WISH LISTS. GHS Install building wide phone system w/voicemail Remodel Office area w/AC Enlarge parking lot near LC Replace asbestos floor tile Pave gravel.

Slides:



Advertisements
Similar presentations
SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Advertisements

Tam Valley School Modernization - Phase 1 Summer 2011.
1 Zero Tax Increase Referendum: Community Information Session.
The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.
Addressing Highest Priority Facility Needs
MARPLE NEWTOWN SCHOOL DISTRICT FACILITIES. Maintenance & Small Projects Planned for Summer 2007 New carpet at Worralls office New fencing at Worralls.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
With the passage of the May 2009 NLISD Bond Election, campuses made improvements and repairs. New flooring in the elementary schools, updated kitchen.
N EXISTING FACILITIES BUILDING “A” -Principal’s Office -Workroom -(9) 3 RD Grade Classrooms - (4) 4 TH Grade Classrooms -Life Skills Classroom -Title.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
Current Project Update October 25th 2012 Good Evening!!!
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
School District Merger Study Crown Point Central School and Ticonderoga Central School Facilities April 17, 2013 Castallo and Silky Education Consultants.
WANTS & NEEDS. Design Your Ideal Environment For Restrooms & Hallways HALLWAY SOUNDPROOF TOWEL DISPENSER OR AIR DRY & PROPERLY LOCATED AUTO AIR FRESHNER.
Quarterly Report September 9, I Lafayette Elementary - New flooring.
Facilities Update Site Improvements Encinitas Union School District September 5, 2006.
BOND 2013 Election Day November 5th. SMART School BOND 2013 November 5 th Ballot Proposal Bond proposal for facility & site improvements to address student.
Glenvar High School Renovations School Board Presentation
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 2, 2008 BUILDING  TOMORROW  TODAY 1.
MCPS MAINTENANCE AND CAPITAL IMPROVEMENTS 2015 – 2016 BUDGET.
Building Services Department Summer Building Services Capital Improvement Program Capital Improvement Program Maintenance Custodial Environmental.
Board Meeting – June 24,  Communication  The Countdown!
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
ADDITION & REMODEL Eugene Field Elementary School.
Northwest ISD Lakeview Elementary School Additions and Renovations Lakeview Elementary School Additions and Renovations
Finishing the Building
ACOUSTICS (EF) WALL STRUCTURE FOR SOUNDPROO FING (EF) NOISE ABATEMENT (C) SPECIAL NEEDS STUDENTS EQUIPMENT (C) PROPERLY EQUIPPED WITH TEACHER RESOURCES.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
High School Task Force DECATUR PUBLIC SCHOOLS 02/03/2009.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
©2009 Strang, Inc. Orchard Ridge United Church of Christ September 20, 2009.
DEDHAM PUBLIC SCHOOLS FY 2008 Approved FY 2009 Approved FY 2010 Approved Education Technology Program 275, Roof Replacement - High School750,
Spencer High School – School Network The Muscogee County School District utilizes a wide area network (WAN) with all school connecting to a data center.
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
Capital Improvement Program for September 9, 2014.
Focus Areas Safe and secure buildings and grounds Learning environments that meet the needs of today’s learners Preserve, maintain, and/or improve current.
Facilities Modernization Program Funded by Measure B Project Report September 21, 2015.
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
SUMMER 2015 DEFERRED MAINTENANCE
Learning, Health, and Safety Capital Project Alternates and Change Order
Questions From these four questions yielded the following cards… 1)Thinking of Facilities….What’s needed to create a “comfortable” learning environment?
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS High School Building Project.
Proposition S “Students First” Election Day, Tuesday, April 5.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Welcome! Thank you for coming!. Thank you for Choosing Sacred Heart Opened in 1960 under the Irish Order of the Sisters of Mercy. Out of 29 schools in.
Measure G Bond Projects. Message from the President ….. Monument Refurbishment Project.
FY2017-FY2026 GDRSD Capital Plan-June 22, 2016 Jared Stanton, Director of Business and Finance.
Oconee County Schools Five Year Facility Study April 27, 2011.
Facilities Focus Group
White Pigeon Community Schools
Vassar strong vision Inspire Future Excellence…Learn, Achieve, Succeed
Cornwall Central School District
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Capital Improvements Presentation
Dr. Joseph Meloche Superintendent of Schools Mrs
Facilities Update November 17, 2017
The summer of 2018 and all the work that has taken place
Charter Oak Unified School District
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
WES Renovation Update Photo Gallery
Park Place Wesleyan Gala 2019
Blue Ribbon Committee Summary Report
EAST PENNSBORO AREA SCHOOL DISTRICT
Moving from Consumers to Producers Kings Park Central School District
Zumbrota-Mazeppa School District Community Survey Results
Presentation transcript:

WISH LISTS

GHS Install building wide phone system w/voic Remodel Office area w/AC Enlarge parking lot near LC Replace asbestos floor tile Pave gravel area on step Rekey interior of building Resurface floors in RR – add Exhaust Repair/Replace auditorium seating, ceiling, AC, audio system Add locker room N end of Ftball field Add equipment storage and multipurpose/wrestling room Add new press box, restrooms, concession, east side of football field Replace existing poles/lights on football field Expand existing track Pave parking area around fields Extend curbing around SS Blvd Remove cabling/posts along SS Blvd Add restrooms to existing weight training room Repair ceiling in Thiel Gym Repair pool area walls/repaint pool Redesign main entryway Fix/replace roof leaks AC entire building Replace aging student desks/chairs Add covered portico from main gym to locker room Replace interior lighting controls w/motion detection sensors

Churchill Add football locker room, equipment storage, 4 classrooms, auxiliary gym Add landscaping in front of building Repair roof over auditorium Paint metal or replace on west side roof Update building electrical to accommodate new technology Add driveway on S side of bldg for bus traffic only Replace floor tiles in hallways & some classrooms Renovate all restrooms Add fence along Mary Street Sand & seal stage floor, replace carpet down runways in auditorium

Lombard Concrete work needed around building Repair AC/Heating system in 8 th grade wing Upgrade the track Heat issues in the 1939 building to be addressed Update wiring in older building Upgrade in library New performing arts wing New labs and sinks in science lab 7 th grade Repair emergency room buttons & clock system

Gale Change office layout Improve appearance of entrance to building Addition of auxiliary gym AC throughout building Addition of another entrance/exit to Gale – traffic flow problems Renovate restroomsClocks Replace cafeteria tables Concrete work front sidewalk/entrance Improve outside lighting for security Install outside cameras Replace boiler Replace lighting in gym Upgrade phone system Phone access in each room Additional copiers Add copy room, teachers lounge, meeting room Replace floor tiles in copy room and in vault area Paint or replace metal on outside of building Improve air circulation in classrooms Additional classrooms needed due to population increase Increase size of computer lab Add electrical outlets in classrooms

King Alternative Gym Video security upgrades Ceiling fans in classrooms AC throughout building Need for designated drop off in S parking lot Communication system upgrades Faculty lounge Copy center upgrades – AC/upgrade electrical Electrical upgrades throughout the building Phone upgradesNatural ceiling lighting Additional Exterior lighting on the playgrounds Window upgrades Additional rooms needed – classrooms, meeting rooms, data Noise reduction in hallway New teacher workstations Move office to the front of the building

Nielson Install AC Renovate main restrooms Upgrade exterior lighting on playground Telephone access to each classroom Additional electrical outlets Roof repairs/pitched roof needed Improved circulation within the pod areas Move office area to the front of the building Extend parking lot on the N side of the building Add Landscaping in the front of the building Additional multipurpose room Add additional classrooms and general use space for increasing population by adding a 2 nd floor

Steele Update electricity for new technology needs Building an additional gym/fitness center Additional security cameras installed New roof Renovate main restrooms Improve circulation in pod areas Phone lines throughout the building Move office areas to front of the building Install AC Lighting on playground upgraded Additional classrooms, offices for instructional services

Silas Willard Sand and reseal gym floor Locate & reactivate ceiling vents in 2 nd floor Add ramp for handicapped access from E gym to main floor Repair/replace cement steps E of gym and back of stage entrance Add windows that open in stairway to 2 nd floor Renovate all restrooms Replace floor tile in several classrooms Install lockable furnace Window access in basement EBD room #4 Install better lighting on stage Repaint interior walls, ceilings, stage area Repair/replace wallpaper upper level of gym Update electrical systems for modernizing technology Build walls in office area for nurse/principal Install ceiling fans in classrooms Install AC Replace carpet in building Install electronic sign Install larger canopy at entrance off parking lot Install additional proximity card entrance door on all outside doors Open up lab and library areas Copy center upgrades Remove carpet and install rubber like stairs for stairway and entrance hallway Add , 105, 110 Upgrade exterior lighting around building/parking lot Communication upgrades to classrooms/office New teacher workstations Security upgrades outside of building

Technology Need for more space for labs, repairs, etc More training time for technicians Additional staffGive each child a laptop and support Add additional storage for computer files Automate exchange date between all server with SIF Connect district to internet at much faster speed Allow students to have internal addresses Install high speech fiber optic cabling between buildings Have inter district television station we could broadcast events to every classroom Frequent meetings with department heads, principals to better serve the needs of staff/students Wireless in every classroom, additional power, video conferencing, telephone