Construction Procedure

Identifying potential site Initial site appraisal Initial feasibility study Discussion with statutory bodies Detailed feasibility study Detailed site survey and soil inspection Contractual decisions

Detailed financial appraisal Scheme design Approval of scheme design Instruct consultants detailed design Approval of finalised scheme Planning negotiations Design team meeting

Planning application Planning consent/ refusal Planning Appeals Site acquisition Working drawings preparation Bills of Quantities preparation Building Regulations approval Putting out for tender

Site and contract administration Award contract Mobilization period Commence work on site Construction period Marketing Completion Hand over