F.Millet - Preparation Meeting for the FCC International Collaboration BoardSeptember 9, 20141 / 5 CEA-Grenoble Contribution New challenges for the FCC.

Slides:



Advertisements
Similar presentations
Technical Committees – the Brains of ASHRAE Section 1.0 — Fundamentals and General.
Advertisements

February 9, 2002 Muon Collaboration Technical Board Michael Iarocci E951 Cryogenics1 Cryogenic Cooling System for the E951 Pulsed Solenoid Magnet Basic.
ITER Cryoplant System Status
Raffael‘s Sixtinische Madonna in der Galerie Alte Meister in Dresden.
CEA-Grenoble / DSM / DRFMC / Service des Basses Températures / B. rousset1 24/04/2007 LHC cooling scheme magnet 1 bar 4.2 K Pressurized HeII bath Vapour.
DISTRIBUTED CRYOGENIC COOLING WITH MINIATURIZED FLUID CIRCUITS Steffen Grohmann, ETT/TT RD39 Collaboration ST Workshop 2003 CERN, April 01-03, 2003.
0/11TU Dresden – CERN FCC – Sept 2014 Nelium as Refrigerant for the Beam Screen and Current Lead Cooling of the FCC Fakultaet Maschinenwesen, Institut.
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
Broader Approach Activities toward Fusion DEMO Reactors IT/E-2 IAEA 21 st Fusion Energy Conference (Chengdu 17 th October, 2006 ) Shinzaburo Matsuda Japan.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
SOFT 2004 OVERVIEW OF CRYOGENIC TECHNOLOGY FOR THE THERMONUCLEAR FUSION P. DAUGUET, M. BONNETON, P. BRIEND, F. DELCAYRE, B. HILBERT, A. RAVEX Air Liquide.
1 Cryogenic in Fusion Devices” Kavita Rathore MTech – NST Delhi University.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Workshop on cryogenic and vacuum sectorisations of the SPL CERN, 9 th -10 th November 2009 Workshop Organisation and Goals Vittorio Parma TE-MSC.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 Francis Perez WP4 Cryogenic Beam Vacuum System Conception EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Cryo Beam Vacuum Objectives,
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
Modeling and simulation of cryogenic processes using EcosimPro
KIT Objectives in Fusion by 2020 Workshop on the European Fusion Roadmap for FP8 and beyond April 13 – 14, 2011; IPP Garching.
Robert Aymar’s 75th birthday celebration colloquium at CERN A. Grosman 1/ 25 1 Tore Supra : Physics, Technology… and Strategy André Grosman Institut de.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
Status of ITER collaboration for Machine Protection I. Romera On behalf of the colleagues who contribute to the project Thanks to: Sigrid, Markus, Rüdiger,
Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.
a magnetic refrigeration stage
1 Association Euratom-CEA P. Libeyre Pioneering superconductivity 23rd SOFT, Venice 21 September 2004 PIONEERING SUPERCONDUCTING MAGNETS IN LARGE TOKAMAKS.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Cryogenics for crab cavities – SPS/LHC 2 nd HiLumi LHC meeting – Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team.
1 Cryogenic Design and the 4 He Evaporative Purifier David G. Haase, et al., North Carolina State University.
SLHC-PP WP7 8 April 2008 Structure SLHC- PP WP7 SLHC-PP Steering Group SPL Study Group DESY Peters INFN ? CERN Scrivens / Hofle STFC- RAL Faircloth CEA.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
TE-CRG Activities D. Delikaris, TE-CRG.
J. G. Weisend II for the ESS Team Energy Efficiency & Recovery at ESS.
EXTRACTION OF HIGH VOLUME CRYOGENIC HEAT LOAD
Carles Colldelram EuroCirCol Kick of meeting, CERN 03/06/2015 CERN March’15 EuroCirCol Kick of meeting Study Beam Induced Vacuum Effects.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
17-18 December 2013 LARP VTF Workshop BNL Proposal 1 A.Marone
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
Global Collaborations Towards LHC Crab Cavity J. P. Koutchouk Thanks to Rama Calaga and Rogelio Tomas Crab Cavity Validity Requirement Workshop August.
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Magnetic Refrigeration down to 1.6K for FCC_ee Jakub Tkaczuk Supported by: DRF Energy Program – DESA41K CERN FCC Collaboration Francois Millet, Jean-Marc.
Cryovessel Engineering David Haase, Jan Boissevain, Ernie Ihloff WBS long lead time items Cryovessel Dilution Refrigerator Helium Liquefier.
FCC Infrastructure & Operation Update on the cryogenics study Laurent Tavian CERN, TE-CRG 28 October 2015.
Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Industrial contributions to the maintenance of CERN.
Study and Development of Large Cryogenic Systems in China
M Chorowski, H Correia Rodrigues, D Delikaris, P Duda, C Haberstroh,
Installation of an Instrument on a CERN machine
Innovative He cycle Francois Millet.
Uppsala Commitment to ESS and FREIA Planning
Status of work on the cryostat design
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
SPS cryogenic proximity equipment and SM18 validation
Dynamic simulations: a useful tool for cryogenic installations
Ways to industry participation in CLIC 24th October, 2017
Hollow e- lens, Cryogenic aspects
CRYOGENICS OPERATIONS 2008 Organized by CERN
on behalf of FCC cryogenic team
ILC Cryogenic Systems Draft EDR Plan
Question 1) Are two ports current leads?
Section 1.0 — Fundamentals and General
FRESCA Cryostats Outer cryostat during pressure test at the manufacturer Top plate and lambda plate for the outer cryostat Inner cryostat during reception.
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
Mathew C. Wright January 26, 2009
Summary Slide (OV/1-1) PROGRESS OF ITER-INDIA ACTIVITIES FOR ITER DELIVERABLES-Challenges and mitigation measures What are the major developments? A functional.
FCC Week 2019 ( ) V. Mertens IOWG
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
Presentation transcript:

