Value Engineering How DOT’s uses this valuable tool in project development What is it When is it used How do we use it.
Advertisements

PROJECT RISK MANAGEMENT
Guidebook for Risk Analysis Tools and Management Practices to Control Transportation Project Costs Keith R. Molenaar, PhD Stuart D. Anderson, PhD, PE Transportation.
Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
Chapter 14 Schedule Risk Management Dr. Ayham Jaaron Second Semester 2010/2011.
2006 TEA Conference Terry Berends, PE Assistant State Design Engineer Washington State Department of Transportation Risk Based Estimating Tools at WSDOT.
Simplified Risk Management Planning for A Risk Management Process Overview presentation, which should take about.
Project Management Gaafar 2007 / 1 This Presentation is uses information from PMBOK Guide 2000 Project Management Risk Management* Dr. Lotfi Gaafar.
Project Prospectus and Design Acceptance Package ( and a little more) Alan Lively Project Delivery Specialist January 30, 2009.
Alternative Project Delivery
NEES Project Management Workshop June 16 June 18 1 Segment 2.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Risk Based Estimating Self Modeling Ovidiu Cretu, Ph.D., P.E. Terry Berends, P.E. David Smelser.
CEVP ® Cost Estimate Validation Process TEA Conference 2004 Jay Drye, P.E. Assistant State Design Engineer Monica Bielenberg, P.E. CREM Program Manager.
Risk Management Chapter 7.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Managing Risk to Reduce Construction Claims (And Improve Project Success) Presented by Laurie Dennis, PE, CVS-Life, FSAVE.
7-1 Risk Management Chapter 7 © 2007 Pearson Education.
Programming/BudgetEngineering.. Current WisDOT Policy and Guidelines : mega/mg-budget-est-mgmt.pdf
Don Cole Risk Assessment and Mitigation Project Management for ARA Engineers and Scientists.
Value Engineering. Definition Value Engineering (VE) is defined as a systematic process of review and analysis of a project, during the concept and design.
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
What is Business Analysis Planning & Monitoring?
2005 AASHTO Value Engineering Conference Using VE in Design Build Presented by: Jerry R. Blanding Innovative Contracting Engineer FHWA – NRC July 21, 2005.
S/W Project Management
PRM 702 Project Risk Management Lecture #28
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Project Risk Management. The Importance of Project Risk Management Project risk management is the art and science of identifying, analyzing, and responding.
9 Closing the Project Teaching Strategies
Project Risk and Cost Management. IS the future certain? The future is uncertain, but it is certain that there are two questions will be asked about our.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Chapter 10 Contemporary Project Management Kloppenborg
Risk Management - ACostE Kate Boothroyd FIRM Director, KB Risk Consulting Limited.
Risk Management for Technology Projects Geography 463 : GIS Workshop May
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
Management & Development of Complex Projects Course Code MS Project Management Risk Management Framework Lecture # 22.
PROJECT SCOPING FOR LOCAL AGENCY FEDERAL AID PROJECTS.
Chapter 7 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 7-1 Risk Management.
Yazd University, Electrical and Computer Engineering Department Course Title: Advanced Software Engineering By: Mohammad Ali Zare Chahooki The Project.
Management & Development of Complex Projects Course Code MS Project Management Perform Qualitative Risk Analysis Lecture # 25.
2013 NWHA CONFERENCE FERC’S RISK-INFORMED DECISION MAKING Doug Johnson – Regional Engineer - Portland From PFMA to Risk Assessment.
5-1 Lesson 5 | Common Issues & Challenges. Describe how RSAs address project schedule (time), project cost, and agency liability concerns. Explain the.
Subcommittee on Design New Strategies for Cost Estimating Research on Cost Estimating and Management NCHRP Project 8-49 Annual Meeting Orlando, Florida.
Develop Project Charter
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
BSBPMG504A Manage Project Costs 7.1 Estimate Costs Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of developing.
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
Initiation and Planning for Success Sridhar Seshagiri Rao, PMP Innova Solutions Inc. Santa Clara, CA. April 9 th 2004.
Project Risk Management Planning Stage
D.d. delivers district department of transportation d.d. delivers FAISAL HAMEED RONALDO T. NICHOLSON. P.E. Innovative Project Delivery Processes Innovative.
Yazd University, Electrical and Computer Engineering Department Course Title: Advanced Software Engineering By: Mohammad Ali Zare Chahooki The Project.
Chapter 3: Business Continuity Planning. Planning for Business Continuity Assess risks to business processes Minimize impact from disruptions Maintain.
February 24, 2015 Risk Based testing. February 24, What is Risk Based Testing? Process of focusing a project's testing activities on the most important.
Risk Managament in Software Engineering Abdul Serwadda.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
Copyright 2015 John Wiley & Sons, Inc. Project Planning Part II.
December 17,  MnDOT signed a highway easment in 1960 with US Steel  The TH 53 is over a ore deposit with shallow strippings, high iron and low.
Project management. Software project management ■It is the discipline of planning, organizing and managing resources to bring about the successful completion.
Chapter 3 Project Management Parts of this presentation is extracted from Ian Sommerville’s slides located at
Trigo White Ltd Practical project risk assessment VIII Conferencia Internacional Hotel Tivoli Oriente, Lisbon 28 th November 2014 Simon White Consultant,
Camera PDR/CD1 Planning 19 September 2008
Iterative Risk Management Workflow Tool
Value Engineering Study and Risk Assessment
Monitoring and Evaluation Systems for NARS organizations in Papua New Guinea Day 4. Session 12. Risk Management.
Project Management Institute
Risk Management for Technology Projects
PROJECT DELIVERY METHODS
Presentation transcript:

© 2011 HDR All rights Reserved. Value Engineering Ken L. Smith, PE, CVS (360) April 27 th, 2011

CURRENT LEGISLATION Section 106(e) of Title 23, United States Code, requiring Value Engineering analyses for each project on the Federal- aid system with an estimated total cost of $25,000,000 or more, or a bridge project with an estimated total cost of $20,000,000

Value Engineering is a tool used in project development Formal process that breaks components of a project into functions A multi-disciplined team of experts then identifies solutions that will satisfy the function Solutions must not sacrifice performance, reliability, quality or safety. What Is Value Engineering? “Price is what you pay. Value is what you get.” ~Warren Buffet

Value Engineering has traditionally been perceived as an effective means for reducing project costs. WHAT IS VALUE? This paradigm only addresses one part of the value equation, often times at the expense of overlooking the role that VE can play with regard to improving project performance.

Establishing the Goals and Objectives of VE Study is critical to its outcome. Defining “Performance Attributes” will give the VE Team a better understanding of the project’s purpose and need. Typical Highway Performance Attributes Mainline Operations Local Operations Maintainability Construction Impacts Environmental Impacts Project Schedule Reduce Risk PERFORMANCE ATTRIBUTES

ALTERNATIVE ANALYSIS OVERALL PERFORMANCE Perfor mance (P) % Change Perfor mance Cost (C) % Change Cost Value Index (P/C) % Value Improve ment Baseline500 $ Reduce Risk 5296%$ %2.246% 2Cost Estimate5000%$ %3.0242% 3Construction staging 56212%$ %3.3960% 4TH 14/15 I/C 61222%$ %2.6023% 5Median Barrier 60621%$ %2.5621% 6 Roadway between TH 15 & CSAH %$ %2.4114% 7Courtland I/C 5041%$ %2.162% 8Nicollet I/C 5031%$ %2.141% 9561st Intersection 59920%$ %2.5420% 10 Project phasing limits5112%$ %2.183% Total 54910%$ %3.4764%

WHAT TYPES OF VE STUDIES?  VE studies can be tailored to the needs of your project.  Typically 3-5 days long  A study can look at the entire project or just a specific design element or a portion of the project

WHAT IS THE BEST TIME?  VE can be applied at any time  Planning/Scoping  Start of Design (0%)  30% - 60%  90% (Constructability)  Design-Build

DURING PLANNING  Objective:  Review and improve upon the proposed alternatives  Develop alternatives to be further evaluated throughout the project development process  Assist in the environmental process

 Objective:  Conduct a thorough review and analysis of the key project issues using a multidiscipline, cross- functional team  Review and improve the proposed design by focusing on all or part of the project as defined by the project manager 0% – 60% DESIGN

 Objective:  Review project constraints to ensure they are adequately expressed in the plans and specifications.  Develop recommendations that will clarify intent and reduce risk and cost to the Owner. CONSTRUCTABILITY REVIEWS

DESIGN-BUILD u Objective: –Review performance specifications and project specific special provisions –Develop recommendations to minimize risk to the owner

Hercules Intermodal Transit Center Hercules, CA

I-15, West Mesquite Interchange Mesquite, NV CRAVE™

SR 193 Extension (CRAVE) Davis County, UT

Alternative Stormwater Quality

Recommendation #4 Filterra Stormwater Quality

Small street improvement project

SR 520, Floating Bridge & HOV Seattle, WA

Critter Crossings

Military Working Dog Kennel Joint Base Lewis-McChord, WA

CRAVE™ Award winning process CRAVE™ has won National Awards from the Society of Professional Engineers, ACEC, and AASHTO 23

 CRAVE™ is used to assist project delivery as well as minimize and mitigate quantified risks  CRAVE™ - innovative unique process  Cost Risk Analysis + Value Engineering  Combines these two tools to assist with project delivery  Outputs are:  Risk management plan  Value Engineering recommendations What is CRAVE™

25 Why we Created CRAVE™  Risk assessment workshops would provide valuable information about what could go wrong with my project but would fall short of providing solutions on what to do about it  Great ideas would come up during risk assessment workshops and would be set aside as potential VE ideas and not recorded  Value Engineering could add risk to delivering a project  The same team members are required for both process

26

27 Current Estimate = $179.17M Example Post-Mitigation + VE Recommendations

USING TORNADOS TO FOCUS VE

Traditional Vs. Risk-Based Approach Project Deterministic Estimate Fixed Contingency % Geotech 20% Enviro 40% ROW 30% 10% Unknown Project Base Cost

30 Assessment of Baseline Cost 30% Design 100% Design Construction Completion Percentage of Project Cost Project Development (Time) Unrecognized Cost Known but Not Quantified Known and Quantifiable (can include small uncertainty) Total Cost at Construction Completion Deterministic Estimate (with Allowance) Contingency Estimate at any point in time Project Plan & Concept PS&E > Ad

31 What is it about this project that keeps you awake at night? Risk Elicit Risks

32 Quantitative Risk

Goal of Risk Management  Risk Assessment’s aim is to assess potential impact of various scope, event, and budget risks on the project’s cost and schedule.  Risk Management’s aim is to identify opportunities and mitigation strategies to reduce both the likelihood of an event occurrence and the potential effect if it occurs. Probability of Occurrence Impact Initial Risk MANAGED RISK

34 QUESTIONS?