Leak Testing QC of Cold Vacuum Systems the story so far………. Paul Cruikshank on behalf of TE-VSC colleagues & AL4030 Consortium (S133) 1 Paul Cruikshank.

Slides:



Advertisements
Similar presentations
Going towards LHC Run2 CRYOGENICS 5 th Evian Workshop 2-4 June 2014 SESSION 4 - Systems 2 - Status and commissioning plans (HW perspective) Krzysztof Brodzinski.
Advertisements

Summary of session 3: Optimise Interventions and Recovery from Collateral Damages on Cold Sectors Prepared by Caroline Fabre & Pierre Strubin Based on.
Improved anchoring of SSS with vacuum barrier to avoid displacement Ofelia Capatina (speaker), Katy Foraz (coordinates all the activities), Antonio Foreste,
LHC HARDWARE COMMISSIONING REVIEW May 2005 CRYOGENIC VACUUM SYSTEM Paul Cruikshank for AT/VAC.
A. Perin, CERN, TE-CRG, 26 May Review of the cryogenic by-pass for the LHC DS collimators 26 May 2011 Modifications to the DFBs, DSLC and cryogenic.
LEAK TESTING in SMACC Cold vacuum system recall Phase 1, 2 & 3 VSC activities Resources, Infrastructure Still to do Paul Cruikshank on behalf.
QRL Leak Tests the story so far………. Paul Cruikshank on behalf of TE-VSC colleagues & AL4030 Consortium (S133) 1 Paul Cruikshank TE/VSC - QRL Leak Tests.
Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline:  History: Status of 2009 cleaning  Foreseen and.
1 Integration of collimators in the dispersion suppressors Status of 11 T cryo- assembly integration Dec 17, 2013
Laurent Tavian Thanks to contribution and helpful discussions with M. Jimenez, V. Parma, F. Bertinelli, J.Ph. Tock, R. van weelderen, S. Claudet, A. Perin,
Overview of SMACC-QA 1.Recall of SMACC-QA organization 2.Tuning the procedures 3.Main results from the QC teams 4.Auditors findings Ranko Ostojic 23 July.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Session 3 - What repair activity can be done today on a locally warmed-up sub-sector Paul Cruikshank TE/VSC What repair activity can be done today on a.
Beam Vacuum Quality Control Outline  VSC consolidation  VSC support  Organization  Status Cédric Garion on behalf of TE-VSC Cédric Garion TE/VSC Beam.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
1 Vacuum – Much Ado about Nothing V. Baglin with inputs from P. Cruikshank CERN TE-VSC, Geneva Vincent Baglin LHC Performance Workshop - Chamonix 2011.
05 Novembre 2003Chamonix XIV Workshop, January How to deal with leaks in the QRL and magnet insulation vacuum Paul Cruikshank for AT/VAC Germana.
Technology Department 1 Visit to Hall 180: Presentation of the consolidation process Third LHC Splice Review, November 12, 2012.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
OLAV III Experience with the LHC Insulation Vacuum System S. Blanchard, P. Cruikshank, B. Jenninger, N. Kos, W. Maan, L. Mourier, N. Provot, J. Wallner.
C. Garion Presentation Outline  Overview of the inner triplet interconnections  Q1/Q2, Q2/Q3 interconnections  General view  Working conditions  Compensation.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project … Courtesy ….
Vacuum, Surfaces & Coatings Group Technology Department (some) Other non-solved NC across the LHC ring and potential impact on performances V. Baglin.
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
MPE Workshop for LS1 / 22 & 23 Nov. 2012, G. D’Angelo TE/MPE-EE ELQA during LS1 train, Special measurements and NCs Magnet replacement: AIV Splices consolidations:
Work Organisation for Splice Consolidation Francesco Bertinelli 20 minutes presentation, 10 minutes discussion: 12 slides First LHC Splice Review, CERN,
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
CHAMONIX XV QRL installation and first experiences of operation G. Riddone on behalf of the QRL team AT/ACR-cd Acknowledgements to AT/ACR-op and AT/ACR-in.
RF power couplers vacuum issues J.M. Jimenez Vacuum, Surfaces and Coatings Group (TE-VSC)
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
Can we change a magnet without warming-up a full arc ? Serge Claudet, With help from P. Cruikshank & J-P. Tock (Chamonix Jan’10)
Quality Assurance Overview Ranko Ostojic 12 Nov 2012.
D. Delikaris, TE-CRG, LSC 25th Meeting Page 2 October 18 th, 2013 LS1 Committee (LSC)- 25 th Meeting D. Delikaris, TE-CRG Cryogenics activities.
TE-CRG Activities D. Delikaris, TE-CRG.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
A. Perin, TE/CRG, DFBA LSC Page 2 LHC Long Shutdown 1 Committee June 14 th, 2013 A. Perin (TE-CRG) On behalf of the DFBA splices consolidation.
Proposed integration of cryo BLMs in LHC during LS1 V.Parma, CERN, TE-MSC With contributions/input from: M.Sapinski (BE-BI) Th.Renaglia (EN-MME) N.Bourcey.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
MSC Technical Meeting 29 August 2013 Overheated QBBI.A21L6 F. Savary with contributions from N. Dalexandro, H. Prin, C. Scheuerlein, P. Voisin.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
LHC Machine Advisory Committee Meeting no.19 QRL status 16 June 2006 G. Riddone, AT-ACR On behalf of the QRL team.
LHC Risk Review Installation Progress Francesco Bertinelli – TE/MSC 5 March, 2009 (20 minutes) On behalf of - and with several contributions from – the.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
Workshop on cryogenic & vacuum sectorisation of the SPL Vacuum Sectorisation Paul Cruikshank, CERN Technology Department (TE) Vacuum Surfaces & Coatings.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
L. Tavian, TE/CRG, LSC Page 2 February 21 th, 2014 LS1 Committee (LSC) L. Tavian TE-CRG.
1 Status of the 11T cryo-assembly design and integration Presented at ColUSM #34, February 21, 2014
LIU and TE/VSC activities LIU-SPS aC coating & flange impedance reduction Paul Cruikshank LIU & TE/VSC activities, 23/6/2016 Paul Cruikshank.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
SMACC Eighteenth report [20 min] 07/02/2014
Cold mass design, assembly plans and QA/QC at CERN
Roadmap for triplet cryostats
SMACC Tenth report [15 min] 13/09/2013
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Update of cryogenic activities
LS1 Committee January 24th, 2014
LHC Dipole Diode Insulation Consolidation Review (I) INTRODUCTION
Consequences of warming-up a sector above 80 K
Hollow e- lens, Cryogenic aspects
J.M. Jimenez On behalf of TE-VSC group
Update on development of consolidated insulation system and procedures C. Scheuerlein, 4th DISMAC meeting,
The 11T cryo-assembly: summary of design and integration aspects
K. Foraz on behalf of OSS members
On behalf of TE-VSC group
Closing of sector 7/8 Interconnections of LHC cryomagnets
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

