PROJECT SCOPE, SCHEDULE, AND RESOURCE MANAGEMENT

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

Project Management 6e..
MANAGEMENT OF ENGINEERING PROJECT MANAGEMENT
NEES Project Management Workshop June 16 June 18 1 Segment 3.
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Project Scope Management
Degree and Graduation Seminar Scope Management
Defining the Project CHAPTER FOUR Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Elisati Hulu. Definition  “a deliverable-oriented hierarchical decomposition of the work to be executed by the project team to accomplish the project.
Project Planning Dr. Jane Dong Electrical and Computer Engineering.
Chapter 5: Project Scope Management
Project Management Session 7
إدارة المشروعات Projects Management
Chapter 5: Project Scope Management
LSU 10/09/2007Project Schedule1 The Project Schedule Project Management Unit #4.
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
Work Breakdown Structure Workshop
LSU 07/24/2004Defining Project Tasks1 Defining the Project Tasks Project Management Unit, Lecture 4.
Project Scope Management J. S. Chou, P.E., PhD.
Project Management Education
Edward B. Farkas, Managing Director, Project Management Practice
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
PPMT CE-408T Engr. Faisal ur Rehman CED N-W.F.P UET P.
Lecture 5 Title: Project Time Management By: Mr Hashem Alaidaros MIS 434.
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
Information Technology Project Management
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
BSBPMG502A Manage Project Scope 5.3 Create Work Breakdown Structure The process of sub dividing project deliverables and project work into smaller, more.
Successful IT Projects slides © 2007 Darren Dalcher & Lindsey Brodie Successful IT Projects By Darren Dalcher & Lindsey Brodie
PLANNING AND SCHEDULING
Chap 4 Defining The Project.
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Basic of Project and Project Management Presentation.
Project Scope Management Project management Digital Media Department Unit Credit Value : 4 Essential Learning time : 120 hours.
Management & Development of Complex Projects Course Code - 706
DEFINING THE PROJECT CHAPTER 4.
Copyright 2008 Introduction to Project Management, Second Edition 2  Many people have heard the following sayings: ◦ If you fail to plan, you plan to.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
Apply Project Scope Management Techniques Project Scope Processes – Part 2 Certificate IV in Project Management Qualification Code BSB41507 Unit.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 4 Project Scope Management.
Work Breakdown Structure Kathy S. Schwaig. What is a Work Breakdown Structure (WBS)? A WBS is a logical hierarchy of work packages involved in a project.
Ch 4 - Learning Objectives Scope Management You should be able to: n Discuss the relationship between scope and project failure n Describe how strategic.
Work Breakdown Structure Use and Demo
PLANNING ENGINEERING AND PROJECT MANAGEMENT
GLOBAL SCHOOL OF PROJECT MANAGEMENT UNIVERSITY FOR INTERNATIONAL COOPERATION Ing. Osvaldo A. Martínez Gómez, MAP, MSc. Essential Topics - Project Management.
PRJ566 Project Planning & Management Work Breakdown Structure.
Software Project Management (SEWPZG622) BITS-WIPRO Collaborative Programme: MS in Software Engineering SECOND SEMESTER /1/ "The content of this.
SCOPE DEFINITION,VERIFICATION AND CONTROL Ashima Wadhwa.
Apply Project Scope Management Techniques Project Scope Processes – Part 2 Week 4 Certificate IV in Project Management Qualification Code BSB41507.
 Project Time Management includes the processes required to accomplish timely completion of the project  Part of Triple Constraints  Managers often.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
WBS Work Breakdown Structure © Unitec New Zealand.
SOFTWARE PROJECT MANAGEMENT
The Project Management Process Groups
Project Time Management Based on PMBOK 5 th Edition Abdelrahman Sheta, PMP,ITIL 1PMP - Project Time Managementfacebook.com/Sheta.Page.
What is a WBS? A Work Breakdown Structure is not a list of tasks, a schedule or an organization chart. Rather it provides the basis on which a task.
Creating a Work Breakdown Structure with Microsoft Project.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
In Information Management
Project Management.
Work Breakdown Structure
PROJECT SCOPE, SCHEDULE, AND RESOURCE MANAGEMENT
MGT 605: CH 04 Defining the Project.
PROJECT SCOPE, SCHEDULE, AND RESOURCE MANAGEMENT
PROJECT FINANCIAL MANAGEMENT BEST PRACTICES RICHARD MAGU
Presentation transcript:

PROJECT SCOPE, SCHEDULE, AND RESOURCE MANAGEMENT

TRIPLE CONSTRAINTS Project Management Triple Constraints or “Iron Triangle” is a model of constraints of project management

PROJECT SCOPE MANAGEMET

SCOPE MANAGEMENT PROCESSES Collect Requirements: Determining and documenting stakeholder needs Define Scope: Developing detailed description of project and product Create WBS: Subdividing project deliverables and project work into smaller, more manageable parts

WORK BREAKDOWN STRUCTURE (WBS)

WHAT IS WBS? Project Management Inctitute (PMI) defines WBS as: “A hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the required deliverables”

WHAT IS WBS? Wikipedia defines WBS as: “A work breakdown structure (WBS), in project management and systems engineering, is a deliverable oriented decomposition of a project into smaller components. It defines and groups a project's discrete work elements in a way that helps organize and define the total work scope of the project.” “A work breakdown structure element may be a product, data, service, or any combination.”

WBS TYPES Approaches to break activities into detail by: Product component approach Examples: Design documents, manuals, the running system Functional approach Analysis, design, implementation, integration, testing, delivery, reviews Geographical area Examples: TUM team, CMU team, off-shore team, ... Organizational approach Research, product development, marketing, sales

WBS LEVELS Each level of WBS represents an increasingly detailed definition of project WBS lays out the individual elements that will construct the project Each element must be numbered Lowest level elements are called “Work Packages”

WBS LEVELS AND NUMBERING Major project deliverables or activities are identified Codes assigned to each WBS component Level 0 - project itself Level 1 - major deliverables Level 2 - individual components of each deliverable Etc. Final level – work package

WBS NUMBERING SYSTEM 1.0 1.2 1.3 1.4 1.2.1 1.2.2 1.2.3 1.3.1 1.3.2 1.2.3.1 1.2.3.2 The project is the overall project under development Deliverables are major project components Sub-deliverables are supporting deliverables Work Packages are individual project activities

PRODUCT WBS

PROCESS WBS

WBS PURPOSE Project Scope: Shows all project activities that will be necessary to do Project Chart: Project organization shows structural hierarchy of project team. WBS shows structural hierarchy of project work to be done Project Time & Cost Estimation: Work packages are used to estimate time & cost, and they are rolled-up (aggregated) upwards Project Measurement & Control: Each work package is assigned a cost account, and its status is tracked

WBS DESIGN Top-Down Bottom-Up Both Top-Down & Bottom-Up Rolling Wave – greater decomposition occurs as project components becomes more defined over time Each level should contain around +/- 7 elements

WORK PACKAGE Work packages should contain activities that are short in duration (1 or 2 weeks) Work package activities can be completed by an individual or a small team All work packages should be similar in size or effort needed unless work package is being outsourced to another company

WBS REPRESENTATION Organization Chart (Tree-Structued like in previous examples) Indented List Bubble-Chart

PROJECT TIME MANAGEMENT

TIME MANAGEMENT PROCESSES Define Activities: Identify specific actions to be performed to produce project deliverables Sequence Activities: Identifying relationships among project activities Estimate Activity Resources: Estimate type of quantities of material, human resources, equipment, or supplies to perform each activity Estimate Activity Durations: Estimate number of hours to complete each activity Develop Schedule: Analyze activity sequences, durations, resource requirements, and schedule constraints to create schedule model

DEFINE ACTIVITIES Break down work packages into activities that provide a basis for estimating, scheduling, executing, monitoring, and controlling Activity definitions include description, name, identifier, WBS (Work Package) ID, predessor & successor activities, leads & lags, resource requirements, imposed dates, constraints, and assumptions, person responsible, etc.

ACTIVITIES IN MS PROJECT