Operations Scheduling
Advertisements

Scheduling.
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Operations Management For Competitive Advantage 1 Operations Scheduling Operations Management For Competitive Advantage Chapter 15.
Scheduling.
© The McGraw-Hill Companies, Inc., Chapter 16 Operations Scheduling.
Operations Scheduling
Theory of Constraints Scheduling APICS PDM January 14, 2009.
14 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Operations Planning and Scheduling 14 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Operations Scheduling
DOM 102: Principles of Operations Management Operations Scheduling
23–1. 23–2 Chapter Twenty-Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 16 Scheduling Scheduling
Short-Term Scheduling
Operations Management
MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS Session 6 SCHEDULING E
Operations Management R. Dan Reid & Nada R. Sanders
22–1. 22–2 Chapter Twenty-Two Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Scheduling.
1 ISQA 459/559 Mellie Pullman Scheduling Shop Floor.
1 Chapter 15 Scheduling. 2 Scheduling: Establishing the timing of the use of equipment, facilities and human activities in an organization Answering “when”
CHAPTER 19 Scheduling Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
JIT and Lean Operations
Operations Scheduling. Scheduling in a Process-Focused Environment.
Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
Production Activity Control
Industrial Systems Engineering Dept. İzmir University of Economics
Chapter 16 Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
1. Facility size 2. Equipment procurement Long-term
Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
Aggregate Planning, MRP, and Short Term Scheduling 9 Aug 2001.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
1 1 Slide Short – Term Scheduling Professor Ahmadi.
Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Scheduling Process and Production Management.
Topics To Be Covered 1. Tasks of a Shop Control Manager.
Operations Management Operations Scheduling
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Synchronous Manufacturing and Theory of Constraints
Chapter 17 Scheduling. Management 3620Chapter 17 Schedule17-2 Overview of Production Planning Hierarchy Capacity Planning 1. Facility size 2. Equipment.
1 Manufacturing Operations Scheduling B2 [ ] B2 [ ] E5 [ E5 [ P9 [---] P9 [---] D1 [ D1 [
Scheduling. Definition of scheduling Establishing the timing of the use of equipment, facilities and human activities in an organization In the decision-making.
Scheduling. Scheduling: The allocation of resources over time to accomplish specific tasks. Demand scheduling: A type of scheduling whereby customers.
Scheduling for Low-volume Operations
CHAPTER SEVENTEEN SCHEDULING Chapter 17 Scheduling.
Scheduling Seminar exercises Process and Production Management.
CHAPTER 4 : SCHEDULING Presented by: HAMKA BIN TAIP
Scheduling Operations IDS 605 Spring Data Collection for Scheduling l Jobs l Activities l Employees l Equipment l Facilities Transparency 18.1.
Activity Scheduling and Control
Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Scheduling.
Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Chapter 16: Learning Objectives Instructor Slides You should be able to: 1.Explain what scheduling involves and the importance of good scheduling 2.Describe.
14 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Operations Planning and Scheduling 14 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
16 Scheduling (focus on sequencing; FCFS, SPT, EDD pages , and Johnson’s rule pages ) Homework; 6, 7, 11.
Chapter 15 Scheduling McGraw-Hill/Irwin
CHAPTER 8 Operations Scheduling
Chap 11 Learning Objectives
Scheduling Scheduling is an important tool for manufacturing and service industries, where it can have a major impact on the productivity of a process.
8 Job Sequencing & Operations Scheduling CHAPTER Arranged by
Sequencing Sequencing: Determine the order in which jobs at a work center will be processed. Workstation: An area where one person works, usually with.
Production and Operations Management
Scheduling Seminar exercises
Presentation transcript:

Chapter 16: Learning Objectives You should be able to: Explain what scheduling involves and the importance of good scheduling Describe scheduling needs in high-volume and intermediate-volume systems Describe scheduling needs in job shops Use and interpret Gantt charts, and use the assignment method for loading Give examples of commonly used priority rules Summarize some of the unique problems encountered in service systems, and describe some of the approaches used for scheduling service systems 16-1

Scheduling Scheduling: Effective scheduling can yield Establishing the timing of the use of equipment, facilities and human activities in an organization Effective scheduling can yield Cost savings Increases in productivity Other benefits 16-2

