Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 6 Project Time Management.

Slides:



Advertisements
Similar presentations
CP Chapter 4 Schedule Planning.
Advertisements

TIME MANAGEMENT 641 Topic 03 Activity Sequencing.
Work Breakdown Structures
Advanced Project Management - CPH
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
PMP/CAPM Prep Workshop Time
Chapter 6: Project Time Management
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Project Time Management
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Copyright 2008 Introduction to Project Management, Second Edition 1  Project time management involves the processes required to ensure timely completion.
BSBPMG503A Manage Project Time 6.5 Develop Schedule The process of analysing activity sequences, durations, resource requirements and schedule constraints.
Project Time Management
Importance of Project Schedules
CS Time Management (Part 9) Bilgisayar Mühendisliği Bölümü – Bilkent Üniversitesi – Fall 2009 Dr.Çağatay ÜNDEĞER Instructor Bilkent University, Computer.
Project Time Management
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
HIT241 - TIME MANAGEMENT Introduction
Software Project Management Task Sequencing Activity Sequencing Concepts PERT charts Critical Path Analysis.
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
P ROJECT M ANAGEMENT, PMI A PPROACH (PMP) P ROJECT T IME AND S CHEDULE M ANAGEMENT Sayed Ahmed BSc. Eng. in CSc. & Eng. (BUET, Bangladesh) MSc. in CSc.
BSBPMG402A Apply Time Management Techniques 1 Apply Time Management Techniques Week 6 Project Time Processes – Part 2 C ertificate IV in Project Management.
Scheduling Sequence & Time.
TIME MANAGEMENT Definition: Time management is a set of principles, practices, skills, tools, and systems that work together to help you get more value.
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
Quick Recap. Work Breakdown Structure (WBS): Set of activities to do (“use cases”) Formats of WBS Risk associated WBS Approaches for WBS Dependency Graph:
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Lecture 7. Review of Lecture 6 Project Scheduling: The process of defining project activities, determining their sequence, estimating their duration Scheduling.
Managing Project Resources. Project Resources Human Resources Project stakeholders: – Customers – Project team members – Support staff Systems analyst.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
Chapter 6: Project Time Management Information Technology Project Management,
1IT Project Management, Third Edition Chapter 6 Chapter 6: Project Time Management.
PMP, CAPM, PgMP, PMI-SP, PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Project Time Processes – Part 2 C ertificate IV in Project Management
Advanced Project Management Project Time Management Ghazala Amin.
Collecting requirements – Different methods Defining scope – Estimates for all resources Creating the WBS – Different approaches Verifying scope – Formal.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Project Time Processes – Part 1 C ertificate IV in Project Management
Project Time Management Ashima Wadhwa. Schedule Development – Determining start and finish dates for project activities – Without realistic dates, project.
Project Time Management
Reference: Figure 6.2. PMBOK® Guide, 5 h Ed Reference: Figure 6.2. PMBOK® Guide, 5 h Ed.
SOFTWARE PROJECT MANAGEMENT
Chapter 4 Note: See the text itself for full citations.
Reference: Figure 6.2. PMBOK® Guide, 5 h Ed Reference: Figure 6.2. PMBOK® Guide, 5 h Ed.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
BSBPMG503A Manage Project Time Manage Project Time Project Time Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit Code.
Project Time Management Based on PMBOK 5 th Edition Abdelrahman Sheta, PMP,ITIL 1PMP - Project Time Managementfacebook.com/Sheta.Page.
Chapter 4 MIS Project Management Lecturer Sihem Smida Sihem Smida Developing a project plan.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
Project Management – PTM721S
Introduction to Project Management Chapter 7 Managing Project Resources Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Time Management.
Project Management MGT 30725
Manage Project Time Project Time Processes Part 1 Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
Plan Schedule Management
Based on the PMBOK® Guide 3rd Edition
CHAPTER 6 PROJECT TIME MANAGEMENT
PROJECT TIME MANAGEMENT
Project Time Management
CIS12-3 IT Project Management
Project Time Management
Project Human Resource Management
Project Time Management
Project Time Management
Importance of Project Schedules
Project Management Project management is the discipline of organizing and managing resources in such a way that these resources deliver all the work required.
Project Time Management
CHAPTER 6 PROJECT TIME MANAGEMENT
Presentation transcript:

Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 6 Project Time Management

Contents n Introduction to Project Time Management n Activity Definition n Activity Sequencing n Activity Duration Estimating n Schedule Development n Schedule Control n Glossary

Introduction to Project Time Management n Includes the processes required to ensure timely completion of the project. n The major processes in developing the project time schedule are: – Activity Definition – Activity Sequencing – Activity Duraton Estimating – Schedule Development – Schedule Control

Activity Definition n Activity Definition – Identifying and documenting the specific activities that must be performed to produce the various project derivables and subderivables identified in the WBS n Inputs to Activity Definition 1. Work Breakdown structure 2. Scope statement 3. Historical information 4. Constrants 5. Assumptions 6. Expert judgment n Tools and Techniques for Activity Definition 1. Decomposition 2. Templates

Activity Definition (cont.) n Outputs from Activity Definition 1. Activity list 2. Supporting detail 3. Work breakdown structure update

Activity Sequencing n Definition – Identifying and documenting interactivity logical relationships. n Inputs to Activity Sequencing 1. Activity list 2. Product description 3. Mandatory dependencies 4. Discretionary dependencies 5. External dependencies 6. Milestones n Tools and Techniques for Activity Sequencing 1. Precedence diagramming method (PDM) (fig 6-2) 2. Arrow diagramming method (ADM) (fig 6-3) 3. Conditional diagramming methods 4. Network templates

Activity Sequencing (cont.) n Outputs from Activity Sequencing 1. Project network diagrams (fig 6-2 and fig 6-3) 2. Activity list updates

Activity Duration Estimating n Definition – Taking information on the project scope and resources and then developing durations for input to schedules n Inputs to Activity Duration Estimating 1. Activity list 2. Constraints 3. Assumptions 4. Resource requirements 5. Resource capabilities 6. Historical information 7. Identified risks

Activity Duration Estimating(cont.) n Tools and Techniques for Activity Duration Estimating 1. Expert judgment 2. Analogous estimating 3. Quantitatively based durations 4. Reserve time (contingency) n Outputs from Activity Duration Estimating 1. Activity duration estimates 2. Basis of estimates 3. Activity list updates

Schedule Development n Definition – Determining start and finish dates for project activities n Inputs to Schedule Development 1. Project network diagrams 2. Activity duration estimates 3. Resource requirements 4. Resource poll description 5. Calendars 6. Constraints 7. Assumptions 8. Leads and lags 9. Risk management plan 10. Activity atributes

Schedule Development (cont.) n Tools and Techniques for Schedule Development 1. Mathematical analysis  Critical Path Method (CPM)  Graphical Evaluation and Review Technique (GERT)  Program Evaluation and Review Technique (PERT) (fig 6-4) 2. Duration compression 3. Simulation 4. Resource leveling heuristics 5. Project management software 6. Coding structure

Schedule Development (cont.) n Outputs from Schedule Development 1. Project Schedule  Project network diagrams with date information added (fig 6-5)  Bar Charts or Gantt charts (fig 6-6)  Milestone charts (fig 6-7) 2. Supporting detail 3. Schedule management plan 4. Resource requirement updates

Schedule Control n Definition – Controlling changes to the project schedule n Inputs to Schedule Control 1. Project schedule 2. Performance reports 3. Change requests 4. Schedule management plan n Tools and Techniques for Scope Change Control 1. Schedule change control system 2. Performance measurement 3. Additional planning 4. Project management software 5. Variance analysis

Schedule Control (cont.) n Outputs from Scope Change Control 1. Schedule updates 2. Corrective action 3. Lessons learned

Glossary n Decomposition = Refinements n Mandatory dependencies = Hard logic n Discretionary dependencies =Preferred logic, Preferential logic, soft Logic n Milestones n Precedence diagraming method (PDM) n Activity-on-node (AON) n Arrow diagraming method (ADM) n Activity-on-arrow (AOA) n Critical Path Method (CPM) n Grafical Evaluation and Review Technique (GERT) n Program Evalutation and Revew Technique (PERT) n Top-down estimating n Reserve, contigency or buffer n Schedule baseline n Revisions

Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 6 Project Time Management