Valery Lesnykh and Børre Paaske 09 December 2010 RN3 - Risk Management of Major Hazards Phase 4 - Status report to Steering Committee.

Slides:



Advertisements
Similar presentations
Module N° 4 – ICAO SSP framework
Advertisements

Module N° 3 – ICAO SARPs related to safety management
Session No. 4 Implementing the State’s Safety Programme Implementing Service Providers SMS
Gavin Astin 06 May 2011 Study overview. Study Overview 06 May About DNV Independent foundation with around 9,000 employees. Det Norske Veritas.
Gavin Astin 29 September 2011 Study overview. Study Overview 29 September About DNV Independent foundation with around 9,000 employees. Det Norske.
Meeting the Environmental Challenge Accelerate Oil& Gas – Rio de Janeiro, 16 May 2012 Tommy Bjornsen – Director of Operation, South America.
NZ’s STATE SAFETY PLAN W hat the CAA has to do to implement its SMS CAA/AIA/GAPAN South Pacific Aviation Symposium on SMS Simon Clegg General Manager -
Barents 2020 Final Report RN01 “Co-ordination of Deliverables” Moscow 14 December 2011 Presented by Vladimir Vernikovskij, Russian Coordinator of RN01.
HSE’s Ageing and Life Extension Key Programme (KP4) and Human Factors
International Energy Agency Hydrogen Implementing Agreement Proposed Task on Hydrogen Safety.
©2006 OLC 1 Process Management: The Foundation for Achieving Organizational Excellence Process Management Implementation Worldwide.
Integration of Quality Into Accident Investigation Processes ASQ Columbia Basin Section 614 John Cornelison January 2008.
CAKE session no. 11 What is a major accident?. Feedbacks from last CAKE session Other activities we can arrange –Team buildings –Onshore seminars –Activities.
Chapter 3: The Project Management Process Groups
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO GENERAL RISK MANAGEMENT 2.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO HAZID 2.
4 4 By: A. Shukr, M. Alnouri. Many new project managers have trouble looking at the “big picture” and want to focus on too many details. Project managers.
Project Closure CHAPTER FOURTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Project Execution.
Project Management Body of Knowledge PMBOK
Opportunities & Implications for Turkish Organisations & Projects
“How Industry Learns” --- Proposed Project --- Karen Paulk, ConocoPhillips, Chair, Process Safety Group & Ron Chittim, API CRE Chairs & Sponsors Workshop.
Project Management Fundamentals Project Organization and Integration
Key changes and transition process
What is Business Analysis Planning & Monitoring?
Recommendation for structuring, editing and publishing of Phase IV deliverables in Russia, Norway and internationally III Russian – Norwegian Conference,
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
Basics of OHSAS Occupational Health & Safety Management System
Engaging with stakeholders: Adding value to the energy system 32nd Annual Conference of the International Association for Impact Assessment Porto Pedro.
VTT-STUK assessment method for safety evaluation of safety-critical computer based systems - application in BE-SECBS project.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
M. Mejlaender-Larsen 9th December 2010 Ice Management Operations Barents 2020, Phase 4, Working Group 6, Moscow.
Tor Svensen DNV-GL merger: increased safety focus Nor-Shipping press conference,
Russian Petroleum Safety Regulations Irina Fodchenko vit. ass., NIFS Startseminar NIFS-sjøsikkerhetsprosjekt Lysebu, januar 2008.
Wednesday 13 th February 2013 Ramside Hall, Durham Process Safety Management – Challenges for Implementation Allan Laing, CEO, Pentagon February 2013.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
Knut Ørbeck-Nilssen, Executive Vice President OilTech Atyrau April 2011 Deepwater Horizon Update – The aftermath Likely industry consequences and preliminary.
1 CAA Offshore Helicopter Review Mark Swan Group Director, Safety and Airspace Regulation.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Management & Development of Complex Projects Course Code MS Project Management Project Life Cycle & PM Process Groups Lecture # 4.
普 华 永 道 Phase 1: Project Preparation Phase 1: Project Preparation Phase Overview Phase Overview.
Hazards Identification and Risk Assessment
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
Develop Project Charter
Where We Are Now 14–2. Where We Are Now 14–2 Major Tasks of Project Closure Evaluate if the project delivered the expected benefits to all stakeholders.
Project preparation workshop “Bringing a transnational project to life” Project idea “Challenges and chances from Climate Change for regional and local.
ISO Current status of development ​ ​ ISO development process ​1​1.
Project Management Project Integration Management Minder Chen, Ph.D. CSU Channel Islands
Lars Ingolf Eide 03 August 2010 Barents 2020 Phase 4 - Working group RN02 Kick-off meeting Moscow August , 2010.
Ensuring the Safety of Future Developments
Barents 2020 Final Report RN01 “Co-ordination of Deliverables” Moscow 15 December 2011 Presented by Vladimir Vernikovskij, Russian Coordinator of RN01.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
OHSAS Occupational health and safety management system.
PM 586 ACADEMIC PROFESSOR/TUTORIALRANK For more course Tutorials
Project Management PTM721S
HSE Case: Risk Based Approach.
28 December 2018 Barents 2020 Phase 4 Working group RN07.
Barents 2020 Phase 4 - Working Group RN04
12 Safe Maintenance Rules
CR-GR-HSE-414 HSE Requirements for Pipeline Operations
CR-GR-HSE-302 Management of change
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Project Name Here Kick-off Date
Presentation transcript:

Valery Lesnykh and Børre Paaske 09 December 2010 RN3 - Risk Management of Major Hazards Phase 4 - Status report to Steering Committee

© Det Norske Veritas AS. All rights reserved. RN3 - Risk Management of Major Hazards 09 December Contents  Objectiv for RN 3 - Phase 4  Status  Feedback from Risk Assessment Seminar delivered 7.December  Further work in Phase 4 - Risk Management Seminar

© Det Norske Veritas AS. All rights reserved. RN3 - Risk Management of Major Hazards 09 December The key challenge identify assess manage risk

© Det Norske Veritas AS. All rights reserved. RN3 - Risk Management of Major Hazards 09 December Barents 2020 Phase 4 – Working Group 3 Members Russian teamNorwegian/OGP team V.V. Lesnykh, Gasprom VNIIGAZ - coordinator Andrey.A. Petrulevich, Gazprom VNIIGAZ Mikahil.V. Yaroshevich, Giprospetsgaz Vladimir.S. Safonov, Gazprom Dobycha Shelf Mikhail.V. Lisanov (S.N. Mokrousov), Industrial Safety Institute Dennis.V. Gordienko, FGU VNIIPO Emercom. Viktoria Smirnova, Gazprom Ekaterina Srebnyak, RF Maritime Rescue Service Sergey Gubkin, GNII Vladimir Nekrasov, EMERCOM Jerome Frindel, TOTAL Dmitry Kazakovtsev, BP Mark Young, Cairn Energy Odd Thomassen (observer),Norwegian Petroleume Safety Authority Børre Paaske, DNV - coordinator

© Det Norske Veritas AS. All rights reserved. RN3 - Risk Management of Major Hazards 09 December Scope of RN03 work in Phase 4  Task 1 – Outline and plan two risk management seminars  Task 2 – Prepare and carry out risk assessment seminar in arctic conditions/ workshop with focus on - experience exchange - comparative analysis of efficiency of methods and software - required databases to increase safety of offshore operations - practical application of risk assessment in the design process for offshore activities - 30 participants, technical experts, risk analysts, authorities  Task 3 – Prepare and carry out risk management seminar for offshore activites in the Barents Sea. - Emphasis on concrete cases typical for installations in the Barents Sea. - Cases reflecting both the usage of risk management and risk assessment in the development process. - Actual recent accidental events (e.g. Mexican Gulf) will be used to illustrate the risk management process partcipants, authorities, oil and gas company managers, designers  Task 4 – Proceedings/Position paper to document the contents of the seminar and the discussions that take place.

