M. Mariotti Padova University/INFN, CTA meeting Berlin 3-4 May 2006 >1 m 2 metallic mirror technology AIM find a suitable technology for large reflecting.

Slides:



Advertisements
Similar presentations
Mirror and Lens by Rifki Irawan. a surface, such as polished metal or glass coated with a metal film, that reflects light without diffusion and produces.
Advertisements

Mock-Up Test For Optical Diagnostics MERIT VRVS Meeting April 12 th, 2006 By Thomas Tsang (BNL), Hee Jin Park (SUNY at Stony Brook) Thanks to Bill Sands.
Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
All-aluminum mirrors for the MAGIC Cherenkov Telescope
Machining Two introductory projects 1.Support post for mirror mount 2.Vertical micro-rail mount.
Telescope Tear-Down Anatomy of a 114mm f/8 Newtonian Reflector.
Chapter 32Light: Reflection and Refraction. Electromagnetic waves can have any wavelength; we have given different names to different parts of the wavelength.
Old Main Group. Design Issues There are no changes to the overall Design It will remain the way it is The Attachment Issue is resolved Going to screw.
1- Pipsqueak Engine Millwork on uprights and base.
MAGIC II Mirrors and reflector M. Doro Udine. MAGIC Collaboration Meeting. 2006/05/10-13.
Astronomy for beginners Telescopes By Aashman Vyas.
Group S3. Lab Session 5 Following on from our previous lab session decided to find the relationship between Disparity vs Camera Separation. Measured Disparity.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
Measuring Instruments
Spherical Mirrors - Starter
Formation of Images by Spherical Mirrors
Manufacturing a Telescope. Input A telescope consists of an optical system (the lenses and/or mirrors) and hardware components to hold the optical system.
Setup of laser tracker on DX side NOTE: X axis along M1s centers, towards SX Z axis along M1-M2 centers, towards M2.
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
Geometrical Optics (Lecture II)
Lathe and drilling machines
March 2, 2007 R. Mirzoyan: CTA Paris Meeting; Mount & Mirror WG Report Mount and Mirror (MM) Working Group Report Presented by Razmick Mirzoyan On behalf.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
The Reflective Surface of the MAGIC Telescope Michele Doro on behalf of the MAGIC Collaboration University of Padova & INFN
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
Physics 1C Lecture 26A.
 Mirrors that are formed from a section of a sphere.  Convex: The reflection takes place on the outer surface of the spherical shape  Concave: The.
Dr. Andrew Tomasch 2405 Randall Lab
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
Lathe and drilling machines
LASER AND ADVANCES IN METROLOGY
3/4/ PHYS 1442 – Section 004 Lecture #18 Monday March 31, 2014 Dr. Andrew Brandt Chapter 23 Optics The Ray Model of Light Reflection; Image Formed.
Basic Bowl Turning. 1. Draw circle on top of board. 2. Cut to size on band saw. 3. Sand one surface of the bowl and the top o the waste block that is.
The Hobby-Eberly Telescope Mirror Alignment Recovery System Marsha Wolf Graduate Student UT Astronomy Department.
Today’s topic Alignment Polarization Mechanism 1.
The Reflective Surface of the MAGIC Telescope Michele Doro on behalf of the MAGIC Collaboration University of Padova & INFN
Status of RICH mechanical design at PNPI E.Vznuzdaev for PNPI group: V.Dobyrn, A.Khanzadeev, E.Kormin, V.Lebedev, N.Miftakhov, V.Polyakov, V.Samsonov,
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
Zian Zhu The Tension/Pitch Machine Status and Anode Panel Measurements The Strip Capacitance Meter Status and Measurements Production Readiness Review.
Senior Design Ideas Team INASAD Members: Jose Medina Joseph Leone
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
Mass Simulator Concepts Robert Besuner 12 October 2005.
5/7/2007 TS_CLIC_AB M.Taborelli, TS-MME High precision machining and metrology for structures: achievements and open questions M.Taborelli.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
MAGIC II Mirrors Features Production Calendar M.Doro for the Padova group MAGIC Collaboration Meeting Sofia May, (2007)
J. H. Burgea,b, W. Davisona, H. M. Martina, C. Zhaob
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
IRD Proposal – 31/01/2011 Evaluation of the first proposals Done with the Legal experts at IN2P3 (European division) Compliance with European rules (and.
The ASTRI prototype: a pathfinder Dual-Mirror telescope for the CTA-SST array Rodolfo Canestrari for the ASTRI collaboration INAF-Astronomical Observatory.
Camera Motion System Requirement Design Details FEA.
Machining Skills Flexible Manufacturing.
BM&N STS ladders assembly in VLHEP
Geometric Optics Figure Mirrors with convex and concave spherical surfaces. Note that θr = θi for each ray.
Update on Pavia MM mechanical prototype
Chapter 32Light: Reflection and Refraction
Surface Grinding Operations
IR Detector - Test cryostat : Machining
Slicer development Eric Prieto LAM.
Ongoing and to do work M.Lenti.
LumiCal mechanical design, integration with LDC and laser alignment
Laser engraving machine the light path adjustment
Professional Development session: Alignment and Operation of computerized telescope for astronomy instructor Ricky Tsui EDUC 630.
APPLICATIONS OF REFRACTION AND TOTAL INTERNAL REFLECTION
Geometric Optics.
(Preliminary) WIYN 0.9 Meter Collimation Procedure
Ultra-efficient installation solutions
Presentation transcript:

M. Mariotti Padova University/INFN, CTA meeting Berlin 3-4 May 2006 >1 m 2 metallic mirror technology AIM find a suitable technology for large reflecting surfaces reduce the overall cost with respect the current tecnology Improve or maintain the actual optical quality Avoid the use of panels for Active Mirror Control Develop technologies for very large reflectors

M. Mariotti Padova University/INFN, CTA meeting Berlin 3-4 May 2006 Technology used for MAGIC I: raw blank prduction

M. Mariotti Padova University/INFN, CTA meeting Berlin 3-4 May 2006 Magic I technology: pre-milling Front plate Honeycomb sandwich

M. Mariotti Padova University/INFN, CTA meeting Berlin 3-4 May 2006 Current technology: Diamond milling

M. Mariotti Padova University/INFN, CTA meeting Berlin 3-4 May 2006 Panel assembling in Eching Cabling of the mirror for internal heater Adjustment legs screwed on the mirror 2 mirrors mounted on a panel

M. Mariotti Padova University/INFN, CTA meeting Berlin 3-4 May 2006 Pre-alignment of a mirror in a panelA panel in the alignment tripod

M. Mariotti Padova University/INFN, CTA meeting Berlin 3-4 May 2006 Alignment tools Artificial parallel beam source Rotating tripod for panel alignment

M. Mariotti Padova University/INFN, CTA meeting Berlin 3-4 May mirrors spots after the pre-alignment close to the virtual center of the MAGIC camera Final spot of a panel after The precise alignment of the mirrors Final alignment

M. Mariotti Padova University/INFN, CTA meeting Berlin 3-4 May 2006 Large single mirror vs 4 small mirrors in a panel 50 cm mirrors 1 m mirror AMC motors 4 mirrors: better optics more labor + expensive panel needed hand made first aligment (+?) many high tech elementsto build a panel Diamond turning prooven technology Single large mirror: Astigmatism important at large radii Self supporting ->no panel needed No manual alignment necessary Big labor for the premilling Diamond turning OK

M. Mariotti Padova University/INFN, CTA meeting Berlin 3-4 May 2006 Ongoing R&D in Padova Built 1m mirror with native spheric shape ⇒ aluminum sandwich glued on a spheric mould mould Mirror box + honeycomb Front plate

M. Mariotti Padova University/INFN, CTA meeting Berlin 3-4 May 2006 Ongoing R&D in Padova Built 6 “1mx1m” mirror with native spheric shape ⇒ aluminum sandwich glued on a spheric mould

M. Mariotti Padova University/INFN, CTA meeting Berlin 3-4 May 2006 Ongoing R&D in Padova 6 Prototype produced in 2005: Light weight : <18 Kg, to be installed in the telescope without any support panel.

M. Mariotti Padova University/INFN, CTA meeting Berlin 3-4 May 2006 Diamond milling of 1M mirror

M. Mariotti Padova University/INFN, CTA meeting Berlin 3-4 May 2006 Diamond milling first round - Good reflectivity - Bad sphere ~ donuts: - Error in the alignment of Diamond tool

M. Mariotti Padova University/INFN, CTA meeting Berlin 3-4 May 2006 Diamond milling second round Almost a perfect sphere. The rigidity of the new mirrors and the tune-up of the milling machine are now delivering very good results: The technique is

M. Mariotti Padova University/INFN, CTA meeting Berlin 3-4 May 2006 Impact of 1m 2 in the reflector optical quality

M. Mariotti Padova University/INFN, CTA meeting Berlin 3-4 May mirrors mounted in the MAGIC frame for test

M. Mariotti Padova University/INFN, CTA meeting Berlin 3-4 May 2006 Production time: raw blanks = 4/day Diamond Polishing= (1 + /day in pipeline)*#machine => 10m**2/week Cost for 250 pieces (magicII): Raw+polishing= =>~2500 €/m**2 Production time & costs