High-gradient Experiments with Narrow Waveguides Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto,

Slides:



Advertisements
Similar presentations
Single-Cell Standing Wave Structures: Design
Advertisements

5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Review of waveguide components development for CLIC I. Syratchev,
CERN-KEK X-band collaboration 3 Dec T. Higo on behalf of X-band group of KEK.
Status and plan for X-band high field experiments at KEK US High Gradient Collaboration Workshop University of Maryland Jan , 2008 KEK T. Higo.
Report from KEK High gradient study results from Nextef (+ other related activities) LCWS2011, Granada Sep. 27, 2011 T. Higo.
1 X-band Single Cell and T18_SLAC_2 Test Results at NLCTA Faya Wang Chris Adolphsen Jul
High Gradient and High Q R&D Topics 1- Explore Q > for TESLA parameter flexibility –higher luminosity through higher rep rate, longer rf pulse… 2-
Design of Standing-Wave Accelerator Structure
Update on TERA C-band high gradient test A.D
High power RF capabilities From Two 50 MW Klystrons Variable iris Variable Delay line length through variable mode converter Gate Valves Two experimental.
Walter Wuensch CLIC project meeting, 31 March 2015 Accelerating structure program: design and testing.
SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, The RF Power Coupler Development Program at LAL-Orsay and.
HIGH RF POWER TESTING FOR THE CLIC PETS International Workshop on Linear Colliders 20 th October 2010 Alessandro Cappelletti for the CLIC team with.
Results from Nextef Observations in high gradient tests of CLIC Prototype Structures and associated study activities CLIC2013, CERN 29 January, 2013 T.
Accelerating structure test results and what’s next Walter Wuensch CTF3 collaboration meeting
30 GHz waveguide line modification towards 12 GHz.
Update of KEK X-band Research Activity March 3, 2009 Shuji Matsumoto Accelerator Laboratory, KEK 2009/3/31US High Gradient Workshop.
日米協力 US/Japan cooperation Research of High Gradient Acceleration Technology for Future Accelerators progress report New proposal 7.
040220LCPAC 2004 Structure (T. Higo)1 X-band accelerator Structure LCPAC Feb. 20, 2004 T. Higo KEK.
J. Haimson and B. Mecklenburg Haimson Research Corporation FG02-05ER84362 Work performed under the auspices of the U.S. Department of Energy SBIR Grant.
Statistical analysis of RF conditioning and breakdowns Jorge GINER NAVARRO CLIC Workshop /01/2015 J. Giner Navarro - CLIC WS20151.
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
Development of Dielectric PETS Chunguang Jing and Wei Gai ANL and Euclid CLIC workshop 2013.
Status of X-Band PPM Klystron R&D for JLC KEK Yong Ho Chin ISG9 KEK December 10-13, 2002.
An RF & High-Speed Acquisition Systems for High-Gradient Tests at CLIC Test Facility Raquel Fandos.
X-band high gradient activities at KEK May 13-15, nd Collaboration meeting on X-band Accelerator Structure Design and Test Program T. Higo, KEK.
Modulator and overmoded RF components status for the 12GHz Test Stand at CERN - RF meeting – 17/03/2010.
Recent High-gradient test result at KEK Linear Collider Workshop 2012 Arlington, Texas (WebEx) 25 October, 2012 Toshi Higo and X-band group of KEK.
1.3GHz Input Coupler for ILC
