Vacuum technologies of existing and future GW interferometers Aspera Technology Forum Darmstadt, 13-14 March 2012 C.Bradaschia, G.Parguez, A.Pasqualetti.

Slides:



Advertisements
Similar presentations
Laser Interferometer Gravitational-wave Detectors: Advancing toward a Global Network Stan Whitcomb LIGO/Caltech ICGC, Goa, 18 December 2011 LIGO-G v1.
Advertisements

Andrea Paoli AdV 1 st Project Review Cascina, November 3 rd, 2008 IME – infrastructure modifications for environmental noise reduction.
31/03/11FV 1 CEDAR from flammable gas safety point of view.
VIRGO: WHERE WE COME FROM WHERE WE ARE GOING GIOVANNI LOSURDO - INFN Firenze Advanced Virgo Project Leader for the Virgo Collaboration (and the LIGO Scientific.
Overview of Vacuum Systems Tejas Deshpande 24 July, 2014.
Heinz Grote1 Presentation to NSCX WENDELSTEIN 7-X Assembly Max-Planck- Institut für Plasmaphysik KKS-Nr.: 1-AD Dok-Kennz.: -Txxxx.0 Heinz Grote October.
Progress and Plan for Superconducting RF Cavity RF Group.
Design study for 3rd generation interferometers Work Package 1 Site Identification Jo van den Brand
Vac meeting 08 Oct 08 Agenda 1. needed operations for towers displacements (Frederic R.) final comments on the 2m bottom not accessible anymore 2. Larger.
LCGT seismic Attenuation System DRADF DRAFT DRAFT DRAFT.
LIGO-G W Is there a future for LIGO underground? Fred Raab, LIGO Hanford Observatory.
Status of the LIGO Project
PEEM III Endstation Design Review
Vacuum, Surfaces & Coatings Group Technology Department Vacuum tests for CLIC module prototypes 6 November 2013 C. Garion2 Outline: Reminder: specification.
KAGRA Vacuum System Items of vacuum sub-group 1 1. Overview VAC (YS) Required Pressure “uhv (ultra-high-vacuum)” in the order of Pa, or lower.
Solar Cell conductive grid and back contact
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
September 8, 2015 THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER Helios Vocca.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
LIGO-G v1 The LIGO Vacuum System and plans for LIGO-Australia Stan Whitcomb IndIGO - ACIGA meeting on LIGO-Australia 9 February 2011.
1 VAC – Vacuum system modifications Cascina, 03Nov08 A.Pasqualetti for the VAC contributors.
Cryogenics for LCGT Technical Advisory Committee for LCGT ICRR SUZUKI, Toshikazu High Energy Accelerator Research Organization.
1 VAC – Vacuum system modifications ERC telecon, 24Mar09 A.Pasqualetti for the VAC team.
Status of LCGT and CLIO Masatake Ohashi (ICRR, The University of TOKYO) and LCGT, CLIO collaborators TAUP2007 Sendai, Japan 2007/9/12.
Vacuum / cryo links Mechanical design issues Jo van den Brand, Martin Doets Nikhef Cascina, January 21,
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
AdV VAC design meeting Cascina, 19 July Agenda first discussion about vacuum design of central area - and pickoff chamber design in particular -
Optical Configuration Advanced Virgo Review Andreas Freise for the OSD subsystem.
Test mass dynamics with optical springs proposed experiments at Gingin Chunnong Zhao (University of Western Australia) Thanks to ACIGA members Stefan Danilishin.
LCGT Cryogenics Status Report KEK T.Suzuki.
31 May 2006Federico Paoletti Elba GWADW 1 Available traps (short sensors’ list) l Fast monitoring (50Hz < f sample < 20kHz)  vertical high frequency accelerometers.
LIGO-G D The LIGO-I Gravitational-wave Detectors Stan Whitcomb CaJAGWR Seminar February 16, 2001.
LIGO- G D The LIGO Instruments Stan Whitcomb NSB Meeting LIGO Livingston Observatory 4 February 2004.
T Akutsu 1, S Telada 2, T Uchiyama 1, S Miyoki 1, K Yamamoto 1, M Ohashi 1, K Kuroda 1, N Kanda 3 and CLIO Collaboration. 1 ICRR, Univ. of Tokyo, 2 AIST,
DFG-NSF Astrophysics Workshop Jun 2007 G Z 1 Optics for Interferometers for Ground-based Detectors David Reitze Physics Department University.
JRA3 STREGA - Introduction Geppo Cagnoli IGR – University of Glasgow ILIAS-GW Meeting, Orsay, 5 th -6 th Nov 2004.
Vacuum / cryo links Mechanical design issues Jo van den Brand, Martin Doets Nikhef Cascina March 4,
Advanced Virgo Optical Configuration ILIAS-GW, Tübingen Andreas Freise - Conceptual Design -
G5 Beam Line Vacuum System. G5 Beamline Vacuum System Design  Bakeable and Particulate free to Class 100 Clean Room quality Require Clean room QA and.
AdV Vacuum system changes, 23Feb2011 Central area vacuum equipment SVC 2 (mini) towers 1 new HV tower (Inj) DT,IB from HV->UHV towers (with additional.
Virgo-Material “macro” group M.Punturo. VIRGO-MAT2 VIRGO-MAT components Virgo-MAT is composed by three INFN groups –Firenze/Urbino M.Lorenzini, G.Losurdo,
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
The status of VIRGO Edwige Tournefier (LAPP-Annecy ) for the VIRGO Collaboration HEP2005, 21st- 27th July 2005 The VIRGO experiment and detection of.
“Detector activities” after the IB upgrade Michele Punturo.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
Solar Cells need a top side conductor to collect the current generated They also need a conductive film on the backside.
National Ignition Facility Vacuum Systems Presentation to OLAV Workshop, ORNL July 11-14, 2011 NIF Vacuum Subsystems Managers Igor Maslennikov* John Hitchcock.
LIGO G M Intro to LIGO Seismic Isolation Pre-bid meeting Gary Sanders LIGO/Caltech Stanford, April 29, 2003.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo LCGT internal review (Cryogenic payload) 30 January 2012.
LOGO Gravitational Waves I.S.Jang Introduction Contents ii. Waves in general relativity iii. Gravitational wave detectors.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo LCGT internal review (Cryogenic payload) 30 January 2012.
GWADW Elba Setting the stage GWADW2011, La Biodola Francesco Fidecaro Pisa.
ET Vacuum System 3 x (low frequency cryo-interferometer + high frequency warm-interferometer) Baseline solution Build one detector, the other two will.
THE NEXT GENERATIONS OF GRAVITATIONAL WAVE DETECTORS (*) Giovanni Losurdo INFN Firenze – Virgo collaboration (*) GROUND BASED, INTERFEROMETRIC.
Performance test of KAGRA cryostat at site
Installation of the T600 at Fermilab
Back-scattered light noise in Virgo 2nd Science Run data
Outline ideas/status K.A. Strain
Performance test of KAGRA cryostat at site
Is there a future for LIGO underground?
Advanced VIRGO Experiment
Martin Dommach TDR ART Review, Hamburg, September 14, 2012
Superattenuator for LF and HF interferometers
The Superattenuator upgrades and the SAFE Project
Advanced Virgo – Nikhef tasks
GEO HF Limits/Goals/Options…
Virgo Vacuum System – 3G challenges
AdV - Internal Review of VAC subsystem
KAGRA – 3km Cryogenic Laser Interferometer
The views of Virgo collaboration groups on upgraded/advanced Virgo
Presentation transcript:

Vacuum technologies of existing and future GW interferometers Aspera Technology Forum Darmstadt, March 2012 C.Bradaschia, G.Parguez, A.Pasqualetti E.G.O. Pisa, Italy Virgo Experiment

GW RESEARCH with INTERFEROMETERS (Ground Based) GW’s alternately squeeze and stretch space in two perpendicular directions To detect GWs, the laser interferometers allow to monitor the relative displacements of free masses (mirrors): order of 1E-18m (frequency band 10Hz-10KHz) for mirrors at km of distance Optics and laser beam are under vacuum to avoid several disturbances (index statistical fluctuation, gas damping, acoustic effects) +L+L -L-L 3rd ASPERA Technology Forum - Darmstadt, March 2012

GW ground based INTERFEROMETERS, present and future LCGT under construction GEO600 ET = third generation European interferometer is under design (EU design study completed) Present detectors are now being updated to increase their sensitivity x 10 3rd ASPERA Technology Forum - Darmstadt, March 2012

Advanced Detectors Stop data taking and start costruction works in progress Finalization and procurement of new parts Inizio funzionamento Advanced Virgo2015 ET design study achieved (funded by EU - FP7) done, 2011 tecnichal design, R&D on technologies construction (1 detector ) end of commissioning 2030 Evolution timeschedule 3rd ASPERA Technology Forum - Darmstadt, March 2012

VACUUM SYSTEM LAYOUT Main vacuum chambers (I and II generation detectors): Tubes: Contain just the laser beam Lenght 2 x 600m to 4km diameter = up to 1.2m Volume up to 9000 m 3 ! mbar for initial detectos for advanced ones (Noise scales as e P ) Mirror chambers Order of 10 chambers (one per principal mirror) several m 3 each Contaminants free (optics degratation) Large valves 1m diameter typical, to isolate, vent and access the mirror chambers HV or low vacuum chambers for optical benches and other parts 3rd ASPERA Technology Forum - Darmstadt, March 2012

Inside a Mirror chamber: a principal mirror with its positioning controls (Virgo suspended payload).  Glass baffles covers the chambers walls to absorb scattered light.  Not evident, equipment for thermal compensation of mirror curvature  Mirror chambers are normally baked once before optic inserption for cleaning purposes, and not baked with optics in – situ.  periodically accessed by personnel for tunings of equipment 3rd ASPERA Technology Forum - Darmstadt, March 2012

‘Central hall’: mirror chambers design depends on the seismic attenuation system  2m diameter in average, up to 11m high  Normally metal sealed (or double o- ring), single o-ring for HV compartments  raw material: 304L (316L)  Can incorporate order of 100 viewports in total (custom and standard design, BK- 7, ZnSe, FS) and signals feedthroughs 3rd ASPERA Technology Forum - Darmstadt, March 2012

The end mirror seen from the tube (Virgo)  tube contains just baffles (st. steel) to mitigate light scattering from pipe walls and the laser beam  The gas load from an entire baked tube (hydrogen) is normally less than from unbaked mirror chambers (recharged at each venting).  Baking of a km tube is an expensive and time consuming effort preserved with large cryogenic pumps (LIGO, and AdV) condensing water vapor on 77K surfaces. 3rd ASPERA Technology Forum - Darmstadt, March 2012

Much larger infrastructures will be required by ET 1 detector = low frequency cryo-interferometer + high frequency interferometer

Some figures for ET (single detector configuration) Pressure level in the tubes mbar view of the central hall

Dust and contamination would increase scattering and absorption of optical surfaces When vented, mirror and optical chambers become sort of ‘clean room’ (class 100 normally) thanks to filtered air flushing inside. Staged cleanliness control: they are opened only vs permanent or portable clean rooms (picture by LIGO) and also the general building cleanliness is cured After the 8 years of service we have not experienced degradations of the core optics, apart from dust (Virgo). Some point absorbers have been found, their origin is under study Absorption map of NI mirror, Ø300mm, average <2 ppm 3rd ASPERA Technology Forum - Darmstadt, March 2012

HV compartments, with lower vacuum reqts, can contain: Tens of m of Viton seals, a few km of cables, tens of motors, gears and complex metallic parts, magnets, tens of m 2 of kapton and teflon, epoxy adhesives... Normally are glass-separated (viewports with aperture of 350mm or more) or through differential pumping or cryogenic trap as a precaution against contamination Cleaning facilities on site: large ultrasonic baths, ultrapure water equipment, baking ovens

Tubes technologies Raw material 304L, 1000 tons (Virgo or LIGO) 1.2m m diameter Two designs: _ Plain wall (3.2 or 4 mm thick), stiffeners and bellows _ corrugated wall, 0.8mm thick (316L, GEO600) Assembled joining modules from 5 to 20m length Joints welded in-situ: butt (LIGO) or lip (Virgo, GEO600) 3rd ASPERA Technology Forum - Darmstadt, March 2012

Tube technologies In vacuum surface = m 2 ‘Firing’ as outgassing reduction treatment (hydrogen) = 400°C in air for 1-3 days, rates of a few mbar.l/s.cm Applied on raw material (LIGO) or on finished modules (Virgo ) Test procedures during assembly: _Leak test on each module _Leak test on each single welded joint (LIGO) or on sections of assembled modules (Virgo, including bake) Baking in vacuum: modules are yhen wrapped with thermal insulation and heated DC joule effect up to 150C for some days ET challenges about tubes: Economics Assembly underground in narrow space Tests, repairs and quality controls Baking (heat exhaust, pseudo valves) 3rd ASPERA Technology Forum - Darmstadt, March 2012

Pumping system requirements:  main chambers have a complete pumping system to go from atmosphere to specified vacuum level  Oil free pumps are used, against contamination risk  Low acoustic / seimic / emagnetic emissions to not perturb (pumps drivers included)  Long running without frequent maintenance needs to accomplish long data taking Ion / TSP / cryogenic (liquid bath) pumps or magnetic bearings turbo-pumps are normally used in data taking phase (here 2 x 2500 l/s N 2 Ion pumps - LIGO) An example of statistic (Virgo) 25 Dry roughing/backing pumps Turbo-molecular pumps 28 Auxiliary Ion pumps 38 Titanium sublimation pumps 20 Residual gas analyzers 221 Angle valves 111 Gate valves (size up to 250mm or similar) 4+6 Large gate valve 1m to 400mm diameter 150 Pressure gauges

Thanks to the large tube conductance, pumping stations are a few (Virgo)

Pumping system details  Cryogenic pump <= 20K under evaluation (with low seismic/acoustic noise ) order of 5000l/s for instance, to pump water and residual air down to mbar shortening recovery times of frequently vented chambers  Mechanical vibrations: ( Hz) the magnetic turbomolecular pumps are normally installed with bellows while the backing pumps (25 Hz) are displaced far away or run intermittently  Control system SW & HW becoming more integrated with experiment; pumps and gauges permanently monitored also to check possible coeherences = disturbances 1 m 3rd ASPERA Technology Forum - Darmstadt, March 2012

IVC mbar HV mbar UHV mbar Anti-sismic Suspension Conductance Pipes Thin Kapton Diaphrams Mirror