PROJECT LIFE12 ENV/IT/000336 “Anti-infective environmental friendly molecules against plant pathogenic bacteria for reducing Cu” “AFTER Cu” Start: 01/01/2014.

Slides:



Advertisements
Similar presentations
Contents of the EHES Joint Action Hanna Tolonen EHES JA Kick-off meeting, 21 January 2010, Luxembourg.
Advertisements

Engr. Joselito M. Riego de Dios Philippine Strategy on Water Safety Plan Capacity Building and Scaling up Water Safety Conference 2010.
Reason and Motivation EpiLogic. FUNGAL DISEASES CAN RESULT IN CONSIDERABLE DAMAGE TO AGRICULTURAL AND HORTICULTURAL CULTIVARS. UNDER CERTAIN CIRCUMSTANCES.
1 PODEBA Use of poultry dejection for the bating phase in the tanning cycle Alice Dall’Ara– ENEA Sergio Sangiorgi - ENEA 12/06/ month meeting Elda.
YMIR is a Support Action funded by the European Union under the 7th Framework Programme YMIR IMPROVE.
LIFE+ Environment project: LIFE 09 ENV/GR/ Presentation of the LIFE+ project: Strategic Planning Towards Carbon Neutrality in Tourism Accommodation.
MID-TERM CONFERENCE 26 th January 2012 DISSEMINATION of the DE-LAN Project Activities and Collaboration David Cromar Erisa.
By Mohamed Al-Aawah Disaster Risk Reduction Programme UNESCO Cairo Office.
Activities carried out by ASTRA into the project from 1th January to 31th May.
LIFE13 ENV/IT/461 EVERGREEN Environmentally friendly biomolecules from agricultural wastes as substitutes of pesticides for plant diseases control Start:
PROJECT LIFE12 ENV/IT/00036 “Anti-infective environmental friendly molecules against plant pathogenic bacteria for reducing Cu” “AFTER Cu” Start: 01/01/2014.
Communication strategy and techniques to launch InnovMed Dr. Fatma H. Sayed Vienna meeting 25 June 2007.
LIFE12 ENV/IT/356 «RESAFE» « Innovative fertilizer from urban waste, bio-char and farm residues as substitute of chemical fertilizers» 6 MONTH MEETING.
LIFE12 ENV/IT/356 «BIONAD» «Naturalised dyes replacing commercial colorants for environmentally friendly leather dyeing and water recycle» Start: 01/01/2014.
EGEE is a project funded by the European Union under contract IST NA2 Dissemination John DYER Activity Leader All Activity Meeting, CERN 18.
Elda – Alicante (Spain)
WP 6 Dorota Pawlucka Progress Meeting Amersfoort,
EU project LIFE13 ENV IT / “EVERGREEN” “Environmentally friendly biomolecules from agricultural wastes as substitutes of pesticides for plant diseases.
LIFE12 ENV/IT/ «CLEANSED» «Innovative integrated methodology for the use of decontaminated river sediments in plant nursing and road building» Start:
EUROSPIN EURO pean S tudents’ P ress IN itiative Planning of Activities Timing of Project Work Deliverables Roles and tasks of the partners.
1 1 Final Meeting INESCOP PROJECT PROGRESS AND DISSEMINATION ACTIVITIES Pisa (Alicante) ICCOM-CNR 11th December 2013 Mercedes Roig Joaquín Ferrer INESCOP.
Ingenious-science.eu ECB National Needs Analysis Workshop – Israel Charmaine Kerr ECB Project Coordination.
LIFE THIRD COUNTRIES Development and Implementation of an Integrated System for the Control and Monitoring of the Urban Wastewater Treatment Plants in.
IN-NATURE LEONARDO DA VINCI Community Vocational Training Action Programme EDUCATION AND CULTURE “Nature and Rural Realm Interpreter: an innovative training”
Project overview: objectives, work programme & management guidelines FIRST MEETING OF EUROPEAN POLICY CORE GROUP Thursday, 03 March 2005 in Berlin PRESENTATION.
LIFE12 ENV/IT/ «CLEANSED» «Innovative integrated methodology for the use of decontaminated river sediments in plant nursing and road building» Start:
Progetto: LIFE11 ENV/IT/113 «BIOREM» «Innovative System for the Biochemical Restoration and Monitoring of Degraded Soils» Start: 01/01/2013 End: 31/03/2015.
E-PreS: Monitoring and Evaluation of Natural Hazard Preparedness at School Environments Stathes Hadjiefthymiades National Kapodistrian University of Athens.
11 18th Months Meeting INESCOP PROJECT PROGRESS & PLANNED ACTIVITIES Elda - Alicante (Spain) INESCOP 7th July 2015 Mercedes Roig Joaquín Ferrer INESCOP.
RECOMMEND 2nd Working summit Comp 2 „Communication & Dissemination“ Ingrid Rozhon 28th Nov 2012 Peterborough / UK.
Progetto: LIFE11 ENV/IT/109 «SOREME» «Low cost sorbent for reducing mercury emissions» Start: 01/01/2013 End: 31/12/ /01/ month progress meeting.
Quality System Assessment in Italy European Curricula for Economic Animator in the Enlarging Europe – ECONOMIC ANIMATOR PT04/PP/08/36/446.
Slide n°1 LIFE09 Kick-off Meeting Other LIFE Stakeholders The Monitoring Team Roles & Responsibilities LIFE09 Kick-off Meeting, 13 January 2011, Warsaw.
