Towing Vessel Bridging Program Mr. Mike White Towing Vessel Branch Coast Guard District Eight.

Slides:



Advertisements
Similar presentations
2014 NAMEPA: Winds of Change in Offshore Oil & Gas Regulatory: Coast Guard Introduction CAPT David Nichols US Coast Eighth District Outer Continental Shelf.
Advertisements

United States Coast Guard Marine Safety, Security, and Stewardship 1 U.S. Coast Guard Regulations “Making a difference” 1 Jeff Lantz Director, Commercial.
OSHA’s Fall Protection Requirements
1 Safety Management. 2 Safety Management Systems What is the ultimate Goal of Safety Management? The ultimate goal of safety management is to provide.
Maritime Transportation Security Act (MTSA) Towing Vessels.
Unregulated Low-Stress Hazardous Liquid Pipelines Mike Israni & John Gale Aug 5, 2009.
Welcome to a Towing Vessel Conversation USCG Sector Honolulu Prevention Department.
U.S. Coast Guard Navigational Safety. Objectives IDENTIFY applicable Navigational Rules for intended route. EXAMINE navigation lights. EXAMINE Automatic.
Marine Industry Day 2014 Towing Vessel Bridging Program Update LCDR Craig Toomey Sector New Orleans Domestic Vessel Inspections Sector New Orleans.
1 OSHA FEDERAL OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) OF 1970 George Mason University College of Nursing and Health Science Regulatory Requirements.
UPDATE: NEW REQUIREMENTS FOR COMMERCIAL FISHING INDUSTRY VESSELS Coast Guard Authorization Act of 2010 (Public Law ) UPDATE: NEW REQUIREMENTS FOR.
ASME Nuclear Conformity Assessment
U.S. Coast Guard Homeland Security Hazardous Conditions What are they? How do we address them? 6/9/2015 Towing Vessel National Center of Expertise 1.
Implementation of STCW Regulations
Office of Marine Safety Regulatory Issues Liam LaRue.
FSMA: Where We’ve Been and Where We’re Going Supplemental Notices of Proposed Rulemaking Public Meeting November 13, 2014 Roberta F. Wagner, B.S., M.S.
Safety Standards for LNG Fueled Vessels Marine Chemist Qualification Board Baltimore, MD October 23, 2014 CAPT John W. Mauger Office of Design & Engineering.
Check list ISM Code DOC.
XII International Seminar of Russian Maritime Register of Shipping Port State Control in the United States – 2008 Annual Report & Recent Developments Mr.
Manning & Watch Keeping
Alternative compliance program
1 Public Release Authorized National Academy of Engineering / National Research Council National Academy of Engineering / National Research Council Captain.
U.S. Coast Guard Notice of Proposed Rulemaking
Salvage and Marine Firefighting Requirements: Vessel Response Plans for Oil 33 CFR Part 155.
Proposed Rules to Help Ensure the Safety of Imported Food 1.
WELCOME The Fixed Fire Suppression Systems. We carry out the supply installation & Annual required maintenance in regard to the fixed.
U.S. Coast Guard Homeland Security 8/18/2015 Marine Safety Unit Paducah, Towing Vessel Bridging Program 1 MSU Paducah Towing Vessel Bridging Program LTJG.
TOWING VESSEL NATIONAL CENTER OF EXPERTISE Towing Vessel National Center of Expertise 1.
Bend, OR | Eugene, OR | Portland, OR | Salem, OR | Seattle, WA | Vancouver, WA | Washington D.C. Subchapter M Towing Vessel Safety Management.
1 A Bridge to Inspection… CDR Lee Boone Chief, Domestic Vessel Division Mr. Patrick Lee Towing Vessel, National Program Coordinator.
1 Maritime Targeting and Boarding Overview. 2 Objectives Notice of Arrival requirements Targeting Boardings & Examinations –Security Boardings - Targeted.
MARITIME SECURITY STATUS REPORT JOSEPH ANGELO U.S. COAST GUARD.
Delivering Legal Services Executing the Mission Delivering Legal Services Executing the Mission Tulane Admiralty Law Institute March 11 – 13, 2015 New.
Enhancing Partnerships in Support of the Maritime Sector: An Overview of Transport Canada Initiatives 20 th CMC Towboat Conference May 25, 2013.
March Why is MassDEP proposing new UST regulations? DFS’s regulation: standards for tanks construction, installation, O&M, decommissioning and.
5Emergency Response Onboard Vessels Objective To ensure that the shipmaster and the crew can manage and respond successfully to any emergency onboard a.
Clean Boating Act of 2008 (P.L ) Sport Fishing & Boating Partnership Council March 4, 2011.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Oil Spill Response Plans A History Lesson PHMSA Review and Approval.
Federal Rulemaking Primer January 29, 2016 First Published: April 24, 2013 Producer: Alexander Perry Director: Afzal Bari.
Safety and Health Program Don Ebert- Risk Manager (509)
Classroom Module 1 Administrative Inspection Procedures Exam Guide pg. 6.
Western Rivers/ Inland/ Great Lakes
Towing Vessel National Center of Expertise Subchapter M Towing Vessel National Center of Expertise.
US Army Corps of Engineers BUILDING STRONG ® Engineering & Design Considerations for Shipboard Safety Timothy Keyser, P.E. Presentation for PIANC USA /
Towing Vessel National Center of Expertise
Towing Vessel National Center of Expertise
Utilizing the RCP to Comply with Subchapter M
GCC CODE “THE SAFETY REGULATIONS FOR SHIPS THAT ARE NOT COVERED BY THE INTERNATIONAL CONVENTIONS” THE CABINET RESOLUTION NO.(29) OF 2013.
Sub M - Implementation 1.
Towing Vessel National Center of Expertise
Towing vessel NATIONAL Center of Expertise
FREQUENTLY ASKED QUESTIONS
U.S. Coast Guard Notice of Proposed Rulemaking
Merchant mariner shore side access requirements for mtsa facilities MST2 Jeromy Cowell MSD Sturgeon Bay.
Vessels and Facilities that are Temporarily Out of Service or Laid-up
USCG Investigations LT Allan Storm.
Common Deficiencies in Sector Northern New England
Towing Vessel Bridging Program
MEPAC March 2017 Task 95 Inland Fire Fighting Requirement's for towing vessel watch officers MASTERS/PILOTS Maritime Services Group of Louisian, LLC.
Know Your Revised Alternate Security Program (ASP) Jen Wilk
Establishing the Infrastructure for Radiation Safety Preparatory Actions and Initial Regulatory Activities.
Compliance Options & TSMS Process
Clarifying Sub M Compliance
Towing Vessel National Center of Expertise
A Bridge to Inspection…
U.S. Coast Guard LCDR Brett Thompson.
2018 Greater New Orleans Fleeting Barge Association
Towing Vessel National Center of Expertise
Subchapter M 6 Month Review
North American Emission Control Area
Presentation transcript:

Towing Vessel Bridging Program Mr. Mike White Towing Vessel Branch Coast Guard District Eight

Towing Vessel Bridging Program Why do we need a bridge?

A Phased Approach… Phase 1 Outreach & Education IIEs Testing of Risk Tool Qualification/PQS Id of FORs Phase 2 Prioritized Exams Course Development Comments on NPRM 100% FORs examined Phase 3 COI Issuance Formal Training Summer 2009 Subchapter “M” Published Law Enforcement Boarding's & Surge Operations

Phase I results… New UTV examiners are qualified/knowledgeable and have built industry partnerships TVNCOE stood up and running course/portal Industry Initiated Exams YTD– 2520 Def Checks YTD – 1388 Decals Issued YTD – 2089 – Decal is not the goal Industry and CG consider TVBP a success (positive press/flag letters/outreach/peer pressure)

Phase 2 Prioritization Matrix Company has not participated in Phase 1 Vessel has not been examined High Priority Vessel Company participating in Phase 1 Vessel has not been examined Low Priority Vessel Company participating in Phase 1 Vessel has been examined Non-Priority Vessel

D8 efforts thus far… D8 Fleet of Responsibility 3955 vessels 134 UTV Examiners in D8 Participating in all SIX (6) WGs, TSAC, OMSA, and AWO meetings

UTV Fleet of Responsibility

D8 FOR Breakdown Sector Houston 499 Sector Corpus 83 Sector New Orleans1563 Sector Mobile 224 Sector Lower 237 Sector Upper 416 Sector Ohio Valley 933 D8 Total =3955

Common Deficiencies Fire Detection Fuel Shut Offs Fire Pumps B-V Semi Portable Fire Extinguisher General Alarm issues, Blue Light, Signage Fixed Piping (Oil Discharge)

U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Aug 11, 2011

Vessels Inspection of Towing Vessels Reason for Proposed Rule The CG & Maritime Transportation Act of 2004: Added towing vessels as a class of inspected vessels. Authorized the establishment of a safety management system for towing vessels. Authorized the USCG to prescribe maximum hours of service for individuals on towing vessels at least 26 feet in length. Line-Haul Towboat

Inspection of Towing Vessels Current Regulatory Status: Towing vessels are regulated but most are not inspected. The USCG does not issue Certificates of Inspection (COI) to towing vessels unless they are over 300 GT and in oceans service. Certain tow vessel components/operations are only subject to USCG regulations that are: Specific to towing vessels Applicable to all uninspected vessels Applicable to all vessels The USCG may board towing vessels for safety and security checks at any time. Ocean-going Tugboat

Inspection of Towing Vessels Historical Background of the Rule Dec 2004: The USCG published a notice with request for comments, as well as a notice of public meetings. Four public meetings were held. American Bureau of Shipping Group (ABSG) Report: 1-year contractor-supported study: Categorized the industry Analyzed casualty data Provided economic data The USCG visited companies and vessels and internally reviewed accident histories.

Inspection of Towing Vessels Building the Rule TSAC involvement: TSAC/USCG began working together in the fall of Interactive project. Nearly 200 industry representatives participated. Added time to the project but produced dividends at the end. Incorporated TSAC recommendations into the rule. Line-Haul Towboat

Inspection of Towing Vessels Notice of Proposed Rulemaking Adds new subchapter (M) to 46 CFR. Establishes baseline regulations for inspected towing vessels. Defines the Towing Safety Management System (TSMS). Prescribes qualifications for third-party auditors and related procedures. Prescribes procedures for vessel compliance and obtaining a certificate of inspection (COI). Reflects cooperation with TSAC. Operations in fleeting area

Inspection of Towing Vessels Key Elements Standards (lifesaving, fire protection, machinery, etc.): Developed specifically for towing vessels. Applicability: Limited to “traditional” towing vessels—for now. Focused on risk. Safety Management System: The core of operations and compliance. Addresses the human element. Ties management to vessels. Used throughout manufacturing, financing, transportation (ISM mandated, RCP proprietary). Facilitates audited compliance activities. Third-party auditors and surveyors: Allows for flexibility—service when/where needed. Allows the CG to focus on the areas of greatest risk. Coast Guard Option

Inspection of Towing Vessels 46 CFR subchapter M: Part 136—CERTIFICATION Part 137–VESSEL COMPLIANCE Part 138—TOWING SAFETY MANAGEMENT SYSTEMS (TSMS) Part 139—THIRD-PARTY ORGANIZATIONS Part 140—OPERATIONS Part 141—LIFESAVING Part 142—FIRE PROTECTION Part 143—MACHINERY AND ELECTRICAL SYSTEMS AND EQUIPMENT PART 144—CONSTRUCTION AND ARRANGEMENT Line Haul

Inspection of Towing Vessels Applicability In general, this regulation would apply to towing vessels ≥ 26 ft., as well as any towing vessels pushing, pulling, or hauling a barge carrying dangerous or hazardous materials. Towboat pushing two covered hoppers, likely carrying grain, and one tank barge.

Inspection of Towing Vessels Towing Safety Management System Risk-based: Analysis of accident data and experts’ inputs. Human factors: training, safety drills, crew endurance management program, restrictions on hours of service. Equipment: lifesaving, fire protection, electrical and machinery, vessel operational requirements. Recordkeeping. View from the pilothouse

Inspection of Towing Vessels Proposed Third Party Concept The USCG approves third-party auditors and surveyors. + Companies implement TSMS and ensure vessels meet standards. + Third parties verify compliance (Audit TSMS / Survey vessels). + The USCG boards vessels (Initial / 5yrs / Risk). + The USCG reviews reports. = Certificate of Inspection issued to vessels in compliance. WorkboatHarbor Tugboat

Inspection of Towing Vessels Towing Company Responsibilities Develop and implement TSMS on vessels and shore side operations. Operate under TSMS. Maintain vessels in compliance with regulations and TSMS. Tugboat backing bow around

Inspection of Towing Vessels Third Party – Auditor and Surveyor Responsibilities Review TSMS and approve TSMS if it complies with the proposed requirements. Audit TSMS and vessels. Survey towing vessels. Articulated tug-barge in open waters

Inspection of Towing Vessels Coast Guard Responsibilities Approve and oversee third-party auditors and surveyors. Ensure CG inspection of every towing vessel at least once every 5 years. Additional risk-based boarding of towing vessels. Issue Certificate of Inspection (COI). Tow transiting lock

Inspection of Towing Vessels Affected Vessels 5,208 Towing Vessels (including towboats and tugboats). Vessels operating in inland rivers, Great Lakes, coasts, and oceans. Perform line-haul, fleeting, and harbor assist operations. Affected Companies 1,059 owner/operator companies. 327 companies, with either a full safety management system or similar program, control 2,941 vessels. 827 companies, without safety management systems or similar programs, control 2,267 vessels.

Inspection of Towing Vessels Compliance Phase-in for a Towing Company Final Rule TSMS 2yrs fm FR YR 11 YR 0 YR 6 YR 2 COI 4yrs fm TSMS 25% p/yr Deferred Machinery & Electrical (M&E) 5yrs fm COI Deferred redundancy M&E 5yrs from COI Compliance

Questions?