Project Cost Management Chapter 7
Chpter#5 -part#1 Project Scope and Human Resource Planning
Chapter 6: Project Cost Management
Chapter 7: Project Cost Management
Project Cost Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project Management.
BTS730 Cost Management. Average cost overrun: –1995 CHAOS study: 189% of the original estimates –2001 study: 145%
Chapter 10: Monitoring and Controlling Change
Chapter 5: Project Scope Management
Degree and Graduation Seminar Cost Management
Information Technology Project Management, Sixth Edition Note: See the text itself for full citations.
What is Project Cost Management?
Project Cost Management J.-S. Chou, P.E., Ph.D.. 2 Learning Objectives  Explain basic project cost management principles, concepts, and terms.  Discuss.
HIT241 - COST MANAGEMENT Introduction
Project Cost Management J.-S. Chou, P.E., Ph.D.. 2 Learning Objectives  Explain basic project cost management principles, concepts, and terms.  Discuss.
Project Cost Management
6-1 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e CHAPTER 6 Estimating Project,
Chapter 7: Project Cost Management
Cost Management Week 6-7 Learning Objectives
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
Chapter 7: Project Cost Management
PPMT CE-408T Engr. Faisal ur Rehman CED N-W.F.P UET P.
Appendix A Project Management: Process, Techniques, and Tools.
Conducted By: Dr. Madhu Fernando, PMP, DBA, MEng. MGT PROJECT MANAGEMENT LESSON 5 AND 6: PROJECT PLANNING – TIME AND COST PLANNING AND MANAGEMENT.
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
Project Cost Management. Information Technology Project Management, Fourth Edition 2 Learning Objectives Explain basic project cost management principles,
McGraw-Hill/Irwin© 2008 The McGraw-Hill Companies, All Rights Reserved Estimating Project Times and Costs Chapter 5.
Software Project Management (SPM)
Chapter 7 The Project Schedule and Budget Copyright 2012 John Wiley & Sons, Inc. 7-1.
9-1 Project Management from Simple to Complex. 9-2 This work is licensed under the Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported.
Management & Development of Complex Projects Course Code - 706
~ pertemuan 9 ~ Oleh: Ir. Abdul Hayat, MTI April 2009 [Abdul Hayat, Project Cost Management-1, Semester Genap 2008/2009] 1 PROJECT COST MANAGEMENT (1)
Project Cost Management
BSBPMG504A Manage Project Costs Manage Project Costs Project Cost Processes Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG504A.
BSBPMG504A Manage Project Costs 7.1 Estimate Costs Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of developing.
BSBPMG503A Manage Project Time 6.4 Estimate Activity Duration The process of approximating the number of work periods needed to complete individual activities.
Estimating Project Times and Costs CHAPTER FIVE Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All Rights Reserved. 10/27/07 SJSU - Bus. 286 David Bentley (Gray & Larson)1 Chapter 5 – Estimating.
Project Cost Management Information Technology Project Management, Fifth Edition.
Project Cost Management. What is Cost and Project Cost Management? Cost is a resource sacrificed or foregone to achieve a specific objective or something.
OPIM 3801: Principles of Project Management Last Day of Class.
Chapter 7: Project Cost Management
Review for exam II October 20, Format for exam 70 multiple choice 3 sets of discussion questions.
Information Technology Project Management, Sixth Edition.
SOFTWARE PROJECT MANAGEMENT
Information Technology Project Management, Eighth Edition Note: See the text itself for full citations.
Information Technology Project Management, Six th Edition Kathy Schwalbe Copyright Disampaikan Oleh : Wiwid Dolianto S.Kom, MT Universitas Muhammadiyah.
Chapter 6 Project Cost Management. 2 Learning Objectives Explain basic project cost management principles, concepts, and terms. Discuss different types.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
BSBPMG503A Manage Project Time Manage Project Time Project Time Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit Code.
Project Time Management Based on PMBOK 5 th Edition Abdelrahman Sheta, PMP,ITIL 1PMP - Project Time Managementfacebook.com/Sheta.Page.
Project Cost Estimation and Management. Learning Objectives Understand the importance of project cost management. Explain basic project cost management.
Project Management 1 Project Control. Project Management 2 Topics Project Control Status Reporting Earned Value Analysis.
Developing the schedule – Tracking Gantt charts Critical path method – Longest path, earliest time Schedule trade-offs using CPM – Free slack, total slack.
Week 7 – Project Cost Management
Project Cost Management
Project COST Management
CHAPTER:7 Project Cost Management
Project Management – PTM712S
Chapter 7: Project Cost Management
7.3 Determine Budget The process of aggregating the estimated costs of individual activities or work packages in order to establish an authorised cost.
The Project Schedule and Budget
Chapter 7: Project Cost Management
Chapter 7: Project Cost Management
Chapter 7: Project Cost Management
Project Cost Management
What is Project Cost Management?
Project Cost Management
Chapter 7: Project Cost Management
Presentation transcript:

Project Cost Management PMI Knowledge Areas Project Cost Management

Project Cost Management Processes Process Group Cost Management Process Major Output Planning CP1: Planning Cost Mgmt Cost Management Plan CP2: Estimating Costs Activity Cost Estimates CP3: Determining the Budget Cost Performance Baseline Monitoring and Controlling MC1: Controlling Costs Work Perf. Measurements Budget Forecasts

Types of Costs and Benefits Tangible costs or benefits Intangible costs or benefits Direct costs Indirect costs Sunk cost Basic Principles of Cost Management Learning curve theory Reserves Contingency reserves Management reserves

CP1: Planning Cost Management The project team uses expert judgment, analytical techniques, and meetings to develop the cost management plan A cost management plan includes: Level of accuracy and units of measure Organizational procedure links Control thresholds Rules of performance measurement Reporting formats Process descriptions

CP2: Estimating Costs Project managers must take cost estimates seriously if they want to complete projects within budget constraints It’s important to know the types of cost estimates, how to prepare cost estimates, and typical problems associated with IT cost estimates Input 1) HR Plan 2) Project Schedule 3) Scope Baseline 4) Risk Register Tools/Techniques 1) EstimatingTechniques 2) Cost of Quality 3) Reserve Analysis 4) PM Estimate Software 5) Expert Judgment Output 1) Activity cost estimates 2) Estimate Bases 3) Update docs

My Health Intranet Sites What are the primary costs for the intranet site project? What is the best way to create estimates for the project?

Categories of Cost Estimates The number and type of cost estimates vary by application area.

Cost Estimation Techniques Basic tools and techniques for cost estimates: Top-down estimates Analogous Parametric modeling

Cost Estimation Techniques Basic tools and techniques for cost estimates: Bottom-up estimates PERT Ex. The pessimistic cost estimate for an activity is $11,000, the optimistic estimate is $3,000 and the most likely estimate is $4,000. What should you use for the expected estimate?

Using Estimation Techniques Top-Down Technique Externally: used by organizations completing IT projects for other companies Internally: can be used for similar projects Problem You are dealing with IT Less Accurate Estimates

Using Estimation Techniques Bottom-up Technique Based on the WBS Creates a detailed estimate of each work component More Accurate Can separate across phases Would be better for controlling costs (Monday’s lecture)

Which technique is being used? Based on the description below, what kind of estimate is being used? It will take 20 hours of a programmer’s time to write this program. The average rate to hire a programmer is $50 per hour. Therefore, the cost of writing this program, assuming that everything else needed to write the program, such as a computer, is in place, is 20 x $50 = $1,000.

Typical Problems with IT Cost Estimates Estimates are done too quickly People lack estimating experience Human beings are biased toward underestimation Management desires accuracy Contingency reserve is often used to reduce the risk from these problems

PM Network: Estimates are just that “We are headed down the path of providing more precise estimates in an environment that is not as precise and where costs fluctuate greatly.” Managing estimates through the lifecycle Agile Estimating Formulas for success

PM Network: Estimating Errors “treat estimates as a living process and not a one time event.” Approaches Matching Skill Sets Share Accountability

Review: Cost Estimate Technique (Parametric, Reserve Analysis, Bottom-up Estimate, Three-point estimate) It was discovered that there are many unknowns about an activity and that it could cost a lot of more than estimated because it could take longer. So, some money is put aside to deal with the situation There is a complicated activity for which there are many disagreements among the team about its cost estimate. So, an estimate was created by taking the average optimistic estimate, pessimistic estimate and realistic estimate. The manager still had doubts about the estimate above so the complex activity was split up into smaller pieces. Estimate costs were placed on these pieces and then all were added up to reach the final figure/ For another activity, the number of work hours needed were multiplied by the hourly rate of a programmer

CP3: Determining the Budget Cost budgeting involves allocating the project cost estimate to individual work items over time The WBS is a required input to the cost budgeting process since it defines the work items Reserve analysis must occur Contingency reserves Management reserves

Figure 7-4. Surveyor Pro Project Cost Baseline

Chapter Summary Project cost management is a traditionally weak area of IT projects, and project managers must work to improve their ability to deliver projects within approved budgets Main processes include Plan cost management Estimate costs Determine the budget Control costs

CAPM – Things to know Project budget is time-phased project cost (aggregating individual activity costs) Contingency Reserves Deal with uncertainties in schedule/cost Deal with overruns of the project objectives Analogous estimating takes less time but is also less accurate Memorize the formulas for EV, CV, CPI, PV, SV, SPI