© Det Norske Veritas AS. All rights reserved. RN3 - Risk Management of Major Hazards 09 December What Can Go Wrong? Hazard Identification How Big? Consequence Analysis How Often? Frequency Analysis So What? Risk Assessment What Do I Do? Risk Mitigation What Do I Do? Risk Mitigation Risk Assessment Seminar – technical focus

© Det Norske Veritas AS. All rights reserved. RN3 - Risk Management of Major Hazards 09 December Risk Management Seminar – work processes and responsibilities Planning Improvements  HSE plan  Goals  Hazard identification  Risk assessment Execution Risk Management Monitoring  Operational control  Emergency preparedness  Performance measurement  Inspections  Audits  Management reviews  Mitigating measures HSE legal requirements

© Det Norske Veritas AS. All rights reserved. RN3 - Risk Management of Major Hazards 09 December Risk Management Seminar – work processes and responsibilities Planning Improvements  HSE plan  Goals  Hazard identification  Risk assessment Execution Risk Management Monitoring  Operational control  Emergency preparedness  Performance measurement  Inspections  Audits  Management reviews  Mitigating measures HSE legal requirements What Can Go Wrong? Hazard Identification How Big? Consequence Analysis How Often? Frequency Analysis So What? Risk Assessment What Do I Do? Risk Mitigation What Do I Do? Risk Mitigation

© Det Norske Veritas AS. All rights reserved. RN3 - Risk Management of Major Hazards 09 December Status and schedule  Status  Risk Assessment seminar and Risk Management seminar scoped  Risk Assessment seminar prepared and delivered (7.12)  Risk Managment seminar proposed scheduled for Dec  Schedule  Dec.2010 – May 2011: Draft Proceedings/position paper  Dec – Dec 2011: Plan and develop Risk Management Seminar  Dec. 2011: Deliver Risk Management Seminar  Jan. 2012: Final Proceedings/Position paper

© Det Norske Veritas AS. All rights reserved. RN3 - Risk Management of Major Hazards 09 December Topics for Seminar on Risk assessment of offshore activities in the Arctic, 7. December  Introductory lecture on risk assessment in arctic areas  Modelling and influence of safety barriers in risk assessments  North Sea databases on incidents, accidents, failure and reliability data for use in risk assessments.  Impact Criteria for personnel, safety functions and structures  Escape, Evacuation and rescue  Emergency preparedness and response  Reception at VNIIGAZ; informal dinner and continue discussion

© Det Norske Veritas AS. All rights reserved. RN3 - Risk Management of Major Hazards 09 December Safety Barriers A safety barrier is safety critical elements which shall prevent, control or mitigate a major accident. The product of technical, operational, and organizational conditions describe the barrier’s integrity.

© Det Norske Veritas AS. All rights reserved. RN3 - Risk Management of Major Hazards 09 December Risk Assessment Seminar - Summary  The importance of assessing the functionality of the safety barrieres and their influence onf the risk level, reflecting operational, technical, and organizational conditions  Use the risk assessment to improve and qualify the functionality of the safety barriers during the design process

© Det Norske Veritas AS. All rights reserved. RN3 - Risk Management of Major Hazards 09 December Focus areas in risk assessment seminar  Knowledge of QRA context; the main elements and deliverables for design phase  QRA is related to major accident risk.  Difference between onshore and offshore QRA  Specfic issues that an arctic QRA should reflect  How safety barriers are included in an offshore QRA  Main principles for managing explosion risk for arctic offshore installations  Risk Assessment of Escape, Evacuation and rescue  The link between Risk Assessment and Emergency response planning  How the QRA and related studies can be used to develop/enhance and qualify the design.