Leak Testing QC of Cold Vacuum Systems the story so far………. Paul Cruikshank on behalf of TE-VSC colleagues & AL4030 Consortium (S133) 1 Paul Cruikshank TE/VSC - Leak Test QC of Cold vacuum Systems - 4 th Splice Review, 23/7/2013

Leak Testing QC of Cold Vacuum Systems - What? Phase 1 leak test – Prior to splice consolidation (Arcs, LSS, QRL)  Air to insulation vacuum  Helium to insulation vacuum  Helium to beam vacuum Phase 2 leak test – During splice consolidation  intermediate testing of new welds: SIT, DFBA, DN200 – on-going M lines – starting today PIM – not yet started Phase 3 leak test – After splice consolidation  Global leak tests after re-closure, including pressure test 2 Complete Paul Cruikshank TE/VSC - Leak Test QC of Cold vacuum Systems - 4 th Splice Review, 23/7/2013

Leak Test QC Sequence: Leak test executed according to procedure by trained technician, Daily report of executed tests & results prepared by team leaders, Result is checked by staff or COFREND certified contract support, Result recorded and stored on TE-VSC-EIV sharepoint page, Result recorded in WISh (where applicable), If NOK, create NCR in MTF (staff or certified contract support), 3 Paul Cruikshank TE/VSC Leak Testing QA SMACC QA team meeting 11/4/2013

