Air Traffic Control Software System Failure Case Study – To-be Scenario Presented by Stanley Dam For SE 6361 Advanced Requirement Engineering 12/07/2013.

Slides:



Advertisements
Similar presentations
MX250 Power on and off, Console Mode. January 2004 Page 2 Power Supply MX250 has ac and dc inputs –ac 100 to 240 V, 5A, 50 to 60 Hz –dc –48 V, 6A –worldwide.
Advertisements

Information Technology Disaster Recovery Awareness Program.
Located in Indianapolis, Indiana Established 1984
Operating Functions.
Slide 1 Copyright : Valiant Communications Limited Slide 1 Orion Telecom Networks Inc Updated: April, 2010 V aliant C ommunications L imited.
Slide 1 Copyright : Valiant Communications Limited Slide 1 Orion Telecom Networks Inc Updated: April, 2010 V aliant C ommunications L imited.
CS 4001Mary Jean Harrold1 High Cost of Software Failure Denver Airport Baggage System (1995): $280M Ariane 5 Explosion (1996): $7B Mars Rover (2004): Unknown.
Your Fleet Management Solution OSHA Logbooks Your vehicle sends information automatically to your password protected Internet Site. From your computer,
Department of Informatics, UC Irvine SDCL Collaboration Laboratory Software Design and sdcl.ics.uci.edu 1 Informatics 121 Software Design I Lecture 5 Duplication.
- Overall Equipment Effectiveness -
Information System Economics IT PROJECT MANAGEMENT - revisited.
KLINGE’S NMR 262 Two Independent Systems Integrated into one Unit This Requires Special Features:  Total Redundancy of Refrigeration Components  Total.
FlareCo Ltd ALTER DATABASE AdventureWorks SET PARTNER FORCE_SERVICE_ALLOW_DATA_LOSS Slide 1.
Diesel Generator Reliability: Lessons Learned from Storms
1 CSSE 377 – Intro to Availability & Reliability Part 2 Steve Chenoweth Tuesday, 9/13/11 Week 2, Day 2 Right – Pictorial view of how to achieve high availability.
NexGen ATM System A Perspective National Workshop on Aviation Software Systems: Design for Certifiably Dependable Systems October 5-6, 2006 Presented by.
Understanding Network Failures in Data Centers: Measurement, Analysis and Implications Phillipa Gill University of Toronto Navendu Jain & Nachiappan Nagappan.
1 Disaster Recovery Planning & Cross-Border Backup of Data among AMEDA Members Vipin Mahabirsingh Managing Director, CDS Mauritius For Workgroup on Cross-Border.
Implementation of Distributed Air Traffic Control Simulator Ranko Radovanović, Miloš Cvetanović, Zaharije Radivojević School of Electrical Engineering,
© SAIC. All rights reserved. NATIONAL SECURITY ENERGY & ENVIRONMENT HEALTH CYBERSECURITY The Potential High Cost of Simple Systems Engineering Errors Jim.
High Availability Module 12.
1 © Mahindra Satyam 2009 Performance Testing as a Service using jMeter.
Air Traffic Control Software System Failure Case Study – As-is Scenario Presented by Stanley Dam For SE 6361 Advanced Requirement Engineering 10/25/2013.
Requirements Engineering
S/W Project Management
Old Policy – which no one ever seem to have heard of.
Trindel Insurance Fund
Dropped Object Awareness. Over 130 Members Worldwide.
Robert E. Meyers CCNA, CCAI Youngstown State University Manager, Cisco Regional Academy Cisco Networking Academy Program Semester 4, v Chapter 7:
Enterprise PI - How do I manage all of this? Robert Raesemann J Jacksonville, FL.
1 King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality Management Case study of 8-phases.
Graphs – data displays We will explore 3 types today. Bar Graphs, Frequency charts, and Histograms. We will do a quick review of other graphs and their.
Module 4: Planning, Optimizing, and Troubleshooting DHCP
Gauge Operation and Software by Scott A. Ager. Computer Recommendations 750 MHz Pentium III 64 Meg SRAM 40 Gig Hard Drive 1024 x 768 graphics CD Writer.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Presentation on Preventive Maintenance
Operation & Maintenance in ST-MA presented by Rui Nunes.
Continuation Training Record Keeping Meet the challenges of Ilka Wolf, Marketing & Sales.
Company for Urban Innovative Transport (CUIT) 19/12/2007 Request for proposal.
General HP LaserJet/DeskJet Printer Maintenance Training 4 Provided by: 4 Ed Quillian 4 For: 4 Harris PC-Technicians, EIT Dept.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
“I am not in the office at the moment. Send any work to be translated.”
1 Warning requirement for the management system of the REESS May, 2014 U.S. DOT Head Quarter 1200 New Jersey Avenue, SE Washington, DG JASIC.
Problem Management Scenario # 2 September 17,2005.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Presented to: By: Date: Federal Aviation Administration AIRWORTHINESS Positive Safety Culture Failure to Follow Procedures 1 R1.
Teknologi Pusat Data 12 Data Center Site Infrastructure Tier Standard: Topology Ida Nurhaida, ST., MT. FASILKOM Teknik Informatika.
NERC Lessons Learned Summary LLs Published in December 2015.
ADVANCED DIAGNOSTICS CONTINUING TO MEET TECHNOLOGY DEMANDS.
1 © Process Software Corp. DHCP Failover Protocol Jeff DECUS Europe 2000 Thursday, 13 Apr :00 - 9:45.
Introduction to ITSM processes. CONFIDENTIAL Agenda Problem Management  Overview  High Level process Change Management  Overview  High Level process.
1 Chapter Overview Using Standby Servers Using Failover Clustering.
SueDon Ltd - Business Continuity Management BCM Overview ©1999 SueDon Ltd Business Continuity Management.
System Development Life Cycle (SDLC). Activities Common to Software Projects Planning : Principles Principle #1. Understand the scope of the project.
Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Software Monitoring.
Intelligent Maintenance Program
Dealing with Database Corruption DBA 911. Who am I? 2 David M Maxwell twitter.com/dmmaxwell or twitter.com/upsearchsqltwitter.com/dmmaxwelltwitter.com/upsearchsql.
Network Monitoring Kathryn Hockman. What is Network Monitoring Network Monitoring involves the use of a system that is constantly monitoring a network.
Chapter 8. Electrical Systems
Database recovery contd…
Six Sigma Greenbelt Training
NERC Published Lessons Learned Summary
1+1 Ethernet Failover & Network Protection Switches
CIS 375 Bruce R. Maxim UM-Dearborn
Software Reliability Definition: The probability of failure-free operation of the software for a specified period of time in a specified environment.
Digital Chart Recorder Operation
OPS-7: Building and Deploying a Highly Available Application
Operation of Target Safety System (TSS)
Definitions Cumulative time to failure (T): Mean life:
Presentation transcript:

Air Traffic Control Software System Failure Case Study – To-be Scenario Presented by Stanley Dam For SE 6361 Advanced Requirement Engineering 12/07/2013

Summary of Problem VCSU was shutdown on its own without warning after 49.7 days of operation Backup system also failed within a minute after it was turned on Air Traffic Controllers could not communicate with 400 airplanes they were responsible for About 800 airplanes and 30,000 people were impacted System was down for 3 ½ hours

Four Worlds of RE for Air Traffic Control System. builds uses Airplane FAA/Air Traffic Controllers VSCS System Harris Corp contracts controls and communicates with needs to ensure safety of

PIG

Conclusion of Problem Inadequate Requirements “Server is timed to shut down after 49.7 days of use in order to prevent a data overload” workaround should NOT be acceptable Improper trainings for maintenance technicians

Proposed Functional Requirements The VCSU system shall report error to the System Manager The System Manager shall display category 2 (CAT2) alert upon receipt of system error The VCSU system shall not shutdown on CAT2 alert or below The VCSU system shall reset timer when it reaches zero without human intervention

Proposed Non-Functional Requirements VCSU system shall continue operation after reporting any errors to the System Manager System uptime should be equal or exceed 99.99% by a running primary redundancy backup system and a standby secondary backup system System level test of backup system should be done every 30 days to ensure proper functions

Concept of Operations (CONOPS) Air Traffic Controller VSCS VCSU (server) System Manager Maintenance Technician uses displays errors monitors / reports monitors

Questions? Thank You Good luck to everyone and see you next semester