Collaborative Reformation of Curricula on Resilience Management with Intelligent Systems in Open Source and Augmented Reality Dissemination Activity (May.
ΕCOSHAZ E CONOMICS OF P REVENTION M EASURES A GAINST C OASTAL E ROSION SIGMA CONSULTANTS Ltd Tel
Role of the Secretariat The Secretariat will be responsible for the co-ordination and enhancement of research and networking activities within MariFish.
Southern African Pesticidal Plants Project Workpackage 1: Management & Communication.
1 RESAFE - Innovative fertiliser from urban waste, bio-char and farm residues as substitute of chemicals fertilisers Alice Dall’Ara – ENEA UTTMATF Sergio.
Tracking national portfolios and assessing results Sub-regional Workshop for GEF Focal Points in West and Central Africa June 2008, Douala, Cameroon.
LIFE13 ENV/IT/461 EVERGREEN Environmentally friendly biomolecules from agricultural wastes as substitutes of pesticides for plant diseases control Start:
LIFE13 ENV/IT/ ECODEFATTING Environmentally friendly natural products instead of chemical products in the degreasing phase of the tanning cycle Start:
LIFE12 ENV/IT/356 «RESAFE» « Innovative fertilizer from urban waste, bio-char and farm residues as substitute of chemical fertilizers» FINAL MEETING December,
WP6 – Dissemination Project Name: Enhancing Students Participation in Quality Assurance in Armenian HE- ESPAQ Ref TEMPUS BE-TEMPUS-SMGR.
EU project LIFE13 ENV IT / “EVERGREEN” “Environmentally friendly biomolecules from agricultural wastes as substitutes of pesticides for plant diseases.
Work Package 1: Progress and Focus on specific issues 5th Steering Committee Meeting Rijeka, 26/2/2015 Presented by: Mrs Maria Poulou.
LIFE12 ENV/IT/356 «BIONAD» «Naturalised dyes replacing commercial colorants for environmentally friendly leather dyeing and water recycle» Start: 01/01/2014.
Project LIFE13 ENV/IT/ “Environmentally friendly biomolecules from agricultural wastes as substitutes of pesticides for plant diseases control” “EVERGREEN”
LIFE12 ENV/IT/356 «BIONAD» «Naturalised dyes replacing commercial colorants for environmentally friendly leather dyeing and water recycle» Start: 01/01/2014.
LIFE12 ENV/IT/356 «BIONAD» «Naturalised dyes replacing commercial colorants for environmentally friendly leather dyeing and water recycle» Start: 01/01/2014.
Collaborative Reformation of Curricula on Resilience Management with Intelligent Systems in Open Source and Augmented Reality Dissemination Activity (updated.
EU project LIFE13 ENV IT / “EVERGREEN” “Environmentally friendly biomolecules from agricultural wastes as substitutes of pesticides for plant diseases.
LIFE13 ENV/IT/461 EVERGREEN Environmentally friendly biomolecules from agricultural wastes as substitutes of pesticides for plant diseases control Start:
Ministry of Finance National Strategic Reference Framework Communication Strategy 20 June 2008 Second NSRF Monitoring Committee Zornitsa Arsenieva Advisor.
LIFE14 ENV/IT/113 HORTISED "Demonstration of the suitability of dredged remediated sediments for safe and sustainable horticulture production" Progress.
PROJECT LIFE12 ENV/IT/ “Anti-infective environmental friendly molecules against plant pathogenic bacteria for reducing Cu” “AFTER Cu” Start: 01/01/2014.
Exploitation means to use and benefit from something. For Erasmus+ this means maximising the potential of the funded activities, so that the results are.
WP8 DISSEMINATION AND COMMUNICATION Przemysław Dana ASM – Market Research and Analysis Centre.
LIFE12 ENV/IT/356 «BIONAD» «Naturalised dyes replacing commercial colorants for environmentally friendly leather dyeing and water recycle» Start: 01/01/2014.
EU project LIFE13 ENV IT / “EVERGREEN”
Brussels, Belgium, 27th January 2016 International Projects
Project Coordination Group (PCG) for the implementation of the MSFD
Civil Protection Financial Instrument – Prevention Projects
A Proposal for a Regional Gender Statistics Programme in Africa
IENE Intercultural Education of Nurses in Europe
Background CRiteria for the IDentification of Groundwater thrEsholds: BRIDGE Co-ordinator: BRGM (Fr) Groundwater Characterisation workshop, 25 June 2004.
EU project LIFE13 ENV IT / “EVERGREEN”
A Proposal for a Regional Gender Statistics Programme in Africa
Aurora Hoxha & Drini Imami
Preparatory meeting for the establishment of the Project Coordination Group (PCG) for the implementation of the MSFD 13 November :00-13:30 European.
Institutional arrangements
Presentation transcript:

PROJECT LIFE12 ENV/IT/ “Anti-infective environmental friendly molecules against plant pathogenic bacteria for reducing Cu” “AFTER Cu” Start: 01/01/2014 End: 31/12/ , January 22nd I st year Meeting Faenza ASTRA premises

PROJECT LIFE12 ENV/IT/ AGENDA I st year meeting TECHNICAL & PROGRESS MEETING 15:00 [ASTRA] Welcome and opening of the meeting 15:05 [All] Actions carried out by each partner (please prepare a ppt presentation and include After-Cu logo and LIFE logo in each slide) and scheduled activities from June 2014 until the end of December :30 [All] Open discussion on actions carried out 17:00 [All] After-Cu Technical future issues: o [DISPAA] Technical activities scheduled in the next six months of the project o [All] Open discussion on actions to be carried out in the next six months of the project 17:30 [DISPAA] Management and dissemination issues 17:50 [All] General questions 18:00 End of progress meeting

PROJECT LIFE12 ENV/IT/ AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ Technical Actions carried out by each partner in the last six months  B.2: Demonstration of the qualitative and quantitative yields of conventional chemical synthesis and biotechnological synthesis of the anti-virulence peptides at laboratory scale  B.3: Demonstration of the chemical and biological stability of anti-virulence peptides produced by conventional chemical and biotechnological synthesis  B.4: Demonstration of Kilo-scale biotechnological synthesis of the anti-virulence peptides by recombinant technology  B.5(close start): Demonstration of the null toxicity profile of the anti-virulence peptides on model organisms and microorganisms  B.6 (close start): Demonstration of the anti-virulence peptides in vivo performances at pilot scale level in field screenings  B.7 (close start): Demonstration of the effectiveness of the anti-virulence peptides in the presence of contamination by copper compounds at pilot scale level in field screenings. AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ Technical Actions carried out by each partner in the last six months  C.2: Monitoring of the in vitro anti-virulence performances of peptides at laboratory level  C.3: Monitoring of the absence of side effects for the anti-virulence peptides on common targets of any living organism at laboratory level  C.4 (start): Monitoring of the absence of a direct selection operated by the anti- virulence peptides towards the emergence of bacteria resistant to the anti-virulence peptides themselves at laboratory level  C.5 (start): Monitoring of the short term environmental benefits from the use of the anti-virulence peptides in plant disease control at pilot scale level in field screenings  C.6 (start): Monitoring of the absence of an indirect selection operated by the anti- virulence peptides on copper compound and antibiotic resistant bacteria at pilot scale level in field screenings. AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ Presentations of each beneficiary  CEBAS CSIS  ICCOM CNR  ASTRA  SOLDANO  DISPAA. AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ Presentation of  DISPAA instruments and data referred to B2-B7 C2-C6 D actions. AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ AFTER Cu – 1° year meeting Faenza – 2015, January 2015 Psn (0,5) + Agro_Ap17 C-