Leak Testing of Cold Vacuum Systems Phase 1 - Why?  Status of vacuum system tightness  Localisation of known leaks  Localisation of any new leaks  Leak repairs in masked time  Early warning of unexpected problems 4 Paul Cruikshank TE/VSC - Leak Test QC of Cold vacuum Systems - 4 th Splice Review, 23/7/2013

Leak Testing of Cold Vacuum Systems Phase 1 – Helium to BV leaks 5 Status for LHC arcsS5-6S4-5S6-7S7-8S1-2S8-1S3-4S2-3 He to BV leaks Courtesy J.Finelle Paul Cruikshank TE/VSC - Leak Test QC of Cold vacuum Systems - 4 th Splice Review, 23/7/2013

Phase 1 – Air to IV leaks 0-ring 6 MB vessel at central foot B31L5, A21L8 C16R5, A26L7 B32L8 Foot flange o-ring C22L4 Q6L8 Connector feedthrough Jumper weld/material Q7L2 Q29R2 Q21L3 Q21R3 Q33R7 Status for LHC arcsS5-6S4-5S6-7S7-8S1-2S8-1S3-4S2-3 Air leaks (identified to component) Paul Cruikshank TE/VSC - Leak Test QC of Cold vacuum Systems - 4 th Splice Review, 23/7/2013

22 ‘known’ He leaks in IV prior to LS1 Highest priorities are:S3-4, A27L4.M, cold mass circuit S4-5 QRL SubS B, line C – repair with TE-CRG Note:- LHC operates with these leaks - the 2 big leaks weren’t present at RT after welding & P.Test  - some known leaks accepted ‘use-as-is’ due to lack of time during installation  - some known leaks weren’t found to component level despite search during installation  7 Paul Cruikshank TE/VSC - Leak Test QC of Cold vacuum Systems - 4 th Splice Review, 23/7/2013

Helium leak observations in IV ‘Green’ helium leak – IV pressure is rising…………. ….leak elimination will avoid perturbation to cryo system during temp transients 8 Paul Cruikshank TE/VSC - Leak Test QC of Cold vacuum Systems - 4 th Splice Review, 23/7/2013

Helium leak observations in IV ‘Red’ helium leak – IV pressure rise & then limited by turbo pump speed… …leak elimination will reduce heat loads and avoid reliance on turbo pumps for pressure equilibrium 9 Paul Cruikshank TE/VSC - Leak Test QC of Cold vacuum Systems - 4 th Splice Review, 23/7/2013

Phase 1 – Helium to cryomagnet IV - Correct test conditions have allowed 4 ‘known’ leaks to be discarded.  air leak near gauge, or Penning gauge error, oil vapour pressure (see later) - 4 newly observed small ‘green’ leaks may be due to correct test conditions/extra scrutiny… internal helium leaks identified in arc subsectors after warm-up – 14 identified to component (for repair).  for 6 leaks not identified to component, further tests to be performed in phase 2. - Triplet 5L – helium leak in FF circuit (inside DFBX) stable since 2009 – propose continue ‘use-as-is’. - NC follow-up in MTF. 10 Status for LHC arcsS5-6S4-5S6-7S7-8S1-2S8-1S3-4S2-3 He to IV leak - ‘known’ (pre LS1 data) He to IV leak - identified to subsector2+1(+1)0+1(+1)2+2(+1)1+0(+0)1+0(+1) (+1) He to IV leak - identified to component2+1(+0)0+0(+0)2+1(+1)1+0(+0)0+0(+1) (+1) Paul Cruikshank TE/VSC - Leak Test QC of Cold vacuum Systems - 4 th Splice Review, 23/7/2013

LT Phase 1 – internal leak types 11 M weld or collar (x3) M2N flexible (x3) K collector (x4) QBBI.8L7, QQBI.22L7, QBBI.B34L7, QBBI.B21R6 K flexible (x3) QBBI.B26L3, QBQI.9R2, QBEI.11R3 QQS current leads (x1) QBQI.9L2 (Q8) QQBI.13L6 (M3) QQBI.7R5 (M2) QBBI.A29L4(M3) Paul Cruikshank TE/VSC - Leak Test QC of Cold vacuum Systems - 4 th Splice Review, 23/7/2013 QBQI.18R5 QBQI.26R7 QBQI.33R3

Phase 1 – Helium to QRL IV LS1 foreseen objectives: - Collaborate with TE-CRG to repair known (observed Dec’ 2010) internal helium leak in S45. - Check helium residuals & air leaks after warm-up of the 72 subsectors: but,large & fast pressure rises seen in IV of 5 QRL subsectors during LS1 warm-up, 6 additional internal helium leaks confirmed (5 not present during 2013 operation), all 7 confirmed on header C at multiply compensator. - QRL analysis/action plan/repair is on-going………………….in shadow of SMACC 12 Paul Cruikshank TE/VSC - Leak Test QC of Cold vacuum Systems - 4 th Splice Review, 23/7/2013

Phase 2 - Leak test support for M welds 13 - Dedicated leak testing teams. - Results (to be) documented in WISH - Long clamshell tool has been developed and validated: to test 2 M welds simultaneously, to pump and backfill the 214m He volume at a predefined unwelded M sleeve, to bridge a splice NC (if left unwelded). - Standard clamshells also available (M, SSS diode). - First subsector – 16 interconnects - released for vacuum test yesterday (22/7/2013) Paul Cruikshank TE/VSC - Leak Test QC of Cold vacuum Systems - 4 th Splice Review, 23/7/2013

Phase 2 - Leak test support to SIT 14 - Leak testing team attached to SIT production, - Weekly meeting to review past week, next week, any issues, - Test tooling operational - optimisation is continuous process (VSC & MSC)….. - Results documented on VSC/EIV sharepoint page. Paul Cruikshank TE/VSC - Leak Test QC of Cold vacuum Systems - 4 th Splice Review, 23/7/2013

Phase 2 - Leak test support to DFBA 15 - Leak testing team available for DFBA production, - Test tooling optimisation is continuous process (VSC & CRG)….. - Results documented on DFBA site & VSC/EIV sharepoint page. Paul Cruikshank TE/VSC - Leak Test QC of Cold vacuum Systems - 4 th Splice Review, 23/7/2013

Phase 2 - Leak test support to DN Leak testing on call for DN200 production, - Baseline is to make sample intermediate testing to check process (100% phase 3 test) Start of production (~35 made at S78 start) Change of weld parameters/procedure (~ 8 made), Series (5%) - Results documented in WiSH & VSC/EIV sharepoint page. DN200 weld leak (1 E-1 mbarl/s) Adjacent to QQBI.A29R8 Paul Cruikshank TE/VSC - Leak Test QC of Cold vacuum Systems - 4 th Splice Review, 23/7/2013

Phase 2 – oil & MLI observations 17 On-going checks: TE-VSC confirms no abnormal insulation vacuum pressure in affected subsectors TE- CRG confirms no abnormal heat loads in affected subsectors. Oil composition analysis on-going – primary pump oil? Origin of oil? Incident during LHC installation tests, eg mobile pump malfunction? Incident during LHC cold operation eg negative pressure gradient cryostat to fixed pump? MLI debris? May come from fast venting/vacuum break – when ? Connection between oil & MLI debris not (yet) understood. Q26L6 - oil in cryostat Sector 8-1 (A11L1.M & A15L1.M) & 2-3 (A11R2.M), Oil traces at several interconnects, accompagnied with MLI debris Paul Cruikshank TE/VSC - Leak Test QC of Cold vacuum Systems - 4 th Splice Review, 23/7/2013

Results so far….. Leak Test summary: Phase 1:He to BV– no problems Air to IV– several NC to solve He to IV cryomagnets – 20 confirmed existing leaks, 14 localised for repair He to IV QRL- 7 confirmed compensator leaks, repair on-going Phase 2: SIT, DFBA, DN200– ok, on-going M welds– just starting…. 18 Paul Cruikshank TE/VSC - Leak Test QC of Cold vacuum Systems - 4 th Splice Review, 23/7/2013