EUG 20/06/2012 News from Electronic Modules design, manufacturing and assembly Betty Magnin TE-MPE-EM 1.

Slides:



Advertisements
Similar presentations
BTEC First Engineering
Advertisements

CARICOM. Ninth EDF Project Caribbean Integration Support Programme (CISP ) Statistics Component 34th MEETING OF THE STANDING COMMITTEE OF CARIBBEAN STATISTICIANS.
BTEC First Engineering
TE-MPE-EM Costing Betty Magnin 29/11/ Costing History Operational budgets Invoicing Cost balancing over fiscal year 2 29/11/2012.
D. Peterson, Cornell University, “Tracking Detector R&D at Cornell University and Purdue University” ALCPG Arlington 09-Jan-2003 Tracking Detector R&D.
CERN Betty Magnin / Erik van der BijTS-DEM TS-DEM Development of Electronic Modules Betty Magnin / Erik van der Bij CERN Electronics Design Office.
MPE Workshop 14/12/2010 Building 107- project Raphaël Berberat
ENTER The Clil4U project has been funded with support from the European Commission. This publication reflects the views only of the author, and the Commission.
Maintenance and Engineering Procedures and Tools at Soreq Applied Research Accelerator Facility I. Gertz, Y. Buzaglo, A. Grin, R. Michael, R. Raizman,
Dr. Turgay Maleri President, GATE Elektronik (METU – Technokent)
Applied Technology High School ATE 1012 Grade 10 Eng. Rose Hasan.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
TE/MPE/EM/PMT Collaborations Rui de Oliveira on behalf of PCB workshop team 29/11/20121.
1 Internal Analysis. 2 Strategic Managers must evaluate the Internal Environment of the organization. What is the process? –Identify and classify variables.
Formerly Flextronics Beijing. About PRItronics Purchased October 15, 2004 from Flextronics. Purchased October 15, 2004 from Flextronics m 2 (29,000.
Workshop Mark Heggli Consultant to the World Bank Expert Real-time Hydrology Information Systems Module 6: Operations & Maintenance and Training.
Workshop Mark Heggli Innovative Hydrology, Inc. Consultant to the World Bank Expert Real-time Hydrology Information Systems Module 6: Training, Operations.
Hospital Facility Managers Association of Delaware Valley.
Introduction of Quality Procedures in the Electronics Design Office
SJDEVLA Advisory Committee Meeting September 6-7, EVLA Production and Maintenance Steven Durand presenting for the E lectronics Division.
CERN Rui de OliveiraTS-DEM TS-DEM Development of Electronic Modules Rui de Oliveira CERN CERN hybrid production experience (or how to stay out of trouble)
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
9/19/2012 Controlled copies of SMI documents are maintained within SMI. Printed or electronic copies in other storage locations are uncontrolled This manual.
CERN workshop upgrade Aida fund Transfer to industry Rui De Oliveira 4/13/20111Rui De Oliveira.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
June 1 rst, Consolidation for E-cloud and High Voltage cards N.Vauthier TE-CRG LS1 projects review:
CERN Workshop upgrade Rui De Oliveira KOBE WG6 WG6 9/1/20111Rui De Oliveira.
Value chain. Introduction Value Chain Analysis helped identify a firm's core competencies and distinguish those activities that drive competitive advantage.
1. Hardware: each component on the microcontroller will need to be tested individually using multi-meters, logic analyzers, and circuit probe analysis.
Information Security 14 October 2005 IT Security Unit Ministry of IT & Telecommunications.
EUG 01/02/2011 News from Electronic Modules design, manufacturing and assembly Betty Magnin TE-MPE-EM 1.
CERN EST -DEM CERN Erik van der Bij EP ELECTRONICS ADVISORY BOARD 4th Meeting 7 November 2002 Erik van der Bij CERN EST-DEM Group leader.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
SunSatFriThursWedTuesMon January
TE-MPE Annual Meeting Activity report of EM section 11/12/2015 Betty Magnin.
SJDAdvisory Committee May Production & Maintenance Steven J. Durand May 2006.
CERN Workshop upgrade status Rui De Oliveira RD51 22/11/2011 WG6 WG6 9/1/20111Rui De Oliveira.
Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander,
TE-MPE-EM: Subcontracting Raphaël Berberat
TE-MPE-EM Assembly workshop Betty Magnin 29/11/
TE-MPE-EM Design Office William Billereau 29/11/
 A PCB is printed circuit board, also known as a printed wiring board. It is used in electronics to build electronic devices. A PCB serves 2 purposes.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
PSL Metrology Pte Ltd – CSE Training Overview PSL Metrology Pte Ltd, confidential.
Energy Huntsville Opportunity Report and Government Collaboration April 2016.
PCB Assembly. INTRODUCTION  PCB abbreviation is a printed circuit board,also known as a printed wiring board.  For electronics PCB is used to build.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – FY 2014/15 – Cost to Completion Risks – Top level to completion – R9 working space – Summary.
L5 Assembly Plans in Vienna 5 February 2013 Christian Irmler (HEPHY Vienna) 3 rd PXD/SVD Workshop Wetzlar, Germany.
1 Fleet Sourcing Project Presented to the City Council By Wayne Corum, Director Equipment Services Department (ESD) November 17, 2009.
EN-ICE-DEM Some figures for job requests throughout the whole section, including 280 designs (new or modifications) 700 in-house MPGD and PCB.
MPE-EM Workshop The assembly workshop S. KaufmannJune 16, 2016.
Kent State University, Kent, Ohio Liquid Crystal Institute
Large volume GEM production Rui De Oliveira TE/MPE/EM
WELCOME TO GOTOGUIDE.
Subcontracting of electronics modules
Microcontroller Evolution
Blanco Environmental Control System
Subcontracting and company selection
Total Cost of Ownership: Considerations
Complementary ISTC Projects #3888, 3889p
Project to Develop a Fully Autonomous Vehicle for a Field Environment
Outsourcing Strategies
Board of Education Workshop – April 2015
Paramit Corporation – Prophix story
Instrumentation Development Lab: facilities/resources
Advanced Research Electron Accelerator Laboratory
Microcontroller Evolution
Annual Inventory Verifications Concur Travel Update Surplus Update
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Presentation transcript:

EUG 20/06/2012 News from Electronic Modules design, manufacturing and assembly Betty Magnin TE-MPE-EM 1

Design Internal facilities Outsourcing EUG 20/12/2012 TE-MPE-EM some figures 2

EUG 20/06/ TE-MPE-EM News Design and planning office Design office: Since Michel Couturier retired in June 2011, the Cadence librairie is managed by the FSU team (1 new resource hired in April 2012). Planning and procurement : 2 FSU resources since February with a technical profile and able to purchase components. Subcontracting: 2 contracts for PCB manufacturing (IT and UK) Building 107: Construction design completed, building 174 demolished, adjudication for construction contract by June finance commitee. Finished building before the end of 2013.

EUG 20/06/ Building 107- project

EUG 20/06/2012 5

6 Laser Direct Imaging for image transfer (replaces photoresist process with an increased resolution) installed in March New flying probe for electrical test installed in May 2012 All investment to manufacture large MPGD components (RD51) purchased, and for most of them (4 out of 9), installed and in service. TE-MPE-EM News PCB manufacturing workshop

EUG 20/06/ Strong involvement in the ATLAS nSQP project : set up and documentation of the assembly process, the tooling and the infrastructure for PCB and wiring; hiring and training of 6 temporary people for a 1-year period. Remplacement of the soldering oven in progress Acquisition of a Mydata Jetprinter to replace stencil screen printing of solder paste. Installation and setup forecast for Q TE-MPE-EM News PCB assembly workshop

EUG 20/06/ TE-MPE-EM in Building 867

EUG 20/06/2012 Equipments for the general purpose repair area installed. 8 diagnostic cells installed with benches, shelves, and generic set of repair equipment (soldering iron, ESD tweezers, screw-drivers,…) The workshop is presently available to store « normal », not radiated, material and for non-destructive work. The workshop will be classified when RP equipment (common to the whole building) is installed. An intermediate solution could be found if urgently required. Sylvain Kaufmann will be RPE for this area. 9 The workshop should be fully in operation by 2012/Q3 The electronic repair workshop in B867

EUG 20/06/ Questions ?