© Det Norske Veritas AS. All rights reserved. RN3 - Risk Management of Major Hazards 09 December Practicalities  Target group: Dedicated authority/industry/technical expert groups showing different perspective on the application of risk assessment - ”How vs. Why”  ”Buzz-groups” short discussions at tables to trigger questions  30 min break morning&afternoon  Course lecturers - Jo Hulbækdal, DNV - Inger Elise Bjørkedal, DNV - Børre Paaske, DNV

© Det Norske Veritas AS. All rights reserved. RN3 - Risk Management of Major Hazards 09 December Feedback and experience from Risk assessment seminar  Very good facilities and support from VNIIGAZ  Partcipants were active; a lot of questions and discussions  Ambitious cope – ran out of time; needed to cut some topics short  Positive feedback on the level of technical detail (need to keep technical focus)  30 participants  3 lecturers from DNV, one Russian speaking  Course material handed out in Russian and English

© Det Norske Veritas AS. All rights reserved. RN3 - Risk Management of Major Hazards 09 December Discussions during the day  Role of authotities; approval versus consent  Acceptance criteria for risk; own/defined by operators or authorities ?  Integrity and failure probabilities of safety barriers  Integrity and test criteria of fire walls and how to model this in risk assessment  Use of fault trees to define failure probabilities  Modelling of gas detector failures  Probability of failure of fire walls  How to transfer knowledge attained from risk assessment to the operations phase  Time limits for assessing hazardous impacts on personell  Comparison of risk modelling software applied in Russia and Norway  Etc…

© Det Norske Veritas AS. All rights reserved. RN3 - Risk Management of Major Hazards 09 December Next seminar – Risk Management  Technical excellence in risk assessment is not sufficient to ensure that risks are properly managed – need to implement the full management cycle to follow up and mitigate indentified risk.  Intention of the seminar is to anchor this understanding of the importance of risk management, and what risk management is.  This relies on examples from industry and authorities, to give the complete picture on ”how and why” to do risk management.  Need active contribution from B2020 sponsors, authorities and stakeholders in the next seminar to ensure real experience sharing. Findings from recent accidents in the offshore industry: Lack of risk understanding Insufficient learning from past/simialar incidents

© Det Norske Veritas AS. All rights reserved. RN3 - Risk Management of Major Hazards 09 December Next seminar – Risk Management Planning Improvements  HSE plan  Goals  Hazard identification  Risk assessment Execution Risk Management Monitoring  Operational control  Emergency preparedness  Performance measurement  Inspections  Audits  Management reviews  Mitigating measures HSE legal requirements  Technical excellence in risk assessment is not sufficient to ensure that risks are properly managed – need to implement the full risk management cycle to follow up and manage identified risk.  Intention of the seminar is to anchor this understanding of the importance of risk management, and what risk management is.  This relies on examples from industry and authorities, to give the complete picture on ”how and why” to do risk management.  Need active contribution from B2020 sponsors, authorities and stakeholders in the next seminar to ensure real experience sharing.

© Det Norske Veritas AS. All rights reserved. RN3 - Risk Management of Major Hazards 09 December Main topics for the Risk Management Seminar  Risk Management Cases from Russian and Norwegian offshore/arctic oil and gas industry - Application of the risk management principles - Risk Management as basis for decision making, definition and application of acceptance criteria and performance standards. - Risk Assessment as part of engineering/design process and development of platform lay-out and requirements to safety barriers  Interfaces between Risk Management and Regulatory regimes in the Barents Sea - NOR Operator and Safety Authority case to present: - Process of giving consent for operations - Internal control regime - Risk Tolerance criteria - Risk Based and functional regulations - Learnings from the Macondo blow out (GoM) wrt. regulative regimes  Learning from Cases studies/accident investigation reports

© Det Norske Veritas AS. All rights reserved. RN3 - Risk Management of Major Hazards 09 December Safeguarding life, property and the environment