Business Continuity & Disaster Recovery Planning at The Chicago Board of Trade Presented By: Bryan Durkin Sr. Vice President The Chicago Board of Trade.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

FMS. 2 Fires Terrorism Internal Sabotage Natural Disasters System Failures Power Outages Pandemic Influenza COOP/ Disaster Recovery/ Emergency Preparedness.
Detail actions necessary to implement the interim housing mission in the post-disaster environment Identify command and control structures at all levels.
Business Continuity Training & Awareness by Sulia Toutai (ANZ)
Sharing Session: Business Contingency Plan (BCP) Big Flood Disaster
Disaster Preparedness I Lessons Learned Don Hall Thomson Prometric 2006 Annual ConferenceAlexandria, Virginia Council on Licensure, Enforcement and Regulation.
Providence School Board September 10, 2012 Introductory Briefing Providence Public School District Comprehensive Information Technology Blueprint Center.
Chapter 13 Managing Computer and Data Resources. Introduction A disciplined, systematic approach is needed for management success Problem Management,
1 Disaster Recovery “Protecting City Data” Ron Bergman First Deputy Commissioner Gregory Neuhaus Assistant Commissioner THE CITY OF NEW YORK.
JOELLE QUIAPO FOLA OYEDIRAN GREG SWENSON SUKHI BEDI CHENYU GONG Disaster Recovery and Business Continuity Planning: Testing an Organization’s Plans What.
Business Continuity Planning (BCP) & Disaster Recovery Planning (DRP)
Smart Grid - Cyber Security Small Rural Electric George Gamble Black & Veatch
Copyright 2004 Turning Point Solutions Establishing Lines Of Communication Before a Crisis.
AFAMs and Civil Air Patrol PIOs August CAP Mission Summary CAP Mission Summary Training and Qualification Changes Training and Qualification Changes.
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
TEL382 Greene Chapter /27/09 2 Outline What is a Disaster? Disaster Strikes Without Warning Understanding Roles and Responsibilities Preparing For.
Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin CHAPTER FIVE INFRASTRUCTURES: SUSTAINABLE TECHNOLOGIES CHAPTER.
TRAINING AND DRILLS. Training and Drills Ensure A comprehensive, coordinated, and documented program as an integral part of the emergency management program.
TELLEFSEN AND COMPANY, L.L.C. SEC Regulation SCI and Automation Review Policy Compliance March 2013 Proprietary and Confidential.
Disaster Recovery, Business Continuity, and the Cloud January 2014 Joel Maloff Vice President – Channel Development
Gulf Coast Energy International Business Continuity / Disaster Recovery Planning and Design Proposal Prepared by Andrew Rolf, Felipe Torres, Pranay Jaiswal.
Source One Network Solutions with Corporate Headquarters based in Fitchburg, Wisconsin specializes in providing multi- location clients, with nationwide.
Business Continuation Plan / Program Overview State CIO Council Meeting June 24, 2008.
Business Crisis and Continuity Management (BCCM) Class Session
Services Tailored Around You® Business Contingency Planning Overview July 2013.
November 2009 Network Disaster Recovery October 2014.
EASTERN MICHIGAN UNIVERSITY Continuity of Operations Planning (COOP)
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
BCP of Japanese Securities Industry July 5, 2007 Japan Securities Clearing Corporation.
Principles of Computer Security: CompTIA Security + ® and Beyond, Second Edition © 2010 Disaster Recovery, Business Continuity, and Organizational Policies.
HBCU National Workshop June 24, 2011 Disaster Recovery Reggie Brinson Assoc. VP/Chief Information Officer Clark Atlanta University.
ISA 562 Internet Security Theory & Practice
Developing a Disaster Recovery Plan Bb World ’06 San Diego, Calif. Poster Session Presented by Crystal Nielsen, M.A. Instructional Technologist Northwest.
Rich Archer Partner, Risk Advisory Services KPMG LLP Auditing Business Continuity Plans.
C ONNECTING FOR A R ESILIENT A MERICA Business Continuity Planning (BCP) & Disaster Recovery Planning (DRP) Skip Breeden.
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
Information Availability Brett Paulson Sr. VP and Chief Information Officer Board of Trade Clearing Corporation FIA – November 7, 2002.
©2006 Merge eMed. All Rights Reserved. Energize Your Workflow 2006 User Group Meeting May 7-9, 2006 Disaster Recovery Michael Leonard.
Hosted by Why You Need a Storage Management Organization Ray Paquet Vice President & Research Director Gartner.
Montague Technology Management1 Contingency Planning for Year 2000 Montague Technology Management November 19, 1998.
Module 13 Implementing Business Continuity. Module Overview Protecting and Recovering Content Working with Backup and Restore for Disaster Recovery Implementing.
Chicago Board of Trade  The World’s Leading Futures Exchange sm Chicago Board of Trade  The World’s Leading Futures Exchange sm FIA presentation November.
Welcome Georgia Infrastructure Transformation 2010 Kick-off Meeting January 30, 2008.
Business Continuity. Business continuity... “Drive thy business or it will drive thee.” —Benjamin Franklin ( ), American entrepreneur, statesman,
Office of Emergency Management University of Houston-Clear Lake Business Continuity Planning.
Corporate Capabilities October 2015 Corporate Capabilities October 2015 Disruptive Technology Associates, Ltd.
Key Terms Business Continuity Plan (BCP) – A comprehensive written plan to maintain or resume business in the event of a disruption Critical Process –
© 2010 AT&T Intellectual Property. All rights reserved. AT&T, AT&T logo and all other marks contained herein are trademarks of AT&T Intellectual Property.
FIRMA 2010 Larry J. Kallembach April 1, MB Financial Headquarters - September 2008 Chicago is a Lakefront city…….
Disaster Recovery: Can Your Business Survive Data Loss? DR Strategies for Today and Tomorrow.
Business Continuity Disaster Planning
CBIZ RISK & ADVISORY SERVICES BUSINESS CONTINUITY PLANNING Developing a Readiness Strategy that Mitigates Risk and is Actionable and Easy to Implement.
Disaster Recovery Planning (DRP) DRP: The definition of business processes, their infrastructure supports and tolerances to interruptions, and formulation.
AUDITING BUSINESS CONTINUITY PROGRAMS AND PLANS What to Look For Presented by: Tommye White, CBCP, DRP Chuck Walts, CBCP, CRP.
Business Continuity Planning 101
Utilizing Your Business Continuity Plan.
CCNET Managed Services
Berry College Disaster Recovery Soft Exit
Audit Planning Presentation - Disaster Recovery Plan
Business Contingency Planning
Mary W. Anaya Stephanie R. Gallegos November 19, 2008
Business Continuity Planning
Cybersecurity Special Public Meeting/Commission Workshop for Natural Gas Utilities September 27, 2018.
Disaster Recovery at UNC
BUSINESS CONTINUITY PLAN
The Survival Plan.
BUSINESS CONTINUITY PROGRAM
DISASTER RECOVERY RUNBOOK
BUSINESS CONTINUITY PLAN
Presentation transcript:

Business Continuity & Disaster Recovery Planning at The Chicago Board of Trade Presented By: Bryan Durkin Sr. Vice President The Chicago Board of Trade Futures Industry Association November 7, 2002

Introduction For many years, the Chicago Board of Trade has maintained business continuity plans to minimize market disruptions in the event of occurrences that damage or render useless its trading facilities.

In recent years, the Chicago Board of Trade Disaster Recovery strategies have included, but were not limited to, the following: Redundant power feeds to alleviate the dependency of the CBOT on any particular electrical substation Separate data center in a second building to provide redundancies and fail-over to critical systems Documented disaster recovery and business continuity procedures put in place for the technology systems of the Exchange Hot back-up host outside of the Chicago “loop” for Electronic Trading Subscription with recovery provider for Prices, Wall displays and QVN in a limited Disaster Recovery capacity

Modifications Since September 11, 2001 Creation of a Risk Management Group Hiring of a Business Continuity Manager Developed enhanced BCP Phase 1 and BCP Phase II, solutions for off-site disaster recovery and business continuity in the event of a Chicago metropolitan area disaster Development of a Local area Executive Emergency/Incident Management Command Center Development of a Business Continuity/Incident Management Overview and Strategies Plan Implementation of BCP Phase 1 outlined as follows

BCP Phase 1 Initiative: (Complete) –Provides DR for a/c/e Market operations Allows CBOT to maintain Electronic Trading capability by providing recovery through foreign based hosting facility. Price Quote Data Dissemination capability –a/c/e terminals receive a/c/e quotes only –Quote vendor network delivery available by providing redundant backup facility outside of the Chicago metropolitan area. Provides Disaster Recovery for Office of Investigations & Audits supporting Electronic Trading by providing redundant backup facility outside of the Chicago metropolitan area. Executive Emergency Management/Incident Management Command Center Operation by providing redundant backup facility outside of Chicago metropolitan area. –External communications (telephone, , limited CBOT.com web site) –President’s Office administrative systems support and work-area for supporting business groups defined above –Business Recovery Team Operations support

BCP Phase II Initiative: (In development stage) –BCP Phase II – Will provides Business Continuity solution for: Recovery of all mission critical functions capable of providing data center systems fail-over as well as disaster recovery for: –Open Outcry Trading including associated supporting functionality. Off-site disaster recovery facility for supporting business groups defined above Off-site disaster recovery facility for conducting Open Outcry trading

Validation Planning and implementation are critical, however, on-going Validation by exercising the configuration and plans are a requirement of any Business Continuity Program

BCP Phase 1 Validation July 2002 – A Disaster Recovery Exercise with DBS and the Chicago Board of Trade Clearing Corporation took place in order to validate all components of the Electronic Trading backup-host facility. All proposed objectives were successful. October 2002 – A Disaster Recovery Exercise of the Chicago Board of Trades Electronic Trading supporting systems took place in order to validate all components supporting the Electronic Trading environment. All proposed objectives were successful. On-going, integrated exercises, will take place at a minimum of two per year. This will begin to include member firm participation in 2003.

Planning Coordination with Member Firms All CBOT member firms have been contacted regarding our “hot” back-up host, and we are working with all of the firms in providing connectivity to that host. The CBOT also sent a survey to all clearing members and member firms which 1) explains our Business Continuity Plan; and 2) requests a detailed description of each member firms business continuity procedures, including their ability to connect to our electronic trading facilities back-up site. Our member firms have also been requested to provide to the CBOT a comprehensive contact list of personnel that would be responsible for implementing their plans should they be impacted by a disaster. We have always coordinated closely with the Board of Trade Clearing Corporation on all of the CBOT’s trading operations due to our connectivity to their clearing functions, and our disaster recovery and business continuity planning is not different.

Questions