Computer & Telecom Rooms. 2 Business or building protection ? BUSINESS PROTECTION  Smoke is the problem  Small and Medium Size (<200…400 m 2 )  Activation.

Slides:



Advertisements
Similar presentations
Heating, Ventilation, and Air-Conditioning (HVAC) Systems
Advertisements

UNIVERSITY of NORTHERN COLORADO HOT WORK PROGRAM.
Worktops LogisticsLab DesignCustomer ServiceOffice FurnitureSafetyService Systems TestingFume CupboardsStorageCabinetsLab FurnitureAbout Köttermann References.
The Care and Feeding of Silane Art Garcia FM Global March 23, 2006.
Construction Methods and Materials HVACR HVACR. Construction Methods and Materials HVACR Comfort Equipment required to control: Temperature Moisture Air.
Aspirated Smoke Detection
SPRINKLER PROTECTION IN ATRIUM SPACES, IS DELUGE AN OPTION?
Fan Coil Unit Product Line-up. FCU Home Application Show.
Carbon Dioxide Systems 1.Carbon dioxide properties 2.Storage 3.Uses 4.Limitations 5.Types of systems 6.Local Application 7.Total Flood.
Basic Refrigeration Cycle
Fire protection systems
INTD 51 human environments building systems. heating/ventilation/air-conditioning (HVAC) maintain a comfortable indoor climate control temperature and.
Viking TotalPac2 FireFlex Dual / 1230
FIRE FIGHTING PROCESS HAZARDS
N.F.P.A. 13R Justin Bohlmann FIR-204.
SAFETY TALK - SLIDE 1 OF 14 Elkhart Products Corporation 08/00 WELCOME ELKHART PRODUCTS CORPORATION “TOOLBOX SAFETY TALK” Welding, Cutting, & Burning.
Stages of Fire Detections and Extinguishants From Ginge-Kerr Danmark A/s & BMTT Corporation S/B (www. ginge-kerr.com)
Welding, Cutting, & Burning. GENERAL HAZARDS General hazards of welding include: –Impact –Penetration –Harmful dust –Smoke –Fumes –Heat –Light radiation.
Through Penetration Firestops.
AUTOMATIC SPRINKLERS.
Spray Finishing Operations/Spray Booth March 9, 2009.
HOT WORK PROCEDURES Welding and Hot Work, such as brazing or grinding present a significant opportunity for fire and injury. CCR Title 8 Sub Chapter 7,
3-1 NFIRS 3 Structure Fire Module. 3-2 ObjectivesObjectives The participants will be able to: –describe when the Structure Fire Module is to be used.
Hangar Water Based Fire Protection
Chapter 9. Please read chapter 9.  Please review, know and understand the terms related to fire protection page 284.  Know the Classifications of.
CVFD Training – Fire Protection Systems
Presentation on Installation of a Domestic Cold Water Storage Cistern
STEAM HEATING.
Module C Sprinkler systems (4-20)
Control Rooms  Serve as operations centers for the control and monitoring of a service or process  Flight control rooms  Power generation control rooms.
Research Affecting the Design and Use of Water-Based Fire Suppression Systems Russell P. Fleming, P.E. IFSA Technical Director.
Kidde Engineered Fire Suppression System 25 bar Equipment Hardware Engineered for use with 3M™ Novec™ 1230 Fire Protection Fluid.
Technology in Architecture Lecture 12 Electrical Equipment Electrical Power Management Fire Protection Systems Lecture 12 Electrical Equipment Electrical.
Patrick Thornton, SNS/FPE June 9, 2008
Fire Safety.
Learning, our way Examples of bad installation. CONTENT Installation related examples Installation related examples Application related examples Application.
HVACR311 – Electrical for Refrigeration International Mechanical Code Relating to Refrigeration.
NEXT GENERATION Kidde Engineered Fire Suppression System Designed for use with 3M™ Novec™ 1230 Fire Protection Fluid.
Batteries The purpose of the battery is to act as a reservoir for storing electricity.
HAZARDS IN THE HOME. Environmental Hazard Radon Asbestos Lead Hazardous Waste Carbon Monoxide.
Air Conditioning International Mechanical Code
FIRE BEHAVIOR State of Georgia BASIC FIRE FIGHTER TRAINING COURSE Module 1.
Fire Safety Month Fire Safety Tips for October Department of Risk Management James Madison University.
1 HVACR318 – Refrigeration II International Mechanical Code Relating to Refrigeration.
Unit 4: General Safety Practices
Fire Protection Systems Chapter 6. Fire Protection Systems Most of the time you will work with an electrical engineer or fire-protection designer to coordinate.
Chapter 5 ID 234 Building Codes Fire Resistant Materials and Assemblies.
Spray Booths Follow safe operating instructions. Spray-finishing operations  Organic materials  Inorganic materials  Dispersed form  Deposited to.
1 System Design. 2 Primary Detection Secondary Detection Standards Pipe Design.
ME444 ENGINEERING PIPING SYSTEM DESIGN
Hot /Cold Aisle Containment  Traditional Data Center/Telco designs are changing significantly!
Technology in Architecture Lecture 18 Fire & Life Safety Fire Protection Systems Lecture 18 Fire & Life Safety Fire Protection Systems.
Hot Work Permit Osan AB Fire Emergency Services.
© 2012 MITSUBISHI HEAVY INDUSTRIES – MAHAJAK AIR CONDITIONERS CO., LTD. All Rights Reserved. Bad case of Installation RAC-B-A07.
Building The topic ‘Building’ can be divided into three parts: Passive fire protection Fire protection that is built-in in the building (for example fire.
Air condition installation
Desert Cooler.
Memorial Hospital Miramar
Technology in Architecture
Borbotech BV • Tel.: +31(0) • •
Electrical Gas Plumbing Heating & Cooling
“ Highlighting the risks and challenges presented by modern data-center cooling systems in fire detection and suppression applications. “ Dave Boyack Sales.
NFIRS 3 Structure Fire Module
Tracer Applications.
FIRE SUPPRESSION SYSTEM.
Presentation transcript:

Computer & Telecom Rooms

2 Business or building protection ? BUSINESS PROTECTION  Smoke is the problem  Small and Medium Size (<200…400 m 2 )  Activation by aspirated detection  Products  DAU 20 S...  DAU 20 R…  Approvals  DAU 20 S (FM)  There is no FM, UL or VdS approved fire test protocol for DAU R room extinguishing system BUILDING PROTECTION  All sizes  Activation by detection or elevated temperature  Products  GPU Light Hazard  wet pipe  pre-action  DAU 20 S  Approvals  GPU Light Hazard  VdS (OH1)  FM (LH)  DAU 20 S (FM)

3 Smoke is the problem  Cable and plastic fires creates very large amounts of smoke in the fire  The smoke will damage the computer and telecom equipments  Burning of PVC cable will produce Hydrochloric acid vapors(HCl)  Cables, which fire resistance is improved by halogens(chlorine, bromine, fluorine, iodine) will produce acidic vapors in the fire  PTFE insulated cables will produce very corrosive fire products, if burned  Halocarbon extinguishing systems will produce acidic breakdown products, like hydrogen fluoride (HF) in the fire  The discharge of all of the extinguishing gases creates a homogenous mixture of smoke and extinguishant throughout the enclosure, reducing the visibility and making the environment more hazardous, and spreading the dust and corrosive vapors inside the computer or telecom equipments

4 Smoke Scrubbing  Hi-fog spray heads in scrubbing pipework  high velocity fog causes venturi effect  smoke sucked into pipework  water drops condense at bend  “dirty water” to drain

5 Scrubbing efficiency HCl Level without scrubbing with HI-FOG scrubbing

6 Water Effect On Equipment  Minimal water amount - 15 l / unit  De-mineralised water - same as used to clean smoke damaged computers  1st phase, heavy scrubbing and extinguishing - First 30 seconds - 10 l water/unit  2nd phase, “dry fog” - Last 8 minutes - 5 l water/unit  Start of air-conditioning quickly de-humidifies room

7 00:00 Sub-floor System  Cable or joint fire in sub-floor  1st alarm level  2nd alarm level shuts off air-conditioning  Optionally starts safe shutdown of equipment

8 00:0000:30 Sub-floor System  3rd alarm level activates HI-FOG  First 30 seconds high density fog in scrubbing pipes  Replaces hot smoke with cool air in sub-floor and cabinets

9 00:0000:3003:00 Sub-floor System  Changed to “dry fog”  Little water actually discharged in space  Extinguishes fires in sub- floor and cabinets  “Black water” in drain

10 00:00 Sub-floor & Room Extinguishing  Arson fire in waste basket  1st alarm level  2nd alarm level shuts off air-conditioning  Optionally starts safe shutdown of equipment

11 00:0000:30 Sub-floor & Room Extinguishing  3rd alarm level activates HI-FOG Sub-floor system  First 30 seconds high density fog in scrubbing pipes  Over pressurisation prevents smoke entering cabinets

12 00:0000:3005:00 Sub-floor & Room Extinguishing  Hi-fog heads on ceiling discharging into room  Sub-floor changing to “dry fog”  Over pressurisation prevents smoke entering cabinets  Extinguishes fire in sub-floor, cabinets and room

13 The HI-FOG Package  HI-FOG spray heads & mounting adapters  Smoke scrubbing pipework  Ø 100…110 mm  metal and plastic (PPS)  Stainless steel tubes, Ø12 mm  Self-contained HI-FOG Cylinder Unit(s)  No section valves  Easily replaced standard nitrogen cylinders  Designed to be used with early detection system  IRIS, Stratos, Vesda

14 Sub-floor system - DAU 20 S  For sub-floor smoke scrubbing and fire extinguishing  DAU 20 S  20 liter water cylinder assembly (10l+10l) - Upper cylinder 10 liters of water - Lower cylinder 7,5 liters of water  Sub-floor system  2 nitrogen cylinders  2 spray heads  Ø 110mm metal scrubbing duct

15 Sub-floor system - DAU 20 S  Design criteria by FM  max. sub-floor height 0,5 m  max. room size 5 x 10 m  25 m 3 per system  duct holes in short side  two U-loops with opposite discharge directions  Multiple systems installed back-to-back along the long side  Computer safe shut down started

16 Room extinguishing - DAU 20 R  For room fire extinguishing  DAU 20 R-3-4  20 liter water cylinder assembly(10l+10l) - Upper cylinder 10 liters of water - Lower cylinder 7,5 liters of water  Room extinguishing system  3 nitrogen cylinders  4 spray heads (ceiling mounted)  DAU 20 R-3-3  DAU 20 R-2-2  DAU 15 R-1-1

17 Room extinguishing - DAU 20 R  Design criteria  max. distance from wall 2 m, spacing 4 m  max. ceiling height 3m  max. area and volume /head 12,25m 2 and 37,5 m 3  for 3…5m ceiling heights spacing shortened based on volume protection

18 Large data and telecom centers  DAU20S for sub-floor + GPU with sprinklers for the room  Or GPU with sprinklers for sub-floor and for room

19 SMOKE is the problem Why Use Gas? If