Scheduling Context Scheduling is constrained by multiple system design decisions System capacity Product and/or service design Equipment selection Worker selection and training Aggregate planning and master scheduling 16-3

Scheduling Hierarchies 16-4

High Volume Systems Flow System High-volume system in which all jobs follow the same sequence Flow system scheduling Scheduling for flow systems The goal is to achieve a smooth rate of flow of goods or customers through the system in order to get high utilization of labor and equipment Workstation 1 Workstation 2 Output 16-5

High-Volume: Scheduling Difficulties Few flow systems are entirely dedicated to a single product or service Each product change requires Slightly different inputs of parts Slightly different materials Slightly different processing requirements that must be scheduled into the line Need to avoid excessive inventory buildup Disruptions may result in less-than-desired output 16-6

High-Volume Success Factors The following factors often dictate the success of high-volume systems: Process and product design Preventive maintenance Rapid repair when breakdowns occur Optimal product mixes Minimization of quality problems Reliability and timing of supplies 16-7 Scheduling

Intermediate-Volume Systems Outputs fall between the standardized type of output of high-volume systems and the make-to-order output of job shops Output rates are insufficient to warrant continuous production Rather, it is more economical to produce intermittently Work centers periodically shift from one product to another 16-8

Intermediate-Volume Systems Three basic issues: Run size of jobs The timing of jobs The sequence in which jobs will be produced 16-9

Intermediate-Volume Systems Important considerations Setup cost Usage is not always as smooth as assumed in the economic lot size model Alternative scheduling approach Base production on a master schedule developed from customer orders and forecasted demand 16-10

Low-Volume Systems Job shop scheduling Scheduling for low-volume systems with many variations in requirements Make-to-order products Processing requirements Material requirements Processing time Processing sequence and steps A complex scheduling environment It is impossible to establish firm schedules until actual job orders are received 16-11

Low-Volume Systems: Loading the assignment of jobs to processing centers Gantt chart Used as a visual aid for loading and scheduling purposes Purpose of the Gantt chart is to organize and visually display the actual or intended use of resources in a time framework Managers may use the charts for trial-and-error schedule development to get an idea of what different arrangements would involve 16-12 Scheduling

Gantt Charts Load chart A Gantt chart that shows the loading and idle times for a group of machines or list of departments 16-13

Loading Approaches Infinite loading Finite loading Jobs are assigned to workstations without regard to the capacity of the work center Finite loading Jobs are assigned to work centers taking into account the work center capacity and job processing times 1 2 3 4 5 6 over Capacity Infinite loading Finite loading 16-14 Scheduling

Scheduling Approaches Forward scheduling Scheduling ahead from some point in time. Used when the question is: “How long will it take to complete this job? Backward scheduling Scheduling backwards from some due date “When is the latest this job can be started and still be completed on time?” 16-15

Gantt Charts Schedule chart A Gantt chart that shows the orders or jobs in progress and whether they are on schedule 16-16

Managing Work Flows Input/Output (I/O) control Managing work flow and queues at work centers Without I/O control: If demand exceeds processing capacity, a work center overload is created If work arrives more slowly than a work center can handle, work center underutilization results The goal is to strike a balance between input and output rates in order to minimize queues and maximize utilization 16-17

I/O Chart 16-18

Assignment Assignment model Hungarian method A linear programming model for optimal assignment of tasks and resources Hungarian method Method of assigning jobs by a one-for-one matching to identify the lowest cost solution 16-19

Sequencing Sequencing Priority rules Determine the order in which jobs at a work center will be processed Priority rules Simple heuristics used to select the order in which jobs will be processed The rules generally assume that job setup cost and time are independent of processing sequence Job time Time needed for setup and processing of a job 16-20 Scheduling

Priority Rules FCFS - first come, first served SPT - shortest processing time EDD - earliest due date CR - critical ratio S/O - slack per operation Rush - emergency 16-21 Scheduling

Priority Rules: Assumptions The set of jobs is known; no new orders arrive after processing begins and no jobs are canceled Setup time is independent of processing time Setup time is deterministic Processing times are deterministic There will be no interruptions in processing such as machine breakdowns or accidents 16-22 Scheduling

