Department of Industrial and Engineering Technology College of Science and Technology Morehead State University IET 317 Group 5 Project Group Members:

Slides:



Advertisements
Similar presentations
Landstown High School Governors STEM & Technology Academy
Advertisements

Freeleansite.com The Lean Enterprise Set-up Reduction/ Quick Changeover Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement.
LECTURE 26- MASS MOMENT OF INERTIA OF PULLEY SYSTEMS
Clark–Reliance Company Manufacturing Update Presented to General Electric July 17, 2007.
Senior Design I Peer Review January 20 th, 2006 PO6208 – ARC Works Sports Bottle Sponsor: ARC Works of Monroe County Team Members: Team Leader George Gooch,
MIG Welding By: Jared McCombs and Vinnie DiBlasi
VS Series Shears. User-friendly CNC Touchscreen Control Flexibility for Thick/Thin or Narrow/Wide Sheets Automatic Swing-up Back Gauge T-slotted Sheet.
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
Computer Integrated Manufacturing CIM
PRODUCTION FACILITY HIGHLIGHTS. FAST FACTS: 550,000 Square Feet $40 Million Investment ISO9001 Certification.
Forging new generations of engineers. Fluid Power.
HYDROFORMING PROCESS SHORT DESCRIPTION DVA1 Meeting at NSF Arlington VA April 15-16, 2010 Matt Fleming Contributions from John Andersen.
Chapter 3 Planning for Production. Objectives Product oriented manufacturing systems versus people oriented manufacturing systems. Manufacturing smaller.
Robots An Introduction. Various Robot Fields: Aerospace (air travel, space exploration) Exploration (underwater, space, volcanic) Entertainment Medical.
Just-In-Time “Eliminate Waste”.
Automated Production Lines
Automated Manufacturing
TIRE PRESSURE MONITORING SYSTEMS
Illustrated Industrial Automation Applications
Network Storage and Appliance Box Build By: Cubatic Engineering 01/09/2015.
Bachelor of Technology Mechanical
ROBOT APPLICATIONS.
1 Case Study based on a trip on Nov 19, 02 NUMMI.
Course of MT- 362 Material Handling Lecture # 8.
© 2012 Delmar, Cengage Learning General Shop Equipment Chapter 9.
Trindel Insurance Fund
Basic Tool Safety and Equipment
Lean Production - Objectives
SRA Lab Safety & Proposal PowerPoint Project This is a Partnered/Group Assignment Tech Ed - 9 Lab Safety & SRA Proposal Report Mr. Saunders Remember: This.
THE HYDROFLOW STAR FILTER
Chapter 4 Process Design.
How is a manufacturing facility planned?
Ergonomics and Workstation Design Space Requirements
Robots An Introduction. Various Robot Fields: Aerospace (air travel, space exploration) Exploration (underwater, space, volcanic) Entertainment Medical.
Batteries, Starting & Charging Systems Batteries Purpose: a storage of electrical current to operate starting motor and ignition systems when starting.
MACHINE GUARDING. contents  What is a Guard?  Why are guards used?  Where should machine guards be used?  Hazardous Machine Areas  Hazardous Actions.
Introduction To Fluid Power
Grade 11 Welding Simulation Lesson
MH...CH LECT011 What is Material Handling? Materials handling is the science and art both involving the moving, packing and storing of substance.
Forging new generations of engineers. Brakes Friction & Braking Friction: A force that opposes motion, it prevents the sliding between two surfaces that.
IET 330 Industrial Design Group 4 Improving Efficiency and Productivity at SealMaster Elizabeth McClain Richard Cantrell.
Career Fact Sheet. Welding Introduction Training for welders, Training ranges from a few weeks of school or on-the- job training for low-skilled positions.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
Accumulator : A robot mechanism designed to pick up a large number of similar objects.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Lean Supply Chains Chapter 12.
What is Welding? As Identified by the American Welding Society, a weld is a formed when separate pieces of material are Fused together through the application.
LEAN OPERATIONS PROVIDE PRODUCTS OR SERVICES IN RIGHT QUANTITY OF RIGHT QUALITY AND AT RIGHT TIME.
A SEMINAR PRESENTATION ON EICHER ENGINE
 Your Single Source for "to spec" Custom Manufacturing Your Single Source for "to spec" Custom Manufacturing  AMS offers a unique and complete combination.
Definition: The physical positioning of processes, departments, equipment and work areas to optimize an organization’s effectiveness in achieving its operating.
Discrete Control Logic
H, I & PLUS BEAM FABRICATION LINE WITH MATERIAL HANDLING
It’s…….
INTRODUCTION TO POWER TOOLS & EQUIPMENT
TIRE PRESSURE MONITORING SYSTEMS
CHAPTER 9 Lean Manufacturing.
Chapter 12 Lean Production. Chapter 12 Lean Production.
Improving Productivity-When to Consider Automation
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Technological process for parts FAN COVER
MACHINE GUARDING POLICY AND PRACTICES - Training Program -
Teknologi Dan Rekayasa
NL 100/230 AUTOMATED MACHINING CENTER FOR FLANGES NALITECK
GMAW Welding Basic information.
Automation (자동화) Associate Professor Su-Jin Kim
Automation Topics: Elements of an Automated System
Chapter 10 Production Planning.
Summer Training Department of Industrial Engineering
Presentation transcript:

Department of Industrial and Engineering Technology College of Science and Technology Morehead State University IET 317 Group 5 Project Group Members: James Forrest, Lowell Outland, Evan Scott, Donald Snyder, Matt Wells Steel Wheel Assembly Work Cell

Central Motor Wheel of America (CMWA)  CMWA was established in  Location: Paris, Kentucky  Employs approximately 500 people.

CMWA Products  OEM supplier of Steel and Aluminum Wheels.  Steel Wheel Customers: Toyota, Honda, and Hyundai  Aluminum Wheel Customers: Toyota and Lexus.

Rationale for selecting the Steel Wheel Assembly Station  The rationale for our chosen process is simple  A work cell is a collection of equipment required to make a single complex part  The part being produced is the steel wheel  The Steel Wheel Assembly Station itself has many parts. (Including: the operators, robotic loaders, punch press, date stamp device, welders, grinders and inspection)  Multiple factors can lead to the occurrence of waste

Rationale cont.  If diligent lean techniques aren’t practiced in this work environment, the efficiency of the work cell could easily deteriorate, wasting valuable company time and money  In our efforts to make improvements we analyzed the processes of the Steel Wheel Assembly Station  Identified areas that can be improved  Made suggestions on how to improve them to make it a more lean and efficient process

Description of Steel Wheel Assembly Station The cell is used to assemble two main components of a steel wheel. The two components are the center disk (wheel center) and the Rim (outer part of the wheel). These parts are placed near an operator at the beginning of the assembly line. At the beginning of the wheel assembly machine there is one operator. This individual is responsible for loading the center disk onto the conveyor belt and loading the rim into a small punch press. This punch press is responsible for punching out the valve stem hole. The punch press side of the line will be discussed first. The operator grabs a rim (6sec.) and places it onto the punch press (3sec.), he then activates the press which locks the rim into place and almost simultaneously punches the hole for the valve stem (2 sec.). Once this operation is finished a mechanical arm pulls the rim onto a conveyor belt directly in front of the punch press (Note: as the mechanical arm is pulling the rim on to the conveyor the operator is loading a center disk onto the other line). The rim continues down the conveyor to the stamp station which automatically positions and clamps the rim (2sec.). This station stamps a date (2sec.) onto the rim so that when the two parts are welded together the company has a record for quality assurance purposes. On the wheel center side of the line, the operator has to just load the part so that it travels down and stops near the two weld fixtures. Please note that the operator is responsible for keeping both conveyor lines full. At this point two additional operators are simultaneously grabbing a rim or a center disk and loading it into a weld jig. They then retrieve the opposing part and place it into the jig (20 sec per operator). The operators then activate the hydraulic clamps (2sec. per operator) to hold the parts together during welding. The welding process automatically starts as soon as the parts are clamped together. The welding robot is equipped with four MIG (Metal Inert Gas) guns that feed the wire continuously to create a seamless weld. The pallet that the parts are clamped to only has to rotate approximately 92 degrees to create the finished weld. The welding process takes about (30sec per assembly.). Once the parts have been full welded the newly formed wheels are removed by mechanical arms and placed (8sec.) onto another conveyor belt. The wheels then travel to an automated grinder that grinds/polishes the welded seam (15sec per wheel). The wheels then travel on to an inspection station where they are checked for visual and mechanical defects by a fourth individual. This takes approximately 15-25sec per wheel. There are time variances due to anomalies in the weld or grind finish that occurs from time to time and also indicated run out noticed on the inspection gage. The total amount of allowed run out is 0.3mm. This is the end of the journey for the newly minted wheel. The wheels next stop will be the powder coat/paint booth which is another work cell. Please note that the work cell is full of parts at all times so conveyor length is not a factor. As it was explained to our group the work cell is not timed linearly due to the fact that mechanical breakdowns are anticipated especially where the welders and grinders are concerned. Also, the nozzles must be cleaned and guides replaced after X-amount of wheels are welded.

Work Cell Layout Steel Wheel Assembly Machine Wheel Rim Rack Wheel Centers Rack Punch Press (Valve Stem Hole) Date Produced Stamped on Rim Wheel Welder 1 Wheel Welder 2 Finish Grinder/ Polisher Inspection Gage Manual Load/1 Person Manual Load/1 person Manual offload/ 1 person Note: Four Person Work Cell Manual Load/1 Person

Time Study Analysis StepTime (in seconds) Acquiring materials6 Loading Punch Press3 Small Punch Press (valve stem hole punch)2 Stamp Station Load2 Date Stamp (for quality assurance)2 Loading Weld Jig20 Activate Hydraulic Clamp2 (per operator) Welding Process**Approx. 30 (per operator) Remove wheels8 Grind weld seam15 Visual inspection*15-25 Total cycle time per assembly * Time anomalies due to defects found on assembly during inspection. **Times inaccurate due to required maintenance i.e. cleaning nozzle and replacing guards

Suggested Improvements  Improve /Eliminate Finish Grinder Electric motors breaks down frequently Change to more reliable air motors  Rotate conveyor belt 180 degrees Will help make the process more linear(Refer to layout)  Move wok cell closer to punch press Use conveyor between punch press and work cell Help speed up production  Add robot to place parts onto conveyor at beginning of work cell Eliminates need for manpower at this position Helps speed up production  Consider adding a third welder(identified choke point) Move worker from first station to third welder Helps to alleviate choke point  Move closer to paint booth Reduces travel time to paint  Condense entire wheel making operation Help speed up production cost prohibitive

Group Recommendations:  Recommend changing electric motors to pneumatic motors for more reliability  Recommend moving work cell closer to paint booth to reduce part travel time after assembly  Recommend adding a third welding machine to eliminate bottleneck in production  Recommend rotating welding machines 180 degrees to create a more linier product flow as shown by recommended layout

Recommended /Revised Work Cell Layout Wheel Assembly Machine Wheel Rim Rack Wheel Centers Rack Punch Press (Valve Stem Hole) Date Produced Stamped on Rim Wheel Welder 1 Wheel Welder 2 Finish Grinder/ Polisher Inspection Gage Manual Load 1st Person Manual Load/1 person Manual offload/ 1 person Note: Four Person Work Cell Manual Load 2 nd Person

Conclusion  Using Time and Motion Studies are very useful  The assembly cell can be improved  The entire wheel production operation should be reexamined  Room for cycle time improvements