PROJECT LIFE12 ENV/IT/ AFTER Cu – 1° year meeting Faenza – 2015, January 2015 Psn (0,05) + Agro_Li27 C-

PROJECT LIFE12 ENV/IT/ AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ AFTER Cu – 1° year meeting Faenza – 2015, January 2015 ….evaluated by Congo Red bioassay

PROJECT LIFE12 ENV/IT/ AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ SAME STRATEGY APPLIED FOR AP17 AND Other PEPTIDES WORK In progress AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ [All] Open discussion on actions carried out. AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ Dissemination actions D1 Demonstration workshop in Italy (last 6 months) D2 Demonstration workshop in Spain (last 6 months) D3 Project website (end M3) D4 Notice boards (end M3) D5 Layman's report (last 3 months) D6 Diffusion material preparation D7 Articles and press releases D8 Networking D9 After Cu technology manual (last 9 months) D10 Demonstration workshop, seminars, conferences and other events D11 Dissemination to Institutions and policy makers D12 After-LIFE Communication Plan (last 3 months) D13 International fairs and other events D14 Digital supports for international diffusion AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ Dissemination actions carried out by each partner in the last six months AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ AFTER Cu Technical issues for the next six months… towards project conclusion..  B.2: Demonstration of the qualitative and quantitative yields of conventional chemical synthesis and biotechnological synthesis of the anti- virulence peptides at laboratory scale  B.3: Demonstration of the chemical and biological stability of anti-virulence peptides produced by conventional chemical and biotechnological synthesis  B.4 : Demonstration of Kilo-scale biotechnological synthesis of the anti- virulence peptides by recombinant technology  B.5: Demonstration of the null toxicity profile of the anti-virulence peptides on model organisms and microorganisms  B.6 : Demonstration of the anti-virulence peptides in vivo performances at pilot scale level in field screenings  B.7: Demonstration of the effectiveness of the anti-virulence peptides in the presence of contamination by copper compounds at pilot scale level in field screenings AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ AFTER Cu Technical issues for the next six months towards project conclusion..  C.2: Monitoring of the in vitro anti-virulence performances of peptides at laboratory level  C.3: Monitoring of the absence of side effects for the anti-virulence peptides on common targets of any living organism at laboratory level  C.4: Monitoring of the absence of a direct selection operated by the anti- virulence peptides towards the emergence of bacteria resistant to the anti- virulence peptides themselves at laboratory level  C.5: Monitoring of the short term environmental benefits from the use of the anti-virulence peptides in plant disease control at pilot scale level in field screenings  C.6 : Monitoring of the absence of an indirect selection operated by the anti- virulence peptides on copper compound and antibiotic resistant bacteria at pilot scale level in field screenings  C.7 (start ) Monitoring of technical-socio-economic assessment of the After- Cu project AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ After-Cu Technical future issues for the next six months and Open discussion on actions to be carried out in the next six months of AFTER Cu project AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ AFTER Cu Dissemination issues for the next six months Discussion and Planning AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ ADMINISTRATIVE ISSUES  Next Deliverables  Partner costs January 2015  Next meeting AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ Partner costs January 2015 AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ Courtesy of E.Colombi, 2012 AFTER Cu – 12 month meeting ASTRA – 2015, January 22nd Happy 1° birthday to AFTER Cu!

PROJECT LIFE12 ENV/IT/ AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ AFTER Cu – 1° year meeting Faenza – 2015, January 2015

PROJECT LIFE12 ENV/IT/ AFTER Cu – 1° year meeting Faenza – 2015, January 2015