02/06/20141 WHAT ITEM IS COMPOSED OF ? INTEGRATION MODEL DETAIL MODEL SKELETON 3D ENVELOP PART 1 PART 2 PART XXX… EQUIPMENT ITEM INTEGRATION OFFICE RESPONSIBILITY.

Slides:



Advertisements
Similar presentations
UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR Sergey Kozub Institute for High Energy Physics Protvino, Russia SIS300 meeting 19 March, 2009 Sergey.
Advertisements

31 août 2011 Didier Laporte – LPNHE Paris 1 IBL Integration Stave Review Université de Genève.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
Design Office meeting Design office meeting.
CBM Superconducting Dipole Magnet
SuperFRS Multiplett and Dipole Vacuum Interfaces Multiplett: Insulation vacuum: Insulation Vacuum Pumping flanges: Two CF flanges of the size DN160 must.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
ATLAS EXPERIMENT INTEGRATION TASK: SPACE MANAGEMENT Tatiana Klioutchnikova 05/06/
PARAMETRIC MODELING 1.INTRODUCTION TO PARAMETRIC MODELING 2. BASIC FUNCTIONS 3. ADVANCED FUNCTIONS 4. PARAMETRIC AND SMARTEAM.
1. Equipment Owner Design Office (DO) Integration Office(IO) 2 CATIA FORUM03/06/2014 F. Valchkova - Georgieva.
ELENA LAYOUT MACHINE status. Stephane Maridor/ ELENA collaboration ELENA – LAYOUT machine WHO WE ARE ? HOW IT WORKS ? STATUS of ELENA LAYOUT MACHINE ACCESS.
Publication & CAD Data Navigator 2012 June CATIA Forum On behalf of PLM WG / CAD Services Stephane Bally, CERN/PH-CMX 2012 June CATIA Forum - Publication.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking.
ELENA Vacuum System R. Kersevan, TE-VSC-IVM R. Kersevan, “ELENA Vacuum System”, - ELENA Project Review, Oct14-15, 2013, CERN.
Considerations on laser-p+ beam merging for CB, BG, PM.
First Intégration kicker electrostatique LNR.ZDFA.0310 LNR.ZDFA.0610 SECTION 06 : AD_LM__ _ 0076AD_LM__ _ 0076 SECTION.
R.Leuxe13th CATIA FORUM – EDMS Page 1/24 Commercial & Normalized Components in 3D + Materials News and Reminders.
TCLDA Design status Collimation Upgrade Specification Meeting L. GENTINI.
Booster and Collider SC magnets. Design & prototyping of UHV and cryostat systems for Booster and Collider A.Smirnov JINR, Dubna, Russia NICA Machine Advisory.
FORUM - MARCH 2012 The FREESPACE Tool Excel BOM Extraction.
CATHI Final Review Meeting, September 2014E.Zografos1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Date 2007/Oct./25 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Report N. Ohuchi KEK 1.Cryomodule & Cryogenics KOM 2.GDE-meeting discussion I.Interface.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
NSLS-II Transfer Lines BUDKER INSTITUTE OF NUCLEAR PHYSICS NOVOSIBIRSK.
CLIC requirements on Warm Magnets (for CLIC Modules mainly) 1 M. Modena, CERN TE-MSC 13 April 2011 CERN-UK Collaboration Kick-off Meeting.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
Review on shorter PSB main bending magnets Injection layout with short magnets Advantages & Disadvantages Wim Weterings
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
EDMS – R.Leuxe 1/16 CAD Catalogs CATIA / Smarteam R20 Spring News.
Shielding review for temporary spectrometer for RUBICON experiment, ATF beamline #2 K. Kusche, M. Fedurin RSC meeting, Jan 20, 2015.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
09/21/07Shutdown’07 Week 7 F.G. Garcia1 MTA beam line installation Weekly Report September 21, 2007 Period covered: September 14 th September 21 th (Week.
HIE-ISOLDE Project 3 rd beam line + HELIOS June 16th 2015 (updated on June 18th) Y. Kadi, S. Maridor.
Fm "Field Line" Search Revisited Felix Meier "Field Line" Search Revisited Felix Meier GmbH7/16/20141.
Linac4 BCC 14/10/2010 Linac4 Measurement and Dump Lines BCC on the Linac4 Transfer Line Status.
Module layout and types Two-beam module review, September 2009 Module layout and types G. Riddone for the CMWG,
Two-beam module layout
Civil engineering reduction study Stephane Maridor Ref catia smarteam : ST _01.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
ELENA Integration F. Butin / ELENA collaboration.
First ideas on particle free installation of BESSY VSR
PANAGIOTIS FARANTATOS(TE/MSC-MNC)* WP3, ESR 4: New Magnet
Test of a Permanent Magnet Quadrupole Placed in a Dipole Field
Procurement, Measurement and Installation of 2 Octupoles for ATF
EHN 1 CO2 Leaks inside the beam lines
HIE-ISOLDE HEBT vacuum system
Development of the Canted Cosine Theta Superconducting Magnet
Configuration Management and Layout Database ELENA Project
Design of TIDVG#4 A. Perillo-Marcone (EN-STI).
M. Alcaide Leon, Paolo Fessia
Long Shutdown for the LHC: Vacuum Beam Pipes
M. Alcaide Leon, Paolo Fessia
Layout Drawings and Mechanical Assembly Drawings
Welded assembly General methodologie
Spectrometer Layout (Isometric View)
16 T dipole in common coil configuration: mechanical design
Conceptual Design of CEPC Interaction Region Superconducting Magnets
Compact and Low Consumption Magnet Design The DESY Experience
Update on the PSB Transfer Lines
FAIR magnets fiducialisation WP 7.5
دانشگاه شهیدرجایی تهران
تعهدات مشتری در کنوانسیون بیع بین المللی
SHMS Master Layout-Rays
Two-beam Test-stand Design and Construction Status
Simplified Procedure Draft
33nd CATIA Forum Moving from Component to a Product
FLEXIBLE CHAIN GEOMETRIC MODEL PROCESSING AND STUDY
Presentation transcript:

02/06/20141 WHAT ITEM IS COMPOSED OF ? INTEGRATION MODEL DETAIL MODEL SKELETON 3D ENVELOP PART 1 PART 2 PART XXX… EQUIPMENT ITEM INTEGRATION OFFICE RESPONSIBILITY DESIGN OFFICE RESPONSIBILITY Stephane Maridor CATIA FORUM Edms :

EQUIPMENT ITEM 02/06/20142 Example : -Magnetic equipment : dipole, quadrupole, etc… -Beam instrumentation equipment. -Vacuum equipment : beam pipe, valve, pump, etc… -Support equipment : dipole support, valve support, etc…. -Others…. Stephane Maridor CATIA FORUM SMARTEAM

SKELETON 02/06/20143 Y= BEAM AXIS PLANE X0Y : HORIZONTAL MACHINE, X NORMAL TO Y, DIRECTION INSIDE MACHINE X Z: NORMAL to PLANE XOY CONVENTION ORIGIN (0,0,0) at : -UPSTREAM POINT -MIDDLE POINT -other Stephane Maridor CATIA FORUM I. O. D. O.

DESIGN OFFICE RESPONSIBILITY SKELETON RULES - SKLT DEFINE THE AXIS REFERENCE OF EQUIPMENT (AXYS, ORIGIN POINT, OTHERS…..) - SKLT DRIVE THE POSITION OF EQUIPMENT IN MACHINE LAYOUT INTEGRATION OFFICE RESPONSIBILITY 02/06/ SKLT CAN CONTAIN PARAMETER OF EQUIPMENT (LENGTH, WIDTH,HIGTH,ETC…) INTEGRATION MODEL DETAIL MODEL Stephane Maridor CATIA FORUM USE THE SAME REFERENCE TO SWITCH EACH OTHER IN MACHINE LAYOUT ASSEMBLY

3D ENVELOP 02/06/20145Stephane Maridor CATIA FORUM

INTEGRATION MODEL SKELETON AT 0,0,0 ; R0;R0;R0 02/06/ SKELETON PUBLICATION HIDE SKELETON BEFORE SAVE ! Stephane Maridor CATIA FORUM

INTEGRATION MODEL 02/06/20147Stephane Maridor CATIA FORUM USED IN MACHINE LAYOUT

02/06/20148 DETAIL MODEL SKELETON AT 0,0,0 ; R0;R0;R0 + SKELETON PUBLICATION HIDE SKELETON BEFORE SAVE ! Stephane Maridor CATIA FORUM

02/06/20149 EXAMPLE ONE ITEM BY EQUIPMENT ! INTEGRATION OFFICE RESPONSABILITY DESIGN OFFICE RESPONSABILITY DETAIL MODEL 3D INTEGRATION Stephane Maridor CATIA FORUM

02/06/2014Stephane Maridor CATIA FORUM10 Thank you for your attention