Warm Mix Asphalt System 9/15/08. Warm Mix Asphalt System Features: –Reduces mix temperatures by up to 90º F without costly additives –Uses Terex patented,

Slides:



Advertisements
Similar presentations
MCS LWC MAGNUM ORIGINAL CONCEPTS  Designed to Control Loop Systems  Build to be generic and handle many configurations of Loop Controllers  Type of.
Advertisements

Hot Water Temperature Maintenance
Operating Nitrox Systems 11 Presented by Nuvair. Operating Nitrox Systems2 Membrane systems produce nitrox efficiently Compressed air flows through the.
Thermostats, Pressure Switches, and Other Electric Control Devices
HEATING AIR © Commonwealth of Australia 2010 | Licensed under AEShareNet Share and Return licence.
Asphalt Concrete Mix Design and Construction
Warm Mix Technology The Canadian Perspective J.Keith Davidson P.Eng. McAsphalt Industries Limited Toronto Ontario Canada CUPGA – 2007 – Niagara Falls.
Jade Titus Cargill Meat Solutions Schuyler, NE. Tech Rendering Melt Tanks  Inefficient use of steam  Over cooks the tallow (emulsifies)  High temperatures.
① The output signal of a room thermostat is ON or OFF according to changes of room temperature ② The power supply to a motorized valve is ON or OFF according.
Test Result Relationships
FoamPro 1600 Series Fully automatic Class A foam ONLY
SMA Mixture Design Requirements
Asahi/America New Positioners: Pneumatic Actuators-Westlock P-10,K-10 Electric Actuators-Peaktronics-DHC- 100 Competitor Comparison Positioners.
1 Oil Fuel Line De-aerators What they are, what they do and how to install.
Drum Plants Construction1 HMA Production Senior/Graduate HMA Course.
DOUBLE BARREL GREEN SYSTEM AN EQUIPMENT MEANS TO PRODUCE WARM MIX By Malcolm Swanson, P.E. Vice President – Engineering Astec, Inc.
Joy Mist Drilling System Presented By: Dave Paich Joy Mining Machinery
The SR Scale Remover For Cooling Water Treatment Without Chemicals.
GST FIRE ALARM SYSTEM INTERNATIONAL BUSINESS DEPARTMENT , GST BEIJING
January 22, Advanced Modular Sample System Richard E. Hughes.
Warm Mix for a Cold Climate Colorado DOT’s 2007 WMA Project.
JET PROPULSION Part 6 Jet Engine Operation Fuel Systems.
2001, 2002 & 3012 Series Operation 2001, 2002 & 3012 Series Operation (See Installation and Operation Manual for detailed instructions)
Product Introduction.
CBC AUTOJH SYSTEM CONTROLS CHAPTER 10. CBC AUTOJH OBJECTIVES Discuss Operation and Function of controls for Manual and Automatic Climate Control System.
AccuMax Multi-Point Injection Mechanics
RLC-CMS002-E4© American Standard Companies, inc All Rights Reserved Concentration of intelligence, High reliability. Series R TM.
PLC: Programmable Logical Controller
Hydronic Mechanical Controls
Alternative Energy Class Room Automation Control System Lighting and Temperature Control By: Al Woodward EET-2011.
ENGINEERING YOUR SUCCESS. PDF Market and Sales Meeting Refrigerated Dryers.
Lease Automatic Custody Transfer
Advera® WMA Zeolite WMA Technical Working Group December 12, 2007 Annette Smith PQ Corporation Thank you for inviting to speak with you today regarding.
Water Handling Operations
Air-Source Heat Pumps I North Seattle Community College HVAC Program Instructor – Mark T. Weber, M.Ed. Airsource Heat Pump 1.
BOILER PLANT OPERATION Presented By Mr. Sivanand Ray
Air conditioning – Refreshes your life EWTP MBY Applied Systems Sales1 EWTP-MBYNN Air-cooled Heat Recovery.
1 Medical Office Building. 2 Occupancy – 400 persons 8 a.m. – 5 p.m. Monday - Friday Building Characteristics Three stories 40,000 square feet (200’ x.
2010.
The complete flow monitoring solution Measure – Display – Switch – Transmit.
Component Environmental Test Chamber Jeff Hughes 1, Peter Adam 1, Thong Vo 2 and Phong Ngo 2 1. Department of Mechanical and Material Engineering, 2. Department.
LDA Large Display for Analog Inputs. Agenda What is the LDA? Easy programming About the input Setpoint control Communication Other features Packaging.
HiMA TRIAL REPORT AUSTRALIAN TOUR PRESENTED BY WYNAND NORTJE 9 SEPTEMBER 2011.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
CUE – Make Any Pump an E-Pump
Machinery Cooling Water System Locations and Operations.
HMA PLACEMENT. NCAT 2 To Be Covered Hauling Placement Compaction.
PVWC Hydrostatic Pumps. PVWC Hydrostatic Pump Features Control Selection –Mechanical Pintle w/o neutral by-pass (M-N)
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
PVWC Hydrostatic Pumps. PVWC Hydrostatic Pump Features Control Selection –Mechanical Pintle w/o neutral by-pass (M-N)
The complete flow monitoring solution Measure – Display – Switch – Transmit.
HEAT-GENERATING EQUIPMENT INTRODUCTION SELECTION EFFICIENCY FURNACES BOILERS CENTRAL HVAC SYSTEMS.
James McIntyre VRF Training Manager V5 Key Components.
WSHP Systems 1.
It’s…….
Design, Evaluation and Application of a Fuel Cell Vehicle
Unit 13 Oil-Burning Equipment
The New C55* CPVSd 10-20hp People. Passion. Performance.
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
“Desuperheater” High Efficient Energy conservation Device for Refrigeration Use
Module 3 Domestic Heating/MMA Welding
Chiller Plant Manager (CPM)
Elizabeth Stoneham Kathryn A. Ramirez-Aguilar, Ph.D.
Loop Water Controller Overview
Introduction of fuel feed system
VITALITY Large Splits Johnson Controls PowerPoint Guidelines | July 21, 2009.
Liebert DSE High efficiency thermal management
Joint Venture between IEC and Dor Chemicals
Presentation transcript:

Warm Mix Asphalt System 9/15/08

Warm Mix Asphalt System Features: –Reduces mix temperatures by up to 90º F without costly additives –Uses Terex patented, field-proven foamed asphalt technology, originally pioneered in 1998 –Single expansion chamber ensures consistent AC/water mix at any production rate –Produces foamed asphalt just outside of the drum and immediately injects it into the drum’s mixing chamber, evenly coating the aggregate –No moving parts (except water pump and meter) –Fast easy installation into existing drum –Complete kit requires only jacketed AC and water feed pipes to be customer-supplied –Complete AC system is hot oil jacketed –Patent pending

Terex Foam Warm Mix Process Expansion Chamber Water Pump Existing AC Pump Counterflow Drum Water Tank Foam Injection pipe running along side existing AC pipe “Hot Mix” Production“Warm Mix” Production Click to Start “Warm Mix” Existing AC pipe Click here to start Hot Mix

Injection Pipe Components: Jacketed Expansion Chamber Jacketed AC Check Valve Insulated inject pipe with hot oil heat trace Jacketed Tee with heat trace and sample port Insulated inject pipe with hot oil heat trace

Controls and Water Skid: –PLC control system to accurately control water injection and foam production –The display shows water flow rate as both GPM and TPH –Water skid includes tank, filter, 5 hp (3.73 kW) variable-frequency motor driving positive displacement water pump, high-accuracy water meter and calibration valve –Three-way, jacketed, electrically actuated AC valve –Asphalt and water check valves to prevent reverse flow of AC and water –Patented foam expansion chamber –Inject tube with multiple nozzles, adjustable for specific drum designs –Existing AC inject pipe is retained for “hot mix” production

Plant Control I/O needed –Analog input providing accurate AC tons per hour –0 – 10 VDC or 4 – 20 ma –Customer will need to supply loop power for this output also –Digital input to start/stop –115 VAC –Input needs to be timed to “ON” when the AC needs to hit the drum mixing chamber –Input needs to be “OFF” when the AC is “re-circulating” –Input needs to be “OFF” when AC is in “suck back” mode –Two contacts provided on the PLC digital input card –(No need to isolate with a relay) –Digital outputs –Water running –Water fault –Digital outputs are isolated hard contacts so customers can supply any input source they choose for feedback

Tested in 1992 Cedarapids Magnum Drum

Testing and results –Installed on a 1990s-vintage Cedarapids Magnum Plant –Mixing temperatures were lowered to between 245 to 280 degrees F, whereas common mixing temperatures for this same Type E design is 335 degrees in its hot mix form. –Mix was then trucked to the paving site and laid at ambient temperatures as low as 37 degrees F. –The rollers compacted the mix at temperatures ranging from 180 to 245 degrees F. –Crews reported that even at these lower temperatures, the mix was very workable for the rollers and by hand. –Lab tests of the warm mix asphalt showed compaction densities, air voids and other lab tested criteria closely matched results found in the same mix design produced using traditional hot mix techniques –Rutting performance tests revealed the warm mix asphalt performed better.

Lehman Roberts internal report –Overall we were very pleased with the process. Aesthetically there was no noticeable difference and it –was very workable for a longer period of time despite the cold temperatures. Based on this one trial the –Warm Mix is at least as good, if not better than “normal” mix.

Installation on E3-400P (RK Hall) Inject Pipe InstalledMixing chamber and piping installed (no insulation) Water system detail RK Hall purchased the system to reduce odor that was a source of complaints from neighbors. The system successfully address their concerns and has been used daily since mid July

Hot Mix vs Warm Mix Comparison Results from Lehman Roberts Customer demonstration days Comparison of same mix design made as “hot mix” then “warm mix”

Hot Mix vs Warm Mix Temperatures

Stack Analysis Results

Hot Mix vs Warm Mix 411-E Hot Mix411-E Warm Mix AC Content 5.53% (5.5%)5.35%(5.5%) Gradation GoodGood (Fine) Theoretical Gravity Bulk Specific Gravity Air Voids 2.9%3.8% (3.5%) Moisture Content 0.08%.20% Stability 1775(1500)1750 (1500) Temperature at Paver 310 ºF260 ºF Nuclear Density 93%-95% Core Density 93.7%92.2%

Installation options available: Components included: New Retrofit Terex Drum Other Drum Foam Inject pipe Retain Existing AC pipe for hotmix  Expansion Chamber AC and Water Check Valves Hot Oil Jumpers Stand Alone Controls  Water Skid

Installation on new E3 drum Expansion Chamber AC Check Valve Water Check Valve Inject pipe

Pricing:

Next Steps: Parallel flow drum installation –Partner company found –Components the same (modified inject pipe) –Installation this fall Batch Plant –System quoted –Components the same (including controls) –Complexity depends on plant configuration

Next Steps: Double Barrel –Use same: Check valves Water skid Expansion chamber Controls –New Injection Pipe –No moving parts, single point mixing, simple to maintain.