AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE PV APPLICATIONS CODES AND STANDARDS EMERGENCY RESPONSE.

Slides:



Advertisements
Similar presentations
Subcontractor Electrical Safety & NFPA 70E
Advertisements

Solar Schoolhouse and San Mateo College Designing and Installing Solar Electric Systems Types of Solar Electric Systems For Technology Teachers San Mateo.
10 The Service Entrance. 10 The Service Entrance.
1 SOLAR SYSTEMS BASICS.  National Electric Code (NFPA # 70) for Photovoltaic Systems  Mechanical Code of New York State for Thermal Systems  Plumbing.
Emergency Lighting Code Review Presented by Iota Engineering LLC.
FIRE PUMP ELECTRICAL CONFIGURATIONS UNDER 600 VOLTS.
Guide to Network Cabling Fundamentals
Electrical Safety Training
Electrical Power Systems
Occupational Safety and Health Course for Healthcare Professionals.
Bonding, Grounding and the NEC  Presented by The National Association of Certified Home Inspectors
Master Examination Practice Drill # (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
Sustainable Energy Systems Engineering Peter Gevorkian Ch 2: Solar Power Generation Design Brevard Community College EST1830 Bruce Hesher.
Copyright 2005 Ted "Smitty" Smith Two Minute Drill Number Three Improving your skill in code Look Up Increasing Speed Drill.
Electrical Installation 2
Equipment Use In Occupancies  A receptacle shall not be grouped or ganged in enclosures with other receptacles unless they are so arranged so that voltage.
Two Minute Drill #10 Copyright 2005 Ted "Smitty" Smith.
Calculation Speed Drill # NEC
Electrical Safety in Construction. Objectives In this course, we will discuss the following: Common electrical hazards Standards relating to those hazards.
Smitty’s Speed Drills 2008 Code Drills Health Care Facilities (C) Copyright 2008 Ted "Smitty" Smith1.
Copyright 2005 Ted "Smitty" Smith Practice Code Look Up Two Minute Drill #6.
Copyright 2008 Ted "Smitty" Smith.  Left click on the presentation ICON located at the bottom of the slide directory to the left of the this slide. 
©Ted “Smitty” Smith This speed drill focuses on subjects that will be required for the journeyman and masters examination arranged by chapter of.
Solar Energy Technology Science Summer Camp Session 9: Fri 9:00 AM - 12:00 N : Field trip to Energy Masters and Installing/Commissioning the System.
Two Minute Drill Number 31- Residential Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith.
Power Systems DC Disconnects & Junction Boxes. Functions Overcurrent protection Solar Charge Controller PV Disconnect Solar Charge Controller Battery.
Objectives Review conductor and conduit selection Learn about protection systems (basic rules) Learn to design Residential Electrical Systems.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
Balance of Systems (BOS)
2008 Code Drills (C) Copyright 2008 Ted "Smitty" Smith 1 Smitty’s Speed Drills.
Electrical Safety Craig Shurson CSP, ARM Regional Loss Control Coordinator Hortica - The Florists Mutual Company.
Ag. Mechanics for Beginning Teachers
Battery Backup PV Systems Design Considerations
SERVICE ENTRANCE EQUIPMENT
Copyright 2008 Ted "Smitty" Smith Two Minute Drill Number 21- Residential Improving your skill in code Look Up Increasing Speed Drill.
PV System Design and Installation LO 10 Performance Analysis and Troubleshooting.
ELECTRICAL WIRING WIRING BASICS Written by Bobby Joslin
P RACTICE C ODE L OOK U P Two Minute Drill #7 Copyright 2005 Ted "Smitty" Smith.
SEC598F16 Photovoltaic Systems Engineering Session 12 PV System Components Inverters Balance of Systems (BOS) October 04, 2016.
NCTCOG Electrical Advisory Board
License Examination Practice Drill
Special-Purpose Outlets— Electric Heating, Air Conditioning
LCLS-II CRYOPLANT CONTROLS HARDWARE FINAL DESIGN REVIEW
2011 Changes Two Minute Drill
How to Design and Implement a Reliable PV System which could last 30+ years ZAKI IQBAL SENIOR R&D ENGINEER RAK RESEARCH AND INNOVATION CENTER.
Smitty’s Two Minute Drill Mixed Content -05
Practice Code Look Up Two Minute Drill #7
Catching up with Code: Updates from
Photovoltaic (PV) Systems
AFCI Protection: AFCI Receptacles and the NEC
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
EET 323 – Electrical System Design Lecture 4: Wiring Devices
Smitty’s Two Minute Drill #1: Feeders and Branch Circuits
Smitty’s Two Minute Drill Photovoltaic Systems
Overcurrent Protection— Fuses and Circuit Breakers
EET 323 – Electrical System Design Lecture 9: Grounding
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
Smitty’s Two Minute Drill Grounding and Bonding
2008 Code Drills Health Care Facilities
Smitty’s Two Minute Drill Services, Feeders, and Branch Circuits 1
Smitty’s Two Minute Drill Varied Number 7
FIRE ALARM DRILL 26 © Ted Smith 2017.
Smitty’s Two Minute Drill The BIG 5 Drill 1
Presentation transcript:

AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE PV APPLICATIONS CODES AND STANDARDS EMERGENCY RESPONSE

“Progress imposes not only new possibilities for the future but new restrictions.” Norbert Weiner, The Human Use of Human Beings, 1954 Objective To reference codes and standards as they relate to personnel safety and photovoltaic systems

Direct current photovoltaic conductor (wiring) is run outside a building membrane in metallic conduit CODES & STANDARDS Wiring Identification National Electric Code specifies that conductors of different output systems will be contained in separate raceways, cable trays, cable, outlet box, junction box, or similar fittings

System Disconnects The Uniform Fire Code specifies that the disconnecting means is accessible to the fire department In this system the inverter is flanked by two disconnects the right disconnects the array and the left disconnects the inverter from the main electrical panel CODES & STANDARDS

System Disconnects NEC requirements provides the detail for disconnecting all components and conductors in the system Disconnects can be located next to the meter, main electrical panel, the inverter, the controller, and the battery bank Each PV disconnect shall be permanently marked to identify it as a photovoltaic system disconnect CODES & STANDARDS

System Disconnect and Warning Labels CODES & STANDARDS

System Disconnects Importantly, a grid-tied PV system can operate as a stand-alone system to supply loads that have been disconnected from electrical production and distribution network sources You would find this arrangement in grid-tied systems in a battery back-up or generator back-up system CODES & STANDARDS

Low voltage DC systems often have larger wiring sizes compared to AC systems The circuit conductors and overcurrent devices are sized to carry not less than 125 percent of the maximum calculated currents Wiring exposed to the weather must be rated and labeled for outdoor use To reduce fire hazards, roof mounted PV systems, conductors, and components are all required to be grounded Wiring (Conductors) CODES & STANDARDS

Specific requirements are listed in the NEC for providing ground fault protection for PV systems and components Labels and markings applied near the ground-fault indicator at a visible location, stating that, if a ground fault is indicated, the normally grounded conductors may be energized and ungrounded In one- and two-family dwellings, live parts in photovoltaic source circuits and photovoltaic output circuits over 150 volts to ground shall not be accessible to other than qualified persons while energized Ground Fault Protection CODES & STANDARDS

Locating the grounding connection point as close as practical to the photovoltaic source better protects the system from voltage surges due to lightning Ground Fault Protection Exposed non–current- carrying metal parts of module frames, equipment, and conductor enclosures shall be grounded regardless of voltage Installer connecting ground wire to module frames. CODES & STANDARDS

In a PV module, the maximum system voltage is calculated and corrected for the lowest expected ambient temperature PV Modules This voltage is used to determine the voltage rating of cables, disconnects, overcurrent devices, and other equipment CODES & STANDARDS

In one and two-family dwellings, photovoltaic source circuits and photovoltaic output circuits are permitted to have a maximum photovoltaic system voltage of up to 600 volts Installations with a maximum photovoltaic system voltage over 600 volts shall comply with Article 490 PV Modules CODES & STANDARDS

A label for the photovoltaic power source will be provided at an accessible location at the disconnecting means for the power source providing information on: Operating current Operating voltage Maximum system voltage Short-circuit current PV Modules The rated capacity of the module is provided on the back of each panel CODES & STANDARDS

Storage batteries in a photovoltaic system should be installed in accordance with the provisions of NEC Article 480 Storage batteries for dwellings will have the cells connected to operate at less than 50 volts nominal Lead-acid storage batteries for dwellings shall have no more than twenty-four 2-volt cells connected in series (48-volts nominal) PV Batteries CODES & STANDARDS

Flooded, vented, lead-acid batteries with more than twenty-four 2-volt cells connected in series (48 volts, nominal) shall not use conductive cases or shall not be installed in conductive cases Conductive racks used to support the nonconductive cases shall be permitted where no rack material is located within 150 mm (6 in.) of the tops of the nonconductive cases Some batteries do require steel cases for proper operation as these battery types such VRLA or nickel cadmium can experience thermal failure when overcharged PV Batteries CODES & STANDARDS

Chapter 52, NFPA 1, Uniform Fire Code (2006) Valve-regulated lead–acid (VRLA) battery systems should have a listed device or other approved method to preclude, detect, and control thermal runaway Provide an approved method and material for the control of a spill of electrolyte Provide ventilation for rooms and cabinets in accordance with the mechanical code PV Batteries CODES & STANDARDS

Chapter 52, NFPA 1, Uniform Fire Code (2006) Provide signs on rooms and cabinets that contains lead–acid battery systems In seismically active areas, battery systems shall be seismically braced in accordance with the building code PV Batteries CODES & STANDARDS

During plan review ensure that there is adequate access to the roof for firefighting operations Fire Inspectors need to stay involved in the permit and plan review process Pass available building and PV information on to the operational section of your department Firefighters need to take this information and develop pre-emergency plans for these facilities Fire Service Responsibilities CODES & STANDARDS

SUMMARY Automatic and manual disconnects throughout the PV system allow firefighters to contain the electricity at the source Firefighters have successfully dealt with lead acid batteries and battery systems for decades The Building, Electrical, and Fire Codes ensure the safety for occupants and emergency responders