Status report for Helium bag and Gauss meter installation for D5 2009.9.24 Hiroshi Kou.

Slides:



Advertisements
Similar presentations
Helium Bag Readiness. Scattering chamber Clamshell flange (not here yet) Coffee can collimator Polyurethane Balloon (sides only) 10 m Mylar Balloon.
Advertisements

Fig. 4-1, p Fig. 4-2, p. 109 Fig. 4-3, p. 110.
Richard Soluk – University of Alberta. The LHCb VELO Region R. Soluk --- University of Alberta --- MoEDAL Collaboration Meeting --- CERN June
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
Interim Design Amy Eckerle Andrew Whittington Philip Witherspoon Team 16.
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
G2P Target installation and Beyond. Schedule Pivot before.
P.464. Table 13-1, p.465 Fig. 13-1, p.466 Fig. 13-2, p.467.
Fig. 11-1, p p. 360 Fig. 11-2, p. 361 Fig. 11-3, p. 361.
Table 6-1, p Fig. 6-1, p. 162 p. 163 Fig. 6-2, p. 164.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
Zoran Andjelkovic Johannes Gutenberg – Mainz University GSI Darmstadt Laser Spectroscopy of Highly Charged Ions and Exotic Radioactive Nuclei (Helmholtz.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
BES III Main Drift Chamber MDC group Yuanbo Chen June 5,2002, Beijing.
Mounting arrangement for the Solid Absorber. This contains mounting arrangement for:- 1. Handling and lifting from manufacturer’s place to RAL; 2. For.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
CRYO PIPING & INTER-MODULE CONNECTIONS Yun He, Daniel Sabol, Joe Conway External Review of MLC Daniel Sabol, MLC External Review 10/3/2012.
Quality Control Rad T 110.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Design Progress Allen Ellis 18-September
HPS Collaboration Meeting JLAB, May Tracker Design Status M.Oriunno, SLAC.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
20to2T5m100cm Images Van Graves February 13, 2014.
News from the lab Large size Micromegas chambers Saclay, April Givi Sekhniaidze / Joerg Wotschack.
HQ01e CERN test preparation update CERN Team: H. Bajas, M. Bajko, A. Chiuchiolo, G. Deferne, O. Dunkle, J. Feuvrier, P. Ferracin, L. Fiscarelli, F. Flamand,
HPS Beamline: Background Rates, Sensitivity to Field Uncertainties M. Ungaro1HPS Collaboration Meeting, JLAB, May Concrete Wall thickness Study.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Status of Torino-Dubna Production Aluminum Plates production: Torino: steady production ongoing, 2715 plates cut, 194 chambers=48MB1.
BES-III Workshop Oct.2001,Beijing The BESIII Luminosity Monitor High Energy Physics Group Dept. of Modern Physics,USTC P.O.Box 4 Hefei,
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
K. Matsuoka (Kyoto Univ.) for T2K muon monitor group
Mechanical Integration for the AD at LNL. Overview New reaction chamber and beam-line Telescopic Beam Line Beam Dump Summary.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
M1 Central Part Cable Routing R3 FAR R2 CLOSE R2 FAR + GEM A3 B From chain GEM R2 CLOSE R2 FAR A1 20 A1 A1 A2 A CHAIN Access Front Dané.
C. CombaretSept 2007 Thoughts on DHCAL slabs What we need : Around 40 detector plans stacked in 1 meter Large plans : around 2 m x 1 m (70cm x 70cm for.
330 mm 290 mm 210 mm 60 mm 20 mm The magnet Beam through a hole of 75 mm in the yoke Pole gap: 90 mm.
Baby Mind C OIL DESIGN AND ASSEMBLY SCENARIOS Helder Silva Phillipe Benoit Alexey Dudarev Gabriela Rolando Herman ten Kate Etam Messomo Laurent Nicola.
Physics Requirements Sensitivity to Manufacturing Imperfections Strategy  where to map field  measure deviation from ideal model  fit to error tables.
 1) Introduction  2) GEANT simulations  3) NEW DESIGN : Technology and Assembly  4) Conclusions Reported by G.Feofilov, CBM meetings, Dubna.
Physics Chapter 21: Magnetism. ☺Magnets ☺Caused by the Polarization of Iron Molecules ☺Material Containing Iron (Fe)
After Protons from RCS 1 st DeeMe Collaboration Meeting Dec. 10, 2012 Kazami Yamamoto J-PARC Center Accelerator Division.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
Engineering Measurements
Introduction to the MAGIX Target General Design
Multiplication table. x
Integration issues at IHEP
MDL0L02 Dipole Hysteresis Loop Study
Example Example 1: A number of lead blocks and aluminium plates are placed in front of a radioactive source. The source emits ,  and  radiation.
66th ISOLDE Collaboration Committee meeting
5 × 7 = × 7 = 70 9 × 7 = CONNECTIONS IN 7 × TABLE
5 × 8 = 40 4 × 8 = 32 9 × 8 = CONNECTIONS IN 8 × TABLE
4 × 6 = 24 8 × 6 = 48 7 × 6 = CONNECTIONS IN 6 × TABLE
5 × 6 = 30 2 × 6 = 12 7 × 6 = CONNECTIONS IN 6 × TABLE
Cooler e-source Magnetized Beam LDRD Progress Report
XY Scanner Mount.
10 × 8 = 80 5 × 8 = 40 6 × 8 = CONNECTIONS IN 8 × TABLE MULTIPLICATION.
3 × 12 = 36 6 × 12 = 72 7 × 12 = CONNECTIONS IN 12 × TABLE
ISO view of pipe w/ individual EC detector installed
5 × 12 = × 12 = × 12 = CONNECTIONS IN 12 × TABLE MULTIPLICATION.
Measurement and Characterization of a 5T Solenoid Field
5 × 9 = 45 6 × 9 = 54 7 × 9 = CONNECTIONS IN 9 × TABLE
3 × 7 = 21 6 × 7 = 42 7 × 7 = CONNECTIONS IN 7 × TABLE
Cooler e-source Magnetized Beam LDRD Progress Report
Presentation transcript:

