HOUSTON, TEXAS1 Protection of DOT Regulated Pipelines During Construction and Repair Activities ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification.
Drawings of Sufficient Detail
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
Bangor Water Districts Experience With Gas. Bangor Water Districts Experience With Natural Gas.
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Railroad Commission of Texas Railroad Commission of Texas Pipeline Safety Division Damage Prevention Program.
Crossing Agreements Canadian Best Practice Crossing Agreements A Canadian Best Practice Brad Watson TransCanada Pipelines and Alberta Common Ground Alliance.
Supervision and Administration
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
Utilities in MaineDOT’ s Right of Ways. MaineDOT’ s Jurisdiction All State and State Aid roads. All Facilities and.
MODULE 2 By Vit Troyan. TRANSPORTATION: Right-of-Way Traffic Operations Street Maintenance One-Call Centers.
Codes and Standards to be followed in the design and construction of the Green Energy facility National Fire Protection Assoc (NFPA); American Gas Association.
MODULE 1 Introduction to OSHA and DOT Training.
National Bridge Inspection Standards (NBIS)
Impacts of “MAP-21”on the National Bridge Inspection Program Tribal Government Coordination Meeting Date August 7, 2014 Presented by: Gary Moss, P.E. Acting.
Revisions to Part 8 – Traffic Control for Railroad and LRT Grade Crossings.
MAJOR REVISIONS TO THE POLICY FOR ACCOMMODATING UTILITIES ON HIGHWAY RIGHTS Presented By: Mark Attaway March 29, 2011.
Ohio’s One-Stop Utility Resource Gas Pipeline Safety Pipelines - State and Local Issues Pete Chace GPS Program Manager (614)
SUTTER BUTTE FLOOD CONTROL AGENCY Supplemental Presentation on Variances and Encroachments Feather River West Levee Project Project Area C May 24, 2013.
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
Health and safety at work
E4014 Construction Surveying
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
Louisiana State Police Emergency Services Unit. The Emergency Services Unit is comprised of: Explosives Control Explosives Control HazMat HazMat Right-to-Know.
"Welder Certification" The purpose of this presentation is to introduce you to the various aspects of welder certification. This is not intended to cover.
CNG STATION & GARAGE MODIFICATION CODES & STANDARDS Graham Barker Business Development Manager.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
Module 13: Highway-Rail Grade Crossings (HRGC)
Real Estate Contracts Group
Identifying Driving Techniques for Safe Operation of a Transport
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
Team Tech meeting May 22, 2006 State Traffic Commission & DEP Storm Water Permitting State Traffic Commission Permitting & Storm Water Permitting State.
Franchise Quest RegulationsRouteFranchiseExhibits Eminent Domain Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q $200 Q $300 Q $400 Q $500 Final.
Moving Towards A Gigabit State May 4, 2015 Broadband Inventories.
Roadway Lighting on TxDOT Right of Way Greg Jones, EIT Master Electrician, State of Texas TxDOT, Traffic Operations Division, Illumination Branch.
Part 3.3 Production Safety. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand safety.
Transportation of Hazardous Materials. Applicability Each officer or employee of the motor carrier who performs duties related to the transportation of.
PROPANE DELIVERY OPERATIONS AND CYLINDER DELIVERY Propane Delivery Operations and Cylinder Delivery.
Lee County Electric Cooperative 2007 Hurricane Preparedness Activities.
Michigan Department of Licensing and Regulatory Affairs Bureau of Construction Codes.
1. 2 Background Bill C-3, International Bridges and Tunnels Act: –introduced in the House of Commons on April 24, 2006 –received Royal Assent on February.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Posting and Utilities Technical Standards Branch Class.
Accident Prevention Manual for Business & Industry: Engineering & Technology 13th edition National Safety Council Compiled by Dr. S.D. Allen Iske, Associate.
The View From Olympia: Right of Way usage fees as revenue replacement mechanism for future of declining cable franchise fees April 29, 2105 Kenneth S.
2011 PLANT OPERATIONS MODULE 8 Maintain Bulk Plant Systems and Equipment.
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
Sprinkler Loads on Trusses
1 Electricity. This material was produced under grant number SH F-54 from the Occupational Safety and Health Administration, U.S. Department.
Horizontal Directional Drilling (HDD) Arvid Veidmark, III EVP, Senior Estimator Specialized Services Company
USDA - NRCS Field Construction & Safety 1.  Learn to recognize potential hazards and safety violations  Understand how the NRCS deals with safety and.
Permanent Solutions to Temporary Loads: An Alternate Approach to Electrical System Design for Short Term and Mobile Industrial Loading Presented by: Eli.
Trench Hazards Introduce the module. Trenching & Excavations Continuing Education Third Quarter 2017 Session 3.
Department of Permits, Licenses, and Inspections
Grade Crossing Handbook
THUM Adapter Impact on Hazardous Area Classification
Construction Management & Inspection
Piping.
TxDOT Utility Related Issues
Transmission Engineering
Utility Considerations on Transportation Projects
Excavation.
Locating Gas Structures
Construction Considerations
Drawing of Sufficient Detail (DOSD)
ABC Company ABC Chemical Complex Engineering Specification
Presentation transcript:

COPYRIGHT © AREMA : 1 of 24 Module 17: Utility Occupations

COPYRIGHT © AREMA : 2 of 24 Objectives Public Safety Parallel Occupation Perpendicular Occupation Overhead Underground Permit Requirements

COPYRIGHT © AREMA : 3 of 24 Utility Occupations Overhead Power Lines Fiber Optic Line Gas Pipeline

COPYRIGHT © AREMA : 4 of 24 Safety The safety of the public and railroad personnel and property can be affected by improper installation of utilities: Wires can sag, Pipes can break, Precautions must be taken so that if these events occur, the results are manageable, not catastrophic.

COPYRIGHT © AREMA : 5 of 24 What is a Utility Occupation? Use of railroad property by the provider of the means of transmitting fluids, gasses, electricity or communications. –Utilities can be privately or publicly owned. –Railroads prefer to keep their rights of way unencumbered but sometimes this is impossible. In these cases, utility occupations are permitted.

COPYRIGHT © AREMA : 6 of 24 Types of Occupations Utilities can occupy the railroad in two ways: –Parallel Occupations – occupying the railroad right of way longitudinally either at, above or below grade. –Crossing Occupations – either under the railroad right of way or overhead For right of way purposes, railroads consider utilities to be of two types: –Pipe – typically carrying fluid or gaseous products –Wire – typically electric or communications

COPYRIGHT © AREMA : 7 of 24 Parallel Occupancy Overhead Installations –Minimum clearance to RR signal and communication lines –Minimum clearance from pole line to track centerline –Towers carrying high voltage will likely be required to be placed off RR property –Inductive interference study for electric lines may be required

COPYRIGHT © AREMA : 8 of 24 Parallel Occupancy

COPYRIGHT © AREMA : 9 of 24 Parallel Occupancy Underground Installations –Placement within prescribed distance from RR property line –Encasement required within prescribed distance –Placement at or beyond prescribed minimum distance to track centerline –Minimum cover requirement –Warning tape for electric and fiber optic lines

COPYRIGHT © AREMA : 10 of 24 Parallel Occupancy

COPYRIGHT © AREMA : 11 of 24 Parallel Occupancy Attachment to Bridges and Other Structures –Most RR’s do not allow attachment to their bridges or other structures –May require modification of structure

COPYRIGHT © AREMA : 12 of 24 Crossings General: –Preferred to be perpendicular to the RR alignment and at not less than forty-five (45) degrees to the centerline of the track. –Not placed within culverts or under railroad bridges, buildings or other structures.