F.Millet - Preparation Meeting for the FCC International Collaboration BoardSeptember 9, / 5 CEA-Grenoble Contribution New challenges for the FCC cryogenic system François Millet on behalf of CEA-Grenoble cryogenic team September 10, 2014 See Roy Aleksan presentation « CEA and FCC » for other CEA contributions

F.Millet - Preparation Meeting for the FCC International Collaboration BoardSeptember 9, / 5 Cryogenics at CEA-Grenoble for more than 50 years from Fundamental Research to Applications Fundamental Research Universities, Research Institutes … Finalized Research Prototyping, Tests Bed … Realization & Valorization CERN, ESA, ITER & BA, Industry …

F.Millet - Preparation Meeting for the FCC International Collaboration BoardSeptember 9, / 5 CEA-Gre Contributions to the LHC project Superfluid Helium as High-Field Magnet Coolant Pioneered at CEA-Grenoble in the 1970’s and Implemented in the Tore Supra Tokamak in the 1980’s LHC Cooling Scheme Studies & Validation Heat Transfer Measurements & Modeling in the 1990’s Development & Tests of LHC Cryogenic Components (1,8 K pump, sub-cooling heat exchangers) in the 1990’s Design, Specifications & Commissioning of the 1,8 K Refrigeration Units Industrial Manufacturing (Air Liquide / IHI-Linde) in the 2000’s Alternative Cooling Architecture for the High-Luminosity Upgrade of the LHC (FP7 – HILUMI LHC Design Study) From Research Studies to LHC Commissioning

F.Millet - Preparation Meeting for the FCC International Collaboration BoardSeptember 9, / 5 On-going Contributions for Large-scale Helium Refrigerators Mitigation Study of Pulsed Heat Loads for ITER and JT-60SA high-field magnets Modeling and Experimental Validation Development of Advanced Control Strategy Supply of the JT-60SA Cryogenic System (Japanese Tokamak – ITER BA) Conceptual Design, Optimization, Specifications & Follow-up of Industry Fundamental Research on Turbulent Flow (I3-EuHIT) and Critical Heat Flux High Reynolds Number & Heat Flux Present Activities for Large-scale Helium Refrigeration

F.Millet - Preparation Meeting for the FCC International Collaboration BoardSeptember 9, / 5 Possible Contributions from CEA-Grenoble  Identification of Present Process and Component Limits  Development of New Technologies or Architectures  Improvement of Reliability and Efficiency New Challenges & CEA-Grenoble Contribution New challenges for the FCC Cryogenic System  Study & Developments of Larger Refrigerators -Towards 1 4,5 K with high efficiency and reliability -Mainly Dynamic Heat Loads around 50 K from Beams -Superfluid Helium Refrigeration

F.Millet - Preparation Meeting for the FCC International Collaboration BoardSeptember 9, / 5 Thanks for your Attention Questions ?