Status report for Helium bag and Gauss meter installation for D Hiroshi Kou

☆ Helium bag design and arrangement ・ Helium bag is designed for reducing multiple scattering in D5 magnet. ・ D5 magnet have arch formed hole. The hole size is 380×120. ・ Helium bag is designed through the magnet’s hole. ・ The bag’s thickness is 38μm about the part of passing particles. (the other part is all 50μm ) ・ The bag is made using Mylar. ・ gas connector is connected sinflex tube (called 64) ・ The bag is manufacturing now and delivered September 24 th or 25 th. Fig.1 the design of D5 magnet Fig.2 the design of Helium bag Part of passing particles arch formed hole end guard

☆ The arrangement plan about Gauss meter ・ In D5 magnet,magnet's center and particle's orbit center is different (~60.9mm) ・ The center of magnet is ~1100mm from end-guard and Gauss meter's tube is ~2000mm. ・ we put hole probe on the magnet center ・ I designed Gauss meter and hole probe holder red:particle orbit blue:magnet center Fig 3.difference of center in D5 magnet 68.75° 55° Gauss meter 1100 Hole probe

☆ the design of hole probe holder ・ hole probe holder will be arranged,from the end-guard to the magnet center ・ the probe has to be fixed perpendicularly to the magnetic field ・ clear cover is designed to protect probe's head from the helium bag's pressure Magnet center end-guard 3 Fig.4 the design of hole probe holder Probe Clear cover

☆ the design of Gauss meter holder ・ There is a limited space to install the Gauss meter holder between D5 end-guard and Beam-line chamber. ・ aluminum plate(the thickness is ~1cm) is necessary for attaching the Gauss meter holder ・ we need request support for tapped holes to fix aluminum plate on D5 magnet Fig5. The arrangement plan chamber and CDC end-guard Gauss meter holder Aluminum plate Fig 6.the arrangement plan of Gauss meter holder Anchor hole D5 end-guard Beam line chamber CDS beam 6.875° ~6cm 56cm

☆ time table ・ Range stack holder → installed already ・ Helium bag → delivered by September 24 th or 25 th ・ Hole probe holder and Gauss meter holder → manufacturing now,delivered until September 28 th and installed around September 30 th