CONSTRUCTION BLUEPRINT READING

Slides:



Advertisements
Similar presentations
CONSTRUCTION BLUEPRINT READING
Advertisements

The Electrical GuruTM Paul W. Abernathy,CME
Network Design Issues Design and Documentation Prepared by: Aline L. Mendoza.
Telecommunication Rooms
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
Chapter 29 Electrical Plans. Chapter 29 Electrical Plans.
 E4 Electrical Installation #1 Power Distribution.
ADT490 TroubleShooting Locating Grounds A. 2 Introduction ‣ Fire Alarm Panels cannot tolerate grounds ‣ A ground on any fire alarm circuit is detected.
Blueprint Reading, Scaling, and Areas Loren Arford and Christine Blaisdell October 20, 2010.
CONSTRUCTION BLUEPRINT READING
Telecom Cabling Grounding and bonding.
ADT490 TroubleShooting Locating Grounds A. 2 How are the Circuits Installed ‣ Before looking for the actual location of a fault on a circuit, look at.
FIRE PUMP ELECTRICAL CONFIGURATIONS UNDER 600 VOLTS.
Chapter 19 Electrical Plans.
Guide to Network Cabling Fundamentals
EET Survey of Electronics
Electrical Power Systems
Domestic Installation: Switch Circuits
© 2011 Ericson Manufacturing, Willoughby, Ohio
Structured Cabling Overview
Bonding, Grounding and the NEC  Presented by The National Association of Certified Home Inspectors
1 PBX installation considerations BASIC TELECOMMUNICATIONS.
INTRUSION ALARM TECHNOLOGY
CONSTRUCTION BLUEPRINT READING
Panels and Subpanels. Main Service Panel aka Load Center The Load Center is the heart and soul of a home’s electrical system. It: – Serves as a distribution.
GROUNDING.  Why ground?  Types of Grounding methods  Telecom grounding system  Bonding in Telecom room  Materials for grounding and bonding.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
1 of 15 Coleman Cable, Inc. Copyright © 2006 All Rights Reserved. FIRE ALARM CABLE Objectives By end of this module you should able to: Know What Really.
By Carlin Bright. Electricity The flow of electrons in a conductor.
Copyright 2005 Ted "Smitty" Smith Two Minute Drill Number Three Improving your skill in code Look Up Increasing Speed Drill.
HVACR116 – Trade Skills Mechanical Drawings.
INTRUSION ALARM TECHNOLOGY
Electrical Power J. Mitchell for AE-210. What Does Electrical Power Do? Provides Energy for Buildings Provides Energy for Buildings Usually all except.
Construction Drawing Occupational Safety and Fundamentals
1 Guide to Network Cabling Fundamentals Chapter 5.
©Ted “Smitty” Smith This speed drill focuses on subjects that will be required for the journeyman and masters examination arranged by chapter of.
1 Air Conditioning Breaker Panels and Disconnects.
Home Electrical Systems. Behavior Objectives  Define the basics of Electrical Systems  Explain the basic principles of Electricity.  Describe the different.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
Electrical Power Distribution. Forms of Energy All forms of energy fall under two categories POTENTIAL Stored energy or energy of position (gravitational)
Electrical Power Distribution. Forms of Energy All forms of energy fall under two categories POTENTIAL Stored energy or energy of position (gravitational)
COMMUNICATIONS AND CONTROL SYSTEMS. Interior Designer must know: Client’s priorities How space will be used Where equipment is located Location of phones,
Ag. Mechanics for Beginning Teachers
SERVICE ENTRANCE EQUIPMENT
E4 HVACR Electrical Installation
1 Figure 2-6: Building Security Building Security Basics  Single point of (normal) entry to building  Fire doors, etc.: use closed-circuit television.
 E4 HVACR Electrical Installation #3 Circuit breakers, disconnects, and fuses.
ETP 1138C Week #2 Advanced print reading basics (Types of Engineering documentation) This week we will cover the following topics in class: We will introduce.
Switches and Over Current Protective Devices Class Instructor ALPHER E. DE VERA, uap.
Residential Wiring Unit 3 – Installation and Planning.
ELECTRICAL WIRING WIRING BASICS Written by Bobby Joslin
ELECTRICAL INSTRUMENTS ( service and utilization )
Chapter 30 Electrical Wiring Copyright Goodheart-Willcox Co., Inc. May not be posted to a publicly accessible website. Define basic electrical terms.
Upon completion of this module, you will be able to:
Electrical Diagrams.
Making Circuits Safe SNC1P1 Findlay.
E4 HVACR Electrical Installation
License Examination Practice Drill
Chapter 12 Branch Circuits and Feeders. Chapter 12 Branch Circuits and Feeders.
E4 HVACR Electrical Installation
INSTALLING ELECTRIC PANEL GENERATOR
ESTIMATING AND COSTING OF DOMESTIC INSTALLATION
Engineering Project Cable Management.
Chapter 19 Electrical Plans.
EET 323 – Electrical System Design Lecture 9: Grounding
Conductor A material, such as copper, that permits the flow of electricity; usually refers to the a wire.
ELECTRICAL INSTALLATION
Smitty’s Two Minute Drill Services, Feeders, and Branch Circuits 1
Presentation transcript:

CONSTRUCTION BLUEPRINT READING RISER DRAWINGS

CONSTRUCTION BLUEPRINT READING Riser diagrams or single line diagrams are used to show the arrangement of equipment and wiring. Riser diagrams show the connecting lines used for feeders and cable distribution per each floor serviced. They will provide conduit sizes, shown on the electrical riser diagram, and backbone counts to each floor.

CONSTRUCTION BLUEPRINT READING For low voltage systems the grounding riser will be shown, in some cases this may be a detail drawing. Notice that the TMGB is connected to the service equipment in the electrical entrance facility.

CONSTRUCTION BLUEPRINT READING The electrical entrance facility has an earth ground connected to the electrical service equipment, this is the starting point of the grounding electrode system, and a bonding conductor is connected to the TMGB.

CONSTRUCTION BLUEPRINT READING From the TMGB a TBB is run to each TGB in each TR. What size TBB is required for this electrode grounding system? (it is assumed you should know this, its not stipulated on this riser diagram). 6 AWG

CONSTRUCTION BLUEPRINT READING Riser diagrams may include a general notes section and a legend as seen in the grounding riser diagram.

CONSTRUCTION BLUEPRINT READING In this riser diagram the general notes tell us that we need to install a 100 pair to each TR from the entrance facility and a 12 strand MM fiber from the data center to each TR.

CONSTRUCTION BLUEPRINT READING Looking at this diagram you now know you will have two separate pulls from two different locations. You will need to look at detail drawings to determine where in each of these rooms the cables will terminate.

CONSTRUCTION BLUEPRINT READING Here is a detail drawing of a TR;

CONSTRUCTION BLUEPRINT READING If this was the detail drawing for the riser system shown then the 100 pair cable will emerge from one of the 4” conduits and terminate on a back board. BASED ON THE INFORMATION GIVEN IN THE DRAWING THE 100 PAIR CABLES WILL TERMINATE ONTO WHAT TYPE OF BLOCKS? BIX BLOCKS

CONSTRUCTION BLUEPRINT READING The riser diagram is representative of the scope of work and needs to be compared with the floor plans for the location of the spaces.

CONSTRUCTION BLUEPRINT READING How many and what size 110 blocks are required for the riser installation portion of this project? 1, 300 pair block for the entrance facility and 3, 100 pair blocks, 1 for each of the TRs.

CONSTRUCTION BLUEPRINT READING When working on high rise projects the riser diagrams will need to be split up into sections. Here is a 19 story building not including the sub-levels. South and East elevations are shown in this drawing.

CONSTRUCTION BLUEPRINT READING

CONSTRUCTION BLUEPRINT READING Here is the legend to explain the devices for the riser system.

CONSTRUCTION BLUEPRINT READING The fire alarm riser diagram would also include a general notes section for further details on the riser installation. It is typical for the general notes to refer you to other drawings for specifics, as an example the actual device counts would be on a separate floor plan. The riser diagram shows only the east and west wing set up but not the number of devices required for full protection of the wing.

CONSTRUCTION BLUEPRINT READING Notice that the DS and TS are attached to the AHU, the AHU is the air handling unit, that has a duct sensor DS in it, the DS is wired to a test switch TS. These test switches can be seen in the hallways of the school and are labeled with the AHU number that they’re associated with.

CONSTRUCTION BLUEPRINT READING There will also be detail drawings for wiring the different circuits in a fire alarm system;

CONSTRUCTION BLUEPRINT READING HERE IS A VOICE AND DATA RISER AND DISTRIBUTION DETAIL DRAWING, THIS DETAIL SHOWS HOW THE VOICE LOCATIONS ARE WIRED TO THE PBX, WHAT IS NOT SHOWN IS HOW THE DATA HUBS ARE CONNECTED.

CONSTRUCTION BLUEPRINT READING In the previous diagram the abbreviation LEC is used, what does LEC stand for? LOCAL EXCHANGE CARRIER (PHONE COMPANY)

CONSTRUCTION BLUEPRINT READING Here is an electrical riser diagram

CONSTRUCTION BLUEPRINT READING This is a small section cut from the riser diagram, as you can see some of these drawings can get pretty complicated.

CONSTRUCTION BLUEPRINT READING The circle show a call out to a detail drawing, the rectangle refers you to specific general notes and the square shows a circuit to the fire alarm control panel with the type and amperage of the fuses for the circuit.