COPYRIGHT © AREMA : 13 of 24 Crossings

COPYRIGHT © AREMA : 14 of 24 Crossings Overhead Installations: Minimum vertical and horizontal clearances required. Crossings are not allowed in close proximity to bridges, culverts and switches. Requires signs showing owner of utility and emergency phone contact at poles or towers closest to RR right of way. Flammable or hazardous overhead crossings should be avoided. Inductive interference study for electric lines may be required.

COPYRIGHT © AREMA : 15 of 24 Overhead Wire Crossing

COPYRIGHT © AREMA : 16 of 24 Crossings Underground Installations: –Designed to carry Coopers E-80 Railroad loading with impact. –Minimum depth of cover AND depth below base of rail. –Depending on depth and pipe size, geotechnical study may be required –Open trench installation method may be used up to a minimum distance from track centerline. –Within this minimum distance, common methods of installation are: Tunnel, Auger, Jack & Bore, Directional Bore. –Manholes are required to be a minimum distance from the track and are cannot be located in the shoulder, slope, ditch or backslope. –Jacking pits are required to be a minimum distance from the track centerline, commonly 30’.

COPYRIGHT © AREMA : 17 of 24 Pipeline with Casing Pipeline Installations –Must comply to established standards. –Must be encased. –Casings are oversized load bearing conduits: Typically required from right of way line to right of way line. Protect the RR from damage in case of failure of the carrier pipe. Enable repair to carrier pipe without disrupting rail traffic. Protect the carrier pipe from railroad loads or shocks. Route leaking products away from track. Sealed casing pipe must be vented. Casing can be omitted for some gas products under certain conditions.

COPYRIGHT © AREMA : 18 of 24 Underground Installation

COPYRIGHT © AREMA : 19 of 24 Underground Installation

COPYRIGHT © AREMA : 20 of 24 Utility Crossing Requirements Most railroads have extensive information available for download directly from their websites. This includes: –Application forms and instructions including samples of written application and associated drawings –Design and construction standards –Insurance requirements –Contacts

COPYRIGHT © AREMA : 21 of 24 Sources American National Standards Institute (ANSI) Codes, 1430 Broadway, NY, NY American Railway Engineering and Maintenance of Way Association (AREMA) Specifications. American Society for Testing and Materials (ASTM) Specifications. American Water Works Association Standards and Specifications, AWWA, 2 Park Avenue, NY, NY Manual on Uniform Traffic Control Devices - with revisions, US Department of Transportation, Federal Highway Administration. National Electrical Safety Code, US Department of Commerce, National Bureau of Standards. Pipeline Safety Regulations - Code of Federal Regulations, Tile 49 - Transportation, Parts Natural Gas; Part 195-Liquid Petroleum Gas. Rules and Regulations for Public Water Systems - latest edition, State Health Departments. Rules and Regulations promulgated by the Hazardous Materials Regulation Board of the US Department of Transportation, Statutory Provisions, 23 U.S.C. 109 and 111.

COPYRIGHT © AREMA : 22 of 24 Application Requirements Processing and license fee Proof of insurance Legal name of applicant Location (footage and direction) relative to nearest RR milepost Right-of-Entry Permit Drawing prepared in accordance with RR requirements showing: –Plan and profile of the proposed occupation –Details of the crossing including clearances to RR features –RR right of way, tracks, bridges and other features

COPYRIGHT © AREMA : 23 of 24 Review Process Review by the RR or its representative Acceptance by the utility of RR estimate of its costs for involvement and agreement to pay these costs, typically: –Flagman –Inspection –Force account work by RR forces if required Signed agreement returned to RR for execution –Usually within 30 days if no problems are encountered with the application Once the agreement is executed, arrangements can be made with the designated RR contact to perform the work. –NO WORK CAN BE PERFORMED WITHOUT PROPER AUTHORIZATION BY THE RAILROAD!

COPYRIGHT © AREMA : 24 of 24 QUESTIONS? Author: Robert W. Nastal Knight E/A, inc. (312)