Priority Rules: Local v. Global Local priority rules: Focus on information pertaining to a single workstation when establishing a job sequence Global priority rules: Incorporate information from multiple workstations when establishing a job sequence 16-23

Sequence: Performance Metrics Common performance metrics: Job flow time This is the amount of time it takes from when a job arrives until it is complete It includes not only processing time but also any time waiting to be processed Job lateness This is the amount of time the job completion time is expected to exceed the date the job was due or promised to a customer Makespan The total time needed to complete a group of jobs from the beginning of the first job to the completion of the last job Average number of jobs Jobs that are in a shop are considered to be WIP inventory 16-24

Two Work Center Sequencing Johnson’s Rule Technique for minimizing makespan for a group of jobs to be processed on two machines or at two work centers. Minimizes total idle time Several conditions must be satisfied 16-25 Scheduling

Johnson’s Rule Conditions Job time must be known and constant for each job at the work center Job times must be independent of sequence Jobs must follow same two-step sequence All jobs must be completed at the first work center before moving to second work center 16-26 Scheduling

Johnson’s Rule: Optimum Sequence List the jobs and their times at each work center Select the job with the shortest time If the shortest time is at the first work center, schedule that job first If the shortest time is at the second work center, schedule the job last. Break ties arbitrarily Eliminate the job from further consideration Repeat steps 2 and 3, working toward the center of the sequence, until all jobs have been scheduled 16-27

Scheduling Difficulties Variability in Setup times Processing times Interruptions Changes in the set of jobs Except for small job sets, there is no method for identifying an optimal schedule Scheduling is not an exact science It is an ongoing task for a manager 16-28

Minimizing Scheduling Difficulties Set realistic due dates Focus on bottleneck operations First, try to increase the capacity of the operations If that is not possible Schedule bottleneck operations first Then, schedule non-bottleneck operations around the bottleneck operations Consider lot splitting of large jobs Often works best when there are large differences in job times 16-29

Theory of Constraints Theory of constraints Production planning approach that emphasizes balancing flow throughout a system, and pursues a perpetual five-step improvement process centered around the system’s currently most restrictive constraint. Bottleneck operations limit system output Therefore, schedule bottleneck operations in a way that minimizes their idle times Drum-buffer-rope Drum = the schedule Buffer = potentially constraining resources outside of the bottleneck Rope = represents synchronizing the sequence of operations to ensure effective use of the bottleneck operations 16-30

Theory of Constraints (contd.) Varying batch sizes to achieve greatest output of bottleneck operations Process batch The economical quantity to produce upon the activation of a given operation Transfer batch The quantity to be transported from one operation to another, assumed to be smaller than the first operation’s process batch 16-31

Theory of Constraints (contd.) Improving bottleneck operations: Determine what is constraining the operation Exploit the constraint (i.e., make sure the constraining resource is used to its maximum) Subordinate everything to the constraint (i.e., focus on the constraint) Determine how to overcome (eliminate) the constraint Repeat the process for the next highest constraint 16-32

Theory of Constraints: Metrics Three important theory of constraints metrics: Throughput The rate at which the system generates money through sales Inventory Inventory represents money tied up in goods and materials used in a process Operating expense All the money the system spends to convert inventory into throughput; including, utilities, scrap, depreciation, and so on 16-33

Service Operation Problems Service scheduling often presents challenges not found in manufacturing These are primarily related to: The inability to store or inventory services The random nature of service requests Service scheduling may involve scheduling: Customers Workforce Equipment 16-34 Scheduling

Scheduling Service Operations Scheduling customers: Demand Management Appointment systems Controls customer arrivals for service Reservation systems Enable service systems to formulate a fairly accurate estimate demand on the system for a given time period Scheduling the workforce: Capacity Management Cyclical Scheduling Employees are assigned to work shifts or time slots, and have days off, on a repeating basis 16-35 Scheduling

Operations Strategy If scheduling is done well: Goods and services can be made or delivered in a timely manner Resources can be used to best advantage Customers will be satisfied It is important to not overlook the importance of scheduling to strategy and competitive advantage 16-36