Performance of CLIC prototype accelerator structures tested at Nextef CLIC February 2014 Toshiyasu Higo (KEK)
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
A Study of RF breakdown of Narrow Wave Guide Shuji Matsumoto Kazue Yokoyama Toshi Higo Accelerator Lab., KEK 2016/1/41SLAC Workshop 8-10 July 2009.
Jose Alberto Rodriguez.  Describe how we currently characterize structures at CTF3  Describe how we want to improve the characterization  Learn from.
The CLIC accelerating structure development program Walter Wuensch CARE05 23 November 2005.
EnEfficient RF Sources Workshop. June 2014 I. Syratchev X-band high RF power testing activity at CERN I.Syratchev.
High gradient study at KEK CLIC08, Oct , 2008 T. Higo.
PETS TESTING ANALYSIS 4 th X-band Structure Collaboration Meeting 3 rd May 2010 Alessandro Cappelletti for CLIC collaboration.
Progress of X-Band Accelerating Structures LINAC10, Tsukuba 17 Sep T. Higo (KEK)
W. Wuensch CLIC project meeting High-power rf structure testing.
Status of high gradient experiments at Nextef Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Shuji Matsumoto, Shigeki Fukuda Accelerator Laboratory, KEK.
Nextef results & status International Workshop on Breakdown Science and High Gradient Technology KEK, Japan 18 April 2012 Toshi Higo.
KCS Main Waveguide Testing Chris Adolphsen Chris Nantista and Faya Wang LCWS12 Arlington, Texas October 25, 2012.
Narrow waveguide experiments Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto, Mitsuhiro Yoshida,
Some information from Nextef For poster session in IWLC T. Higo.
Xbox and Structure testing news N. Catalan Lasheras, R. DeGiovanni, J. Giner-Navarro, G. Mcmonagle, I. Syratchev, B. Wooley, X. Wu
02-Dec XB Dec-2010 XB-10 Engineering design, production and follow-up of X-band RF components G. Riddone in collaboration.
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
High Power Crab Cavity Testing Ben Woolley HG2016 Argonne National Lab. 8 th June 2016.
KEK test area plans Shuji Matsumoto Accelerator Lab., KEK.
Advancements on RF systems D. Alesini (LNF-INFN) Quinto Meeting Generale Collaborazione LI2FE, Frascati 15-16/03/2011.
Franck PEAUGER – CEA SACLAY LCWS11 - Grenada 29 th September 2011 High power RF components F. Peauger, A. Branco, M. Desmons, W. Farabolini, P. Girardot,
Areal RF Station A. Vardanyan
High power test results of X-band deflecting cavity
KEK Status and plans of structure production and testing
Development of X-band 50MW klystron in BVERI
CLIC RF Structure Development Mtg, Alexey Dubrovskiy and CTF team
An X-band system for phase space linearisation on CLARA
Application of moderate (5 MW) X-band power sources for the CLIC accelerating structures testing program and other projects I. Syratchev, CERN.
SLAC National Accelerator Laboratory
X-band and high-gradient development plans at Tsinghua University
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
Review of rf structure test results
Shuji Matsumoto Accelerator Lab., KEK
Recent high-gradient testing results from the CLIC XBoxes
A Study of RF breakdown of Narrow Wave Guide
Status of KEK X-band Test Facility and its future plans
5th X-Band Structure Collaboration Meeting
T18_VG2.4_Disk_#2 processing summary
Field-Emission mapping measurement on Copper Surface
Presentation transcript:

High-gradient Experiments with Narrow Waveguides Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto, Mitsuhiro Yoshida, Tetsuo Shidara, H iromitsu Nakajima Accelerator Laboratory, KEK WEPP106

2/18 Introduction The study of characteristics of different materials on high-gradient RF breakdown at Nextef (New X-band Test Facility at KEK). Experiments performed using a narrow waveguide with field of approximately 200 MV/m at RF power of 100 MW. Status report on prototype copper (#CU002) and stainless-steel (#SUS003) waveguides. The measurement system for the breakdown rate is set up now.

3/18 Rectangular Waveguide: WR90 Wavelength converter: Width 22.86( g  mm) → 14mm ( g  mm) Cosine taper (  1 g ) : Height mm → 1 mm Calculated to get a low VSWR by an HFSS. Narrow Waveguide Design field gradient of 200 MV/m at an RF power of 100 MW group velocity of around 0.3c

4/18 Fabrication  4 pieces for a narrow waveguide  braze bonding in hydrogen furnace #CU002#SUS003#CU004 materialOFCSUS316LOFC anneal500  C1020  C500  C processingmilling, WEDMmilling cleaningCPSUSpikaCP bondingCu/Au/Ni, hydrogen furnace Cu/Au, hydrogen furnace Cu/Au hydrogen furnace GHz Loss [dB] E-Field MW statusPrototype Tested at XTF Under Testing at Nextef plan to be tested  Annealing in a hydrogen furnace  Processing by milling and and wire electrical discharge machining (WEDM)  E-plane finished by milling.  10  m chemical polishing by acid

5/18 High power Dummy Load RF Narrow waveguide #CU002 Setup for High-Power  The first high-power test of copper(#CU002) was done at XTF (previous X- band Test Facility at KEK). Acoustic sensors PMT 1, 2, 3, 4 PMT 5

6/18 #SUS003 Setup for High-Power Nextef  We are on going high power testing of stainless-steel(#SUS003) at Klystron Test Stand. PPM Klystron Narrow waveguide in 5mm lead shield PMT 5, 6 Acoustic sensors Dummy Load PMT 1, 2, 3, 4  #CU002 tested at XTF (06.11 ~ 07.01) Moving to Nextef ( ~ 07.04) Using for system checking ( ~ 07.05)  #SUS003 Tested at Nextef ( ~ now)

7/18 Processing Interlock system -> a reflect power is large (vswr>1.4) and vacuum degrades for RF component protection.  Options: Controled fixed time and power step RF breakdowns caused deterioration of vacuum Daytime processing Power ~25 MW Time (~8h)

8/18  Control time step (flexible)  Control power step by limiting Vac. (flexible)  Processing time is almost 24 H.  We’re seeking for ways of processing. Processing Vac.< 1E-6 Pa Power~30MW Power step Vac. Time (4h) Pulse width 200ns -> 400ns

9/18 Processing history (Accumulated No. breakdown events vs. power  RF pulse ranged 50ns to 400ns with 50MW at repetition rate of 50pps.  #CU002 had more breakdown events than #SUS003.

10/18 Results of #CU002 and #SUS003 #SUS003 attained higher electric field than #CU002. The temperature related parameter, P*T 1/2, attained approximately 400 MW  ns1/2 of #CU002 and 900 MW  ns 1/2 of #SUS003. P*T^0.5 – the product of RF power and the square root of the pulse width

11/18 RF Power vs. number of BD events Many breakdown events at pulse width > 100ns and power 20MW. Few RF break down events at 50 ns and 100ns. We had a guard window problem around 200ns.

12/18 A rf pulse is detected with a crystal diode and a OSC that calculates a power, vswr and power loss. oscilloscope BD Measurement System

13/18 Data taking from OSC 10 pulses at a System down (HV, trigger and rf off). Changed pulses with 5 % form a normal pulse (area and peak). Estimated power, vswr and power loss We are testing this system now. Problem is pulse shape is unstable from pulse to pulse (rf jitter, rf power and noise). Typical rf pulses at a breakdown events. Transmitted Forward Reflected Reflected upper stream

14/18 After processing, we’ve measured the rate of breakdown events (BDR) at a constant power for one day at 50Hz. BDR of #SUS003

15/18 #CU002 After high-power processing top body  Many breakdown damages were seen on the E-plane surface.  The surface is intensively damaged, and it could also melt due to breakdown. Observation area

16/18 Observation of Breakdown surface (top) by SEM and Laser Microscope  m

17/18

18/18 Conclusion RF breakdown studies on different material has just begun. Prototype #CU002 and #SUS003 had been tested under different system conditions. Number of break down events for #SUS003 is less than that for #CU002 which may be a result of different systems. We’re testing a processing scheme. We’re going to observe the surface of #SUS003 after measuring BDR. We’re going to test #CU004, other stainless-steel